R-06-01-26-10A1 - 1/26/2006RESOLUTION NO. R -06-01-26-10A 1 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Cash Construction Company, Ltd. for the Red Bud Lane (CR 122) Street Improvements Project and the East Water Transmission Line Phase 3-A Project, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 3, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 3 to the Contract with Cash Construction Company, Ltd., a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 26th day of January, 2006. @PFDesktop\::ODMA/WORLDOX/0:/WDOX/RESOLUTI/R60126A1.WPD/sc ATTEST: R. N , LL; Mayor ity of Round Rock, Texas CHRISTINE R. MARTINEZ, City Secretar, 2 CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER FORM PROJECT: MANAGING DEPT: JOB NO. CR 122 STREET IMPROVEMENTS PHASE I & II/EAST WATER TRANSMISSION MAIN, PHASE 3-A DEPARTMENT OF PUBLIC WORKS 0601-2-058-27 In consideration of the Change Order agreed to herein as complete equitable adjustments and full and final payment for the Contractors additional work, the Contractor hereby releases the Owner from any and all liability under this contract for further equitable adjustments, including additional time for performance, attributable to such facts or circumstances giving rise to the proposal for adjustment. PAGE: 1 DATE: 10/15/2005 CHANGE ORDER NO.: 3 ITEM NO. C.O. CATEGORY FND AGY ORG (Funding Source) DESCRIPTION (Including Unit Price Bid Line No., Author, Reason & RFP No.) ADDED DAYS AMOUNT Increases 95 FIRE HYDRANT ASSEMBLY (5 EA @ 52800.00 - $14,000.00) 3.0 $14,000.00 LOWER 16" WATER LINE DUE TO FIBER OPTIC LINE STA.6+25 - 7+25 2.0 $1,000.00 100 LF @ 10.0041,000.00 ADDITIONAL FITTINGS FOR VALVE VAULT. MOVE VAULT OVER DUE TO 5631.74 FIBER OPTIC LINE (2-11-1/4 DEG. BEND, 2 16" SOLID SLEEVES) ADDITIONAL EXCAVATION FOR MOVING VALVE VAULT (3 DAYS @$1500.00) 3.0 $4,500.00 CHANGE WATER LINE ASSIGNMENT AT BOX CULVERT. MOVE LINE OUT $1,820.00 FROM UNDERNEATH BOXES (ADDITIONAL FITTINGS) LOWER WATER LINE AT STA. 33+00 DUE TO EXISTING FORCE MAIN 2.0 53,000.00 HOE RAM 3 DAYS ADDITIONAL HOE RAMMING DUE TO GAS MAIN STUB AT STA. 38+52 1.0 $1,500.00 INSTALL NEW VALVES AND TEE'S ON MANVILLES 4" MAIN, CUT AND PLUG 2.0 $1,990.65 LINE AT OLD OAKS DRIVE STA. 40+00 - MANVILLE WATER SERVICE - RELOCATED AND LOWER DUE TO 2.0 $2,400.00 CONFLICT WITH SUBGRADE (2 DAYS- DAILY LANE CLOSURE) ADDITIONAL ROCK EXCAVATIN FOR ARV'S DUE TO CONFLICT WITH GAS 2.0 53,000.00 MAIN (3 EA. @ 51000.00) STA. 57+ 80- 12" GAS CROSSING CONFLICT - ROCK EXCAVATION UNDERNEATH $1,200.00 SUBTOTAL THIS PAGE 17.0 $35,042.39 i SUBTOTAL OTHER PAGES 9.0 $12,761.44 CONTRACTOR ®i COMBINED TOTAL 26.0 $47,803.83 e �4( CONTRACTOR'S REPRESENTATIVE DA E TITLE CONSTRUCTION INSPECTOR DATE Aftl 2*21' C3— PROJEC EN NEER DATE PROJECT MANAGER THIS CHANGE ORDER 1.56% PREVIOUS CHANGE ORDER(S) 0.61% $47,803.83 $18,600.00 CHANGE ORDER(S) TO DATE 2.16% $66,403.83 ORIGINAL CONTRACT PRICE $3,070,433.00 ORIGINAL CONTRACT PRICE DATE PLUS CHANGE ORDER(S) $3,136,836.83 DATE a EXHIBIT HAI! 0 r- Red Bud Lane(CR 122) Phase 3 N 06 x— CD 0 CO al 0- Red Bud Lane(CR 122) DATE: January 19, 2006 SUBJECT: City Council Meeting - January 26, 2006 ITEM: *10.A.1. Consider a resolution authorizing the Mayor to execute Change Order No. 3 with Cash Construction Company for the CR 122 Street Improvements Project and the East Water Transmission Line, Phase 3-A Project. Department: Transportation Services Staff person: Thomas G. Martin, P.E., Director of Transportation Services Justification: This change order is for additional work associated with lowering the 16" waterline due to the conflicts with the SBC fiber optic line, to relocate and lower Manville water service due to conflict with proposed roadway grades, and additional rock excavation due to conflicts with gas main. Funding: Cost: Source of funds: $47, 803.83 1998 GO Bonds Outside Resources: Cash Construction Company, Ltd. Background information: The contract for the reconstruction of Red Bud Lane was awarded to Cash Construction Company, Ltd., on July 26, 2004. Public Comment: N/A CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER FORM PROJECT: MANAGING DEPT: JOB NO. CR 122 STREET IMPROVEMENTS PHASE I & II/EAST WATER TRANSMISSION MAIN, PHASE 3-A DEPARTMENT OF PUBLIC WORKS 0601-2-058-27 In consideration of the Change Order agreed to herein as complete equitable adjustments and full and final payment for the Contractors additional work, the Contractor hereby releases the Owner from any and all liability under this contract for further equitable adjustments, including additional time for performance, attributable to such facts or circumstances giving rise to the proposal for adjustment. PAGE: 1 DATE: 10/15/2005 CHANGE ORDER NO.: 3 ITEM NO. C.O. CATEGORY FND AGY ORG (Funding Source) DESCRIPTION (Including Unit Price Bid Line No., Author, Reason & RFP No.) ADDED DAYS AMOUNT Increases 95 FIRE HYDRANT ASSEMBLY (5 EA @ $2800.00 - $14,000.00) 3.0 $14,000.00 LOWER 16" WATER LINE DUE TO FIBER OPTIC LINE STA.6+25 - 7+25 2.0 $1,000.00 100 LF @ 10.00=$1,000.00 ADDITIONAL FITTINGS FOR VALVE VAULT. MOVE VAULT OVER DUE TO $631.74 FIBER OPTIC LINE (2-11-1/4 DEG. BEND, 2 16" SOLID SLEEVES) ADDITIONAL EXCAVATION FOR MOVING VALVE VAULT (3 DAYS @$1500.00) 3.0 $4,500.00 CHANGE WATER LINE ASSIGNMENT AT BOX CULVERT. MOVE LINE OUT $1,820.00 FROM UNDERNEATH BOXES (ADDITIONAL FITTINGS) LOWER WATER LINE AT STA. 33+00 DUE TO EXISTING FORCE MAIN 2.0 $3,000.00 HOE RAM 3 DAYS ADDITIONAL HOE RAMMING DUE TO GAS MAIN STUB AT STA. 38+52 1.0 $1,500.00 INSTALL NEW VALVES AND TEES ON MANVILLES 4" MAIN, CUT AND PLUG 2.0 $1,990.65 LINE AT OLD OAKS DRIVE STA. 40+00 - MANVILLE WATER SERVICE - RELOCATED AND LOWER DUE TO 2.0 $2,400.00 CONFLICT WITH SUBGRADE (2 DAYS- DAILY LANE CLOSURE) ADDITIONAL ROCK EXCAVATIN FOR ARV'S DUE TO CONFLICT WITH GAS 2.0 $3,000.00 MAIN (3 EA. @ $1000.00) STA. 57+ 80- 12" GAS CROSSING CONFLICT - ROCK EXCAVATION UNDERNEATH $1,200.00 SUBTOTAL THIS PAGE 17.0 $35,042.39 % 7 SUBTOTAL OTHER PAGES 9.0 $12,761.44 CONTRACT / / COMBINED TOTAL 26.0 $47,803.83 CONTRACTORRESENTATIVE DAT TITLE CONSTRUCTION INSPECTOR PROJECT ENGINE R DATE 12- 2�3 •�, DATE THIS CHANGE ORDER 1.56% PREVIOUS CHANGE ORDER(S) 0.61% $47,803.83 $18,600.00 CHANGE ORDER(S) TO DATE 2.16% $66,403.83 ORIGINAL CONTRACT PRICE 53,070,433.00 ORIGINAL CONTRACT PRICE PLUS CHANGE ORDER(S) $3,136,836.83