R-06-04-13-10D1 - 4/13/2006RESOLUTION NO. R -06-04-13-10D1 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Cash Construction Company, Ltd. for the Red Bud Lane (CR 122) Street Improvements Project and the East Water Transmission Line Phase 3-A Project, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 4, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 4 to the Contract with Cash Construction Company, Ltd., a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 13th day of April, 2006. @PFDesktop\:: ODMA/WORLDOX/O:/WDOX/RESOLUTI/R60413D1.WPD/SC ATTEST: CHRISTINE R. MARTINEZ, City Secret 2 LL, or ity of Round Rock, Texas Y CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER FORM PROJECT: CR 122 STREET IMPROVEMENTS PHASE I & II/EAST WATER TRANSMISSION MAIN, PHASE 3-A MANAGING DE DEPARTMENT OF PUBLIC WORKS JOB NO. 0601-2-058-27 In consideration of the Change Order agreed to herein as complete equitable adjustments and full and final payment for the Contractors additional work, the Contractor hereby releases the Owner from any and all liability under this contract for further equitable adjustments, including additional time for performance, attributable to such facts or circumstances giving rise to the proposal for adjustment. PAGE: DATE: 1/27/2006 CHANGE ORDER NO.: 4 ITEM NO. FND AGY ORG (Funding Source) DESCRIPTION UNIT QUANTITY UNIT PRICE ADDED DAYS AMOUNT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Additional RCP to Avoid Conflicts 3x5 Rock at Box Culverts Inigation Sleeves Additional Traffic Signs Hand Grade Ditches Re -Locate FHA at Old Oaks Re -Route FHA at WL sta. 47+00 Re -Route 12" DI Lead Hand-excv. for ARV due to exist. conflicts Hand -excavate for 16" main Storm Sewer Change$0,769.40 @Forest Bluff Additional Driveway Culverts Re -Locate Existing 4" @ 7x5 Box Culverts Landscape Maint. Temporary Pavement Markings 36" RCP (ref #13) Storm Sewer Manhole (ref #13) 2'x2' Area Inlet (ref #13) 18" RCP (ref #13) 36" S.E.T. (ref #13) Sloped Concrete RipRap (ref #4) Re -Locate 2 Existing FHA (ref #10) CMAP 21"x15" (ref #14)$4,356.00 CMAP 21"x15" SET (ref #14) CMAP 28"x20" (ref #14) Additional Mailbox Relocates 3'z2' Box Culvert 6:1 SET LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LF EA EA SY LF EA LF EA EA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 -1,369 -1 -1 -502,300.00) -1 122 2 99 1 38 4 1 $17,331.99 $3,600.27 $3598.49 $527.83 $33,001.38 $3,794.26 $2,214.87 $9,494.64 $3,317.63 $6,635.26 $50,769.40 $1,329.93 527,487.05 $9,873.90 $15,394.02 594.00 53,000.00 $1,$46.00 $46.00 5800.00 800.00 51,800.00 830.00 $630.00 $59.00 5000.00 56,000.00 5.0 2.0 1.0 17.0 2.0 2.0 1.0 1.0 2.0 5.0 5.0 4.0 2.0 2.0 1.0 $17,331.99 $3,600.27 $3,598.49 $527.83 $$3,79 $3,7944.26 .26 $2,214.87 $3,3 $3,3117.63 7.63 $50,769.40 2 $277,487.05 ,487.05 15,397.92 55,397 ($128,686.00) ($3,000.00) ($1 ($(5800.00) ($ 432.00) $43200 $ 830.00 $630.00 $ $2,800.00 5000.00 $6,000.00 /�� SUBTOTAL THIS PAGE _ r Z 'ZS O C* SUBTOTAL OTHER 52.0 $70,846.51 PAGES CONTRACTOR DATE COMBINED TOTAL .1r r $0.00.0 52.0 $7o,aa8.s1 CONSTR4 UCTION INSPECTOR Ai/A. DATE PROJECT ENGINEER DATE DATE DATE THIS CHANGE ORDER 2.31% PREVIOUS CHANGE ORDER(S) 2.16% CHANGE ORDER(S) TO DATE 4.47% EXHIBIT rr A rr $70,848.51 $66,403.83 $137,252.34 ORIGINAL CONTRACT PRICE $3,070,433.00 ORIGINAL CONTRACT PRICE PLUS CHANGE ORDER(S) $3,207,685.34 PI c.'1 X 0 v T 1 C DATE: April 6, 2006, 2006 SUBJECT: City Council Meeting - April 13, 2006 ITEM: 10.D.1. Consider a resolution authorizing the Mayor to execute Change Order No. 4 with Cash Construction Company for the CR 122 Street Improvements Project and the East Water Transmission Line, Phase 3- A Project. Department: Transportation Services Staff Person: Thomas G. Martin, P.E., Director Justification: CR122 Street Improvements Phase I and II / East Water Transmission Main, Phase 3-A; additional work as needed to adjust for utility conflicts with SBC & Manville water lines, to relocate and adjust fire hydrants, additional mailbox relocates, and to add additional storm sewer to avoid utility conflicts. Funding: Cost: $70,848.51 Source of Funds: 4B - RR Transportation Development Corp.& Self Financed Water Construction Outside Resources: Cash Construction Background Information: Red Bud Lane Improvements were designed by Baker Aicklen & Associates Engineering, based on a professional services contract approved by the City Council on January 26, 2006. Public Comment: N/A CITY OF:R:OUND ROCK PROJECT: CR 122 STREET IMPROVEMENTS PHASE I & II/EAST WATER TRANSMISSION MAIN, PHASE 3-A MANAGING DE DEPARTMENT OF PUBLIC WORKS JOB NO. 0601-2-058-27 In consideration of the Change Order agreed to herein as complete equitable adjustments and full and final payment for the Contractors additional worts, the Contractor hereby releases the Owner from any and all liability under this contract for further equitable adjustments, including additional time for performance, attributable to such facts or circumstances giving rise to the proposal for adjustment. ITEM NO. FND AGY ORG (Funding Source) CONSTRUCTION CHANGEOIDER FORM' PAGE: 1 DATE: 1/27/2006 CHANGE ORDER NO.: 4 DESCRIPTION UNIT QUANTITY UNIT PRICE ADDED DAYS AMOUNT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Additional RCP to Avoid Conflicts 3x5 Rock at Box Culverts Irrigation Sleeves Additional Traffic Signs Hand Grade Ditches Re -Locate FHA at Old Oaks Re -Route FHA at WL sta. 47+00 Re -Route 12" DI Lead Hand-excv. for ARV due to exist. conflicts Hand -excavate for 16" main Storm Sewer Change @ Forest Bluff Additional Driveway Culverts Re -Locate Existing 4" @ 7x5 Box Culverts Landscape Maint. Temporary Pavement Markings 36" RCP (ref #13) Storm Sewer Manhole (ref #13) 2'x2' Area Inlet (ref #13) 18" RCP (ref #13) 36" S.E.T. (ref #13) Sloped Concrete RipRap (ref #4) Re -Locate 2 Existing FHA (ref #10) CMAP 21"x15" (ref #14) CMAP 21"x15" SET (ref #14) CMAP 28"x20" (ref #14) Additional Mailbox Relocates 3'x2' Box Culvert 6:1 SET LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LF EA EA SY EA LF EA LF EA EA 1 1 1 1 1 1 1 1 1 1 -1,369 -1 -1 -50 -1 12 2 99 1 38 4 1 $17,331.99 $3,600.27 $3,598.49 $527.83 $33,001.38 $3,794.26 $2,214.87 $9,494.64 $3,317.63 $6,635.26 $50,769.40 $1,329.93 $27,487.05 $9.873.90 $15,397.62 $94.00 $3,000.00 $1,000.00 $46.00 $800.00 $36.00 $1,800.00 $44.00 $830.00 $59.00 $200.00 $6,000.00 5.0 2.0 1.0 17.0 2.0 2.0 1.0 1.0 2.0 5.0 5.0 4.0 2.0 2.0 1.0 $17,331.99 $3,600.27 $3,598.49 $527.83 $33,001.38 $3,794.26 $2,214.87 $9,494.64 $3,317.63 $6,635.26 $50,769.40 $1,329.93 $27,487.05 $9,873.90 $15,397.62 ($128,686.00) ($3,000.00) ($1,000.00) ($2,300.00) ($800.00) $432.00 $3,600.00 $4,356.00 $830.00 $2,242.00 $800.00 $6,000.00 CONTRACTOR PA CONSTRUCTION INSPECTOR m PROJECT ENGINEER SUBTOTAL THIS PAGE z S OCe SUBTOTAL OTHER PAGES COMBINED TOTAL DATE DATE a ��►► ••--� C/J, 4 o AIIMI 4.7 OUr► k R -O DATE R-040-0,4-13- IOC)/ THIS CHANGE ORDER PREVIOUS ANGE ORDER(S) HANGE ORDER(S) TO DATE 4.47% -0 di 43 DATE 2.31 % 2.16% 52.0 $70,848.51 0.0 $0.00 52.0 $70,848.51 $70,848.51 $66,403.83 $137252.34 ORIGINAL CONTRACT PRICE $3,070,433.00 ORIGINAL CONTRACT PRICE PLUS CHANGE ORDER(S) $3,207,685.34