CM-2016-1140 - 6/27/2016rev, 01/16 Department: Project Name: City Project ID Number Vendor Justification Pagel of 3 Contract Quantity Adjustment/Change Order Utilities & Environmeental Services RTU Install & Enhancement Project - Phase 3 Date: 6/8/16 Change Order/Quantity RTUP3 Adjustment No. 1 Trac-n-trol Company Name Address Phone No. kdjust Quantities & add needed equipment. Raise existing radio tower at Bay Hill Lift Station. The existing tower legs have corroded over time ind is not structually sound. Raising the antenna at this site, part of the original contract, is not posible, this site requires a new tower. SUMMARY Amount % Change Original Contract Price: $227,090,001 , Previous Quantity Adjustment(s): This Quantity Adjustment: -$16,985.00 Total Quantity Adjustment(s): -$16,985.00 Total Contract Price with Quantity Adjustment(s): $210,105.00 Previous Change Order(s): 0% This Change Order: $30,325.00 14% Total Change Order(s) To Date: $30,325.00 14% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: $240,430.00 Difference between Original and Adjusted Contract Prices: $13,340.00 Original Contract Time: 270 Time Adjustment by previous Quan. Adj./Change Order: 0 Time Adjustment by this Quan. Adj./Change Order: 91 New Contract Time: 361 Submitted for Approval Prepared By: � T. k� . 4 L F— (P .� Signa a Printed Name, Title, Company Date Approvals Contractor: t;J� �l�WnlI LI -P, C.d.O• ('jtyL-,.l- TRoC /nlG. d.�'W/� Signature Printed Name, Title, Company Date City Project Manager: L ? AA ° na a Printed Name, Title Date Mayor/City U4 / Manager (� i ) I d �e~ Z�C— > G ;� ( �, (U6Uy (" `(,}'- Signature Pririfed Name, Title U Date Contract Quantity Adjustment/ Change Order r Hot]( IUXAS rev, 01/16 Project Name: Quan. Adj./Change Order No.: Chance Order Data Page 2 of 3 Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 1 PRV-9 Tower anti -climb device 1 1 $1,483.00 $1,483.00 2 Lk. Creek PS Chemical Additions L.S. 1 $452.00 $452.00 3 Stone Oak RTU Relocation L.S. 1 $9,750.00 $9,750.00 4 Replace existing Radio Tower at Bay Hill Lift Station L.S. 1 $18,640.00 $18,640.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $30,325.00 Contract Quantity Adjustment/ Change Order rev, 01116 Project Name: RTU Install & Enhancement Project - Phase 3 Quan. Adj./Change Order No. Ouantitv Adiustment Data Page 3 of 3 Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment Westinghouse RTU Installation & 4 Integration L.S. 0.63 $15,970.00 -$9,986.00 9 Cedar Park Interconnect EA. 0.95 $6,760.00 -$6,422.00 11 Bay Hill L.S. Coax Replacement L.F. 51.75 $11.15 -$577.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: -$16,985.00 0 �z i •ti LJoe 0 m -o � w W y Z C CO Z Z D y O m Z n = 3 D n O m z U) Document Path: O:\Workspaces_GIS\+Ufilifies workspace\MAPS\2015\Council\RTU Install EnhancementPh3\RTU Install Enhancements Ph3.mzd N n <D 1.3 C1 ' i CD St 0 0 n o z*`��•• , D O 6c�NNO�� m •� O� • � • '�,•�• m � O N .h 25. N R ,'o �� v �' •� m m �10 o.Lvouu��d, ; ®v z q z < o \ �• > �s�`^' G7 00 g�"N09 ' O • 2 Z(/) co Z t m m int z %'.: �; . c�G MVI .00 �► cJ•Mt/•S -�• .41, .. 0 leo i•� a 0 BLE CREEP` DR ''O ,�••`•. °' ; ��� i ••�•.i c ' i,....•. 4-4 y m .•rin o % t y �� cn m 7C�^ -n ;U N•RED"BUD•LN o� fm in .._.._.� p' m r City of Round Rock ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Trac -N -Trot, Inc. for the TRU Install & Enhancement Project - Phase 3. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 6/24/2016 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: Indexes: Attachments: QA-CONo.1_CM_6.24.16.pdf, LAF_QA-CON o.1 _TracnTrol_TRU I nstal I_C M6.24.16. pdf, MAP_RTUPh3_CM6.24.16.pdf Department: Utilities and Environmental Services Text of Legislative File CM -2016-1140 Consider executing Quantity Adjustment/Change Order No. 1 with Trac-N-Trol, Inc. for the TRU Install & Enhancement Project - Phase 3. The City currently utilizes a number of Remote Terminal Units (RTUs) that are located at every pump station, storage tank, and lift station site in the Utility system. These RTUs allow the City to monitor tank levels, pump run times, etc. Phase 1 of this project replaced an existing obsolete Front End Processor, and provided the City with thirty-four RTUs and radios to replace thirty-four existing RTUs and radios located throughout the water and wastewater systems. Phase 2 physically replaced the RTUs and radios at these 34 locations. Phase 3 will consisted of replacing seven RTUs at the City's more complex pumping sites: Stone Oak Standpipe, Southeast Elevated Storage Tank, Lake Creek Groundwater Wells, Southeast Ground Storage (GS), McNeil GS, and Bowman GS. Westinghouse tank & well site was to be included but is being removed from the project as shown in this Quantity Adjustment. In addition, existing antenna towers were raised at six sites and existing coaxial cable was replaced at three sites. The original contract called to replace the coaxial cable at the Bay Hill Lift Station City of Round Rock Page 1 Printed on 612312016 Agenda Item Summary Continued (CM -2016-1140) antenna. However, the existing tower legs have corroded over time and are not structurally sound enough to climb to replace the coaxial cable. This site requires a new tower. Quantity Adjustment/Change Order (QA/CO) No. 1 for the amount of $13,340 will increase the original contract amount of $227,090 to $240,430. The Utility Staff recommends approval by the City Manager of QA/CO No. 1. Staff Recommends Approval. City of Round Rock Page 2 Printed on 612312016