R-06-04-13-10D3 - 4/13/2006RESOLUTION NO. R -06-04-13-10D3 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with RGM Constructors, L.P. for the A.W. Grimes, Phase II Construction Project, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 4, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 4 to the Contract with RGM Constructors, L.P. for the A.W. Grimes, Phase II Construction Project, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 13th day of April, @PFDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/R60413D3.WPD/so , Mayor Ci y of Round Rock, Texas ST: . ki CHRISTINE R. MARTINEZ, City Secre 2 CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Transportation Services PROJECT: A. W. Grimes Boulevard Phase 11 ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: $4,978,357.76 $107,653.00 $256,421.00 $364,074.00 Page DATE: 1 of 2 3/29/2006 CHANGE ORDER NO: 4 JUSTIFICATION: Reference page 2 of 2 SIG —URE (ENGI o.A. . rte ( SIGNATUIRE (CONTRACTOR) PRINTED NAME: Martin Morello TITLE: Project Manager E 3/29/2006 DATE APPROVED: CITY OF ROUND ROCK DATE PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: PREVIOUS CHANGE ORDER: TOTAL % CHANGE TO DATE: ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $5,342,431.76 $256,421.00 $107,653.00 7.31% constco2/forms6/Ik EXHIBIT IAII ITEM # DESCRIPTION OF CHANGES UNIT QTY UNIT PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING 1 PRECAST BOX CULVERT, 6X4 LF 280 $304.00 $85,120.00 6 2 PRECAST B.C., 6X4, 2 BENDS LF 32 $304.00 $9,728.00 2 3 WINGWALL, (FW-30)(HW-5FT) EA 1 $6,000.00 $6,000.00 6 4 HAUL OFF SPOILS LCY 722 $7.00 $5,054.00 0 5 WWL, 6 -INCH, MH#1 TO MH#6 LF 781 $90.00 $70,290.00 18 6 WWL, 8 -INCH, MH#1 TO EXIST. MH LF 195 $120.00 $23,400.00 7 7 SANITARY SEWER MANHOLES EA 5 $5,100.00 $25,500.00 10 8 DEMO GRATE INLET, STA 521+00 EA 1 $930.00 $930.00 0 9 CURB INLET, 10FT, STA 521+00 EA 1 $2,500.00 $2,500.00 1 10 RELOCATE WATER SERVICE AT EA 1 $1,200.00 $1,200.00 0 STATION 566+25 0 $0.00 $0.00 11 SILT FENCE REMOVAL LF 17093 $1.00 $17,093.00 0 12 ILLUMINATION POLE BRACKET EA 1 $2,856.00 $2,856.00 0 13 WATERLINE, 16 -INCH LF 110 $50.00 $5,500.00 3 14 D.I. FITTINGS TONS 0.5 $2,500.00 $1,250.00 0 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 QncoAccnBY i TOTAL: $256,421.00 53 SIG —URE (ENGI o.A. . rte ( SIGNATUIRE (CONTRACTOR) PRINTED NAME: Martin Morello TITLE: Project Manager E 3/29/2006 DATE APPROVED: CITY OF ROUND ROCK DATE PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: PREVIOUS CHANGE ORDER: TOTAL % CHANGE TO DATE: ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $5,342,431.76 $256,421.00 $107,653.00 7.31% constco2/forms6/Ik EXHIBIT IAII CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER Page 2 of 2 DEPARTMENT: Transportation Services DATE: 3/29/2006 PROJECT: A. W. Grimes Boulevard Phase II CHANGE ORDER NO: 4 JUSTIFICATION: 1 PROVIDE INSTALLATION OF BOX CULVERT, 6X4, DURING CONSTRUCTION OF THE A.W. GRIMES PROJECT IN LIEU OF THE US 79 PROJECT AFTER ROADWAY CONSTRUCTION. 2 REROUTE EXISTING WASTEWATER LINE CONFLICTING WITH THE ROADWAY AND PEDESTRIAN TUNNEL. 3 DEMOLITION OF EXISTING GRATE INLET LOCATED IN CURB AND GUTTER OF THE PROPOSED ROADWAY. 4 RELOCATE EXISTING WATER SERVICE LOCATED IN THE PROPOSED SIDEWALK. 5 PROVIDE ADDITIONAL SILT FENCE. 6 REMOVE AND RELOCATED THE EXISTING 16 -INCH WATER LINE SOUTH OF THE BRIDGE BETWEEN THE BACK OF THE CURB AND THE SEGMENTAL BLOCK WALL. 7 PROVIDE ILLUMINATION POLE BRACKET AT THE BRIDGE RAIL PILASTER PER RTG DRAWING SHEET 111B DATED FEBRUARY 22, 2006. DATE: April 6, 2006, 2006 SUBJECT: City Council Meeting - April 13, 2006 ITEM: 10.D.3. Consider a resolution authorizing the Mayor to execute Change Order No. 4 with RGM Constructors, L.P. for the construction of A.W Grimes Boulevard Phase II from Lake Creek to US 79. Department: Transportation Services Staff Person: Thomas G. Martin, P. E., Director of Transportation Services Justification: This change order is to provide installation of 6'x4' Box Culvert, during construction of the A.W. Grimes Project to facilitate the proposed drainage for the US 79 project. Reroute and replace existing wastewater line conflicting with roadway and pedestrian tunnel. Demolition of existing grate inlet located in curb and gutter of the proposed roadway. Relocate existing water service located in proposed sidewalk. Provide additional silt fence. Remove and relocated the existing 16 -inch waterline south of the bridge between the back of the curb and the segmental block wall. Provide illumination pole bracket at the bridge rail pilaster per RTG drawing sheet 111B dated February 22, 2006. Funding: Cost: Source of Funds: $256,421.00 4B -Transportation Development Corporation Outside Resources: RGM Constructors Background Information: The A.W. Grimes Boulevard Phase II project was awarded to RGM Constructors, L.P., by council action on July 14, 2005 in the amount of $ 4, 978,357.76. This project is the second Phase of the A. W. Grimes improvements. Phase I constructed a six -lane section from SH 45 to Lake Creek. As part of the second phase, UPRR will reconstruct their bridge over Brushy Creek to accommodate the City's underpass on the Railroad. When complete, A.W. Grimes Boulevard will provide a new arterial roadway from Lake Creek to US 79 and complete the Arterial Roadway from SH 45 to US 79. Public Comment: N/A CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER Page 1 of 2 DEPARTMENT: Transportation Services DATE: 3/29/2006 PROJECT: A. W. Grimes Boulevard Phase 1I CHANGE ORDER NO: 4 JUSTIFICATION: Reference page 2 of 2 ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: $4,978,357.76 $107,653.00 $256,421.00 $364,074.00 CHANGE DATA ITEM # DESCRIPTION OF CHANGES UNIT QTY. UNIT PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING 1 PRECAST BOX CULVERT, 6X4 LF 280 $304.00 $85,120.00 6 2 PRECAST B.C., 6X4, 2 BENDS LF 32 $304.00 $9,728.00 2 3 WINGWALL, (FW-30)(HW-5FT) EA 1 $6,000.00 $6,000.00 6 4 HAUL OFF SPOILS LCY 722 $7.00 $5,054.00 0 5 WWL, 6 -INCH, MH#1 TO MH#6 LF 781 $90.00 $70,290.00 18 6 WWL, 8 -INCH, MH#1 TO EXIST. MH LF 195 $120.00 $23,400.00 7 7 SANITARY SEWER MANHOLES EA 5 $5,100.00 $25,500.00 10 8 DEMO GRATE INLET, STA 521+00 EA 1 $930.00 $930.00 0 9 CURB INLET, 10FT, STA 521+00 EA 1 $2,500.00 $2,500.00 1 10 RELOCATE WATER SERVICE AT EA 1 $1,200.00 $1,200.00 0 STATION 566+25 0 $0.00 $0.00 11 SILT FENCE REMOVAL LF 17093 $1.00 $17,093.00 0 12 ILLUMINATION POLE BRACKET EA 1 $2,856.00 $2,856.00 0 13 WATERLINE, 16 -INCH LF 110 $50.00 $5,500.00 3 14 D.I. FITTINGS TONS 0.5 $2,500.00 $1,250.00 0 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 TOTAL: $256,421.00 53 SIGNATURE (CONTRACTOR) PRINTED NAME: Martin Morello DATE 3/29/2006 TITLE: Project Manager APPROVED: CITY OF RO fe-o(0-o'4-I3-/0D3 y—l3-o (, DATE PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: $256,421.00 PREVIOUS CHANGE ORDER: $107,653.00 TOTAL1,0 CHANGE TO DATE: 7.31% ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $5,342,431.76 constco2/forms6/Ik CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER Page 2 of 2 DEPARTMENT: Transportation Services DATE: 3/29/2006 PROJECT: A. W. Grimes Boulevard Phase II CHANGE ORDER NO: 4 JUSTIFICATION: 1 PROVIDE INSTALLATION OF BOX CULVERT, 6X4, DURING CONSTRUCTION OF THE A.W. GRIMES PROJECT IN LIEU OF THE US 79 PROJECT AFTER ROADWAY CONSTRUCTION. 2 REROUTE EXISTING WASTEWATER LINE CONFLICTING WITH THE ROADWAY AND PEDESTRIAN TUNNEL. 3 DEMOLITION OF EXISTING GRATE INLET LOCATED IN CURB AND GUTTER OF THE PROPOSED ROADWAY. 4 RELOCATE EXISTING WATER SERVICE LOCATED IN THE PROPOSED SIDEWALK. 5 PROVIDE ADDITIONAL SILT FENCE. 6 REMOVE AND RELOCATED THE EXISTING 16 -INCH WATER LINE SOUTH OF THE BRIDGE BETWEEN THE BACK OF THE CURB AND THE SEGMENTAL BLOCK WALL. 7 PROVIDE ILLUMINATION POLE BRACKET AT THE BRIDGE RAIL PILASTER PER RTG DRAWING SHEET 111B DATED FEBRUARY 22, 2006.