CM-2016-1132 - 6/17/2016STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO.2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: BROWN & GAY ENGINEERS, INC. ("Engineer") ADDRESS: 7000 N. Mopac, Suite 330, Austin, TX 78731 PROJECT: 2015 CAMPO TAP Applications This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Brown & Gay Engineers, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 24th day of July, 2015 for the 2015 CAMPO TAP Applications Project in the amount of $34,682.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on November 13, 2015 to amend the scope of services and to increase the compensation by $13,114.00 to a total of $47,796.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $12,054.00 to a total of $59,850.00; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering_ Services shall be amended as set forth in the attached Addendum To Exhibit B. II. Article 4, . Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $12,054.00 the lump sum amount payable under the Contract for a total of $59,850.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract 0199.1532; 00358352 1 6AA--21(,.-113Za Rev.12/01 /08 84275 BROWN & GAY E GIN ERS, INC. By: i P.E. Ag6c:jxF N o wt SIST EMS JUNE is o zo A Date CITY OF UNDQR,OCK By: Alair r xa , Date Supplemental Contract 0199.1532;00358352 2 APtA) D AS TO F RM: SteSheets, City Attorney Rev. 12/01/08 84275 ADDENDUM TO EXHIBIT B Engineering Services Project Understanding This scope of work includes four separate tasks for evaluation of potential impacts to historic resources under Section 106 of the National Historic Preservation Act (NHPA) for the City of Round Rock Southwest Downtown Infrastructure Improvements Project, Phase 5B. Project Coordination Request (PCR) has been approved by the Texas Department of Transportation (TxDOT) Environmental Affairs Division (ENV) under the assumption that the following tasks will be undertaken in order to complete the Section 106 process. Task A — Prepare a Draft and Final Historic Resources Research Design Task B — Conduct a Historic -Age Resources Reconnaissance Survey Task C — Prepare a Draft and Final Report for Historical Studies Survey Task D — Section 106 coordination efforts The proposed project consists of infrastructure improvements in downtown Round Rock, including installation of sidewalk pavers and modification of the existing curbs and gutters. Improvements would be made at the following locations: along Blair Street from Main Street to McNeil Road; along W. Bagdad Avenue from Brown Street to McNeil Road; along E. Bagdad Avenue from McNeil Road to Lampasas Street; along Florence Street from Blair Street to McNeil Road; and along McNeil Road from Lake Creek Bridge to W. Bagdad Avenue. The proposed project would be locally funded by the City of Round Rock. Scope of Work Task A Prepare a Draft and Final Research Design in accordance with TxDOT's Documentation Standard for Historic Resources Research Design (April 2014). The Draft Research Design will be submitted to the TxDOT Austin District, and TxDOT ENV for review and comment, and any necessary revisions will be incorporated prior to submittal of the Final Research Design. The Research Design will build off of information provided in the PCR previously completed for the proposed project. Approval of the Research Design by TxDOT ENV is required prior to initiation of the efforts described in Task B. Task B Conduct a Historic -Age Resources Reconnaissance Survey in compliance with TxDOT and Texas Historical Commission (THC) standards. The survey will follow the methodology prescribed in the TxDOT ENV -approved Research Design. Task C Following completion of Task B, prepare a Draft and Final Report for Historical Studies Survey in accordance with TxDOT's Documentation Standard for Reconnaissance Survey Report (April 2014). The report will be submitted to the TxDOT Austin District, and TxDOT ENV for review and comment, and any necessary revisions will be incorporated prior to submittal of the Final Report for Historical Studies Survey. Task D Provide support for coordination efforts with the City of Round Rock, TxDOT Austin District, and TxDOT ENV, as necessary, to address any comments on the Research Design or Report for Historical Studies Survey. Coordination with the Williamson County Historical Commission (CHC) and Round 01 Rock Certified Local Government (CLG) will also be required and will include a 30 -day comment period (per 36 CFR 800). Deliverables 1. Draft Research Design 2. Final Research Design 3. Draft Report for Historical Studies Survey 4. Final Report for Historical Studies Survey Assumptions Additional tasks beyond those described above, including intensive historic resources survey, are not included in this scope of work and accompanying fee estimate. If this or other similar tasks are deemed necessary, a separate scope of work and fee estimate can be provided. ral CO 00 1-4- N O O 't d) LO O Cq 00 CO I- J (3) L OO Lf) Q (O U) 00 O) O 1 N d N N 0 U3, (fi Efi U), T- N C (D 00 N• N C) N O 00 V' OC) OO O Cl)0 ([) m r C 0.) O (O M O O CO N � co _ V r N N r ,Q Ef} (f} Eli EA 69. 3 U) N N 0 m U 0 0 0 0 O L O O O O O a+ 0 O O O O O Eli Eli Eli Eli to. N O U O O o 0 O 0 J o h0 v- d' v- O Eli M M M70 r ell fC O J N 7 O = O N N N CO i— O m cc J C o>:3 U U) OO U) C C CD N Ln (B U U C C 0 O a ai=w C R O O f' U (6 O0 Q C a3 2 W O N U LL 0) LL O - Q r Co � CID J Q i O Ln 0 2 0 U) ~ Y Y Y Y Q City of Round Rock ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: 2015 CAMPO TAP Applications. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 6/17/2016 Dept Director: Gary D. Hudder Cost: Indexes: Attachments: SC#2 with Brown Gay Engineers, Inc. - 2015 CAMPO Tap Applications (00358352xA08F8).pdf Department: Transportation Department Text of Legislative File CM -2016-1132 2015 CAMPO TAP Applications. As part of the award of TAP funds for sidewalk construction, The Texas Department of Transportation (TxDOT) is requiring the City of Round Rock (CORR) to conduct a Full Historical Survey of the Southwest Downtown Phase -513 (SWDT-5B) project area; this survey will be used by the Texas Historical Commission (THC) to review and potentially approve the CORR's request for a Categorical Exclusion (CE). Brown & Gay Engineers, Inc. is coordinating with Hicks & Company to perform the historic study. This supplemental agreement includes an expense for this amount in addition to direct labor costs. The Transportation Department recommends that the City of Round Rock execute a contract with Brown & Gay Engineers, Inc. in the amount of $12,054.00 in exchange for coordinating with Hicks & Company to complete the full historic survey on behalf of the City of Round Rock. Staff recommends approval. City of Round Rock Page 1 Printed on 6/1712016