R-06-02-09-10D1 - 2/9/2006RESOLUTION NO. R -06-02-09-10D1 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with H. Deck Construction for the Wastewater Collection System Rehabilitation of Three Edwards Aquifer Basins, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 3, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 3 to the Contract with H. Deck Construction for the Wastewater Collection System Rehabilitation of Three Edwards Aquifer Basins, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 9th day of February, rev ATTES CHRISTINE R. MARTINEZ, City Secreta @PFDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/R60209D1.WPD/rmc L, yor Round Rock, Texas CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Public Works PROJECT: 2003-2004 Wastewater Collection System Rehabilitation ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: $1,200,298.00 $120,867.30 $51,136.20 $172,003.50 CHANGE DATA PAGE 1 OF 1 DATE:1-6-06 EXHIBIT ..0 '� nAn CHANGE ORDER NO: 3 JUSTIFICATION: 1 Final Payment ITEM # DESCRIPTION OF CHANGES UNIT QTY. UNIT PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING 1 Remove the work to perform complete line replacement for Job No. 1037 per Change Order #2 LS _. -1 $44,316.30 ($44,316.30) � 2 18" SDR pipe by open cut due to alignment of bore pit on the east side of Line Replacement #2005 and additional length of pipe on west side including concrete encasement, gabian baskets, and 22 CY of concrete to stabilize the trench backfill; lowering of Line Replacement #2008 to work with inverts; remibursement for Alexander's yard; and 3 repairs to AC waterline. LF 223.5 $200.00 $44,700.00 45.00 3 Line Replacement #2005, extension of bore to 500 feet LF 20 $550.00 $11,000.00 4 Additional Fencing LF 539 $30.00 $16,170.00 5 Sod, additional square yard for restoration at Surrey and Magnolia SY 900 $10.00 $9,000.00 6 Point Repair prior to Pipe Bursting EA 1 $2,500.00 $2,500.00 7 Additional Footage for Urethane Chimney Seal VF 32.22 $375.00 $12,082.50 TOTAL: $51,136.20 45.00 PREPARED BY: ENGINEER rt DE -CS COAMTT: 1/6/2006 DATE BY: TITLE: IV . 14A. fk CONTRACTOR APPROVED: CITY OF ROUND ROCK PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: PREVIOUS CHANGE ORDER: TOTAL % CHANGE: ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $51,136.20 $120,867.30 14.33% $1,372,301.50 constco2/forms6/1k t 8/GRAPHICS/COUNCIL AGENDA ITEM/ENGINEERING/2004M/W INSPECTION PROGRAM/EDWARDS AQUIFER WW COLLECTION SYSTEM REHABILITATION_Dec2004 DATE: February 2, 2006 SUBJECT: City Council Meeting - February 9, 2006 ITEM: *10.D.1. Consider a resolution authorizing the Mayor to execute Change Order No. 3 with H. Deck Construction Company for the 2003-2004 Wastewater Collection System Rehabilitation of three Edwards Aquifer Basins. Department: Water and Wastewater Utilities Staff Person: Tom Clark, Director Justification: The City is required to inspect, repair, and certify its wastewater collection system is in compliance with the TCEQ's Edwards Aquifer Recharge Zone Protection Program. The elimination of defects reduce inflow and infiltration entering the sewer system, thereby reducing the City's treatment cost to the LCRA and BRA, who own and operate the Brushy Creek Regional Wastewater Treatment Plant. This is the final Change Order on this contract and primarily adjusts final installed quantities. During the course of this rehabilitation project, some tasks such as yard restoration, fence replacement, pipe length, concrete encasement, erosion control, waterline repair, and manhole repair required additional quantities which resulted in an increased cost to the total project cost. The table below summarizes the original contract amount, project change orders, and the total percentage change to the original contract amount. Original Contract This Change Order Previous Change Orders Total °A) Change Original Contract plus Change Orders $1,200,298.00 $51,136.20 $120,867.30 14.33 $1,372,301.50 Funding: Cost: Source of funds: Capital Project Funds- Wastewater Utility $51,136.20 Outside Resources: RJN Group, Inc. (Engineering Consultant) Background Information: This project is rehabilitating defective areas determined from the 2002-2003 Wastewater Collection System Inspection Project in three Edwards Aquifer Basins (LC15-Z, LC16-Z, and CC34-Z). The scope of the project included 2,287 linear feet of pipe bursting, 2,408 linear feet of wastewater line replacement, 480 feet of 18" bore and encasement, 43 point repairs, and rehabilitation of 239 manholes. Public Comment: N/A CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Public Works PROJECT: 2003-2004 Wastewater Collection System Rehabilitation ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: $1,200,298.00 $120,867.30 $51,136.20 $172,003.50 CHANGE DATA PAGE 1 OF 1 DATE:1-6-06 CHANGE ORDER NO: 3 JUSTIFICATION: 1 Final Payment PREPARED BY: ENGINEER tt 1EC.W., CO'4 r; 1/6/2006 DATE CONTRACTOR PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: PREVIOUS CHANGE ORDER: TOTAL % CHANGE: ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $51,136.20 $120,867.30 14.33% $1,372,301.50 rQ-OIo- -IODi constco2/forms6/Ik ITEM # DESCRIPTION OF CHANGES UNIT QTY. UNIT PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING 1 Remove the work to perform complete line replacement for Job No. 1037 per Change Order #2 LS -1 $44,316.30 ($44,316.30) 2 18" SDR pipe by open cut due to alignment of bore pit on the east side of Line Replacement #2005 and additional length of pipe on west side including concrete encasement, gabian baskets, and 22 CY of concrete to stabilize the trench backfill; lowering of Line Replacement #2008 to work with inverts; remibursement for Alexander's yard; and 3 repairs to AC waterline. LF 223.5 $200.00 $44,700.00 45.00 3 Line Replacement #2005, extension of bore to 500 feet LF 20 $550.00 $11,000.00 4 Additional Fencing LF 539 $30.00 $16,170.00 5 Sod, additional square yard for restoration at Surrey and Magnolia SY 900 $10.00 $9,000.00 6 Point Repair prior to Pipe Bursting EA 1 $2,500.00 $2,500.00 7 Additional Footage for Urethane Chimney Seal VF 32.22 $375.00 $12,082.50 TOTAL: $51,136.20 45.00 PREPARED BY: ENGINEER tt 1EC.W., CO'4 r; 1/6/2006 DATE CONTRACTOR PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: PREVIOUS CHANGE ORDER: TOTAL % CHANGE: ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $51,136.20 $120,867.30 14.33% $1,372,301.50 rQ-OIo- -IODi constco2/forms6/Ik