Loading...
R-06-05-25-11D1 - 5/25/2006RESOLUTION NO. R -06-05-25-11D1 WHEREAS, the City of Round Rock has duly advertised for bids for the Red Bud Lane Sidewalk Improvements Project (CR 122 Phase 3B), and WHEREAS, while only one bid was received from H. Deck Construction Company, the City Council has determined that the bid is acceptable, and WHEREAS, the City Council wishes to accept the bid of H. Deck Construction Company, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with H. Deck Construction Company for the Red Bud Lane Sidewalk Improvements Project (CR 122 Phase 3B). The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 25th day of May, 2006. ATTES Mayo Ci y of Round Rock, Texas CHRISTINE R. MARTINEZ, City Secretar @PFDesktop\::0DMA/WORLDOX/0:/WDOX/RESOLUTI/R60525D1.WPD/sc BAKER-AICKLEN & ASSOCIATES, INC. Engineers/Surveyors May 10, 2006 Mr. William Dobrowolski City of Round Rock 2008 Enterprise Drive Round Rock, TX 78664 RE: Notice of Recommendation for Red Bud Lane Sidewalk Improvements (CR 122 Phase 3B) Dear Mr Dobrowolski: As you are aware, bids were opened at 2:00 p.m., Tuesday, May 9th, 2006, for the above referenced project. A total of one (1) bid was received, with the lowest base bid submitted being from H. Deck Construction of Round Rock, TX in the amount of $683,399.80. A complete bid tabulation has been forwarded to your office for your review. Based upon Baker-Aicklen's personal knowledge of the contractor, the contractor's past performance within this region, and their submission of the lowest base bid, we recommend award of this contract to H. Deck Construction. If you have any questions or comments, please feel free to call at your convenience. Sincerely, f�I H. D. Roy , P. HDR/vmb Enc. cc: H. Deck Construction File o:10601-2-101Utecommendation Ur 5-10-06.doc 507 W. Liberty Ave. • Round Rock, Texas 78664 • 512.244.9620 • Fax 512.244.9623 H. Deck Construction Round Reck, TX WM b CO Addendums N/A U r $ a 8 8 af9 8 $ = n 8 v 8 va 8 _ 8 0 e 8 8 o i 8 8 8 wv 5 $ o S oo UN 8 m ,-,, $ y� Vl $$ S o a 8 r' Nj 8 8 n 8 �i j7 Cqp a 1 LS `.'ii .-.� 00 - 00 a . 563 LF 5,323 LF O, el N N � 4 b N k O O E .-i 0 N I' e U V !Mobilization, complete in place Unclassified street excavation, including demolition, subgrade preparation, embankment and grading within the limits of Construction, (Plan Quantity ), complete in place Non-native seeding for erosion control method, Bermuda Hydreseed (CYNODON DACTYLON), complete in place a 9 Ti 1f co Tree protection, complete in place - ,� a .El 0 A - � 0 v P.C. concrete 5' wide sidewalk, (3,000 psi, standard steel reinforcer), complete in place P.C. concrete accessible ramp, (3,000 psi, standard steel reinforced), complete in place a 0 1 3 m C A u ! q 1'�a ig Pi u r 1 .. 1 12" CMP storm sewer, including all appurtenances, complete in place 13 18" RCP storm sewer, including all appurtenances, complete in place W 9 . pi N M et .f so N 00 D+ 0 '" N ... o:10601-2-101 0 cA IL Deck Construction Round Rock, TX Bid Bond? Yes 7 2 f2 i§ ƒ f E - _ # - # k ■ 8# ■ 0 3 § 7 ■ " 8 0 " " $ frs 7 _ ALTERNATIVE BID a - q 2 S1,200.00 S19,200.00 E R ƒ - 23 SY § m j r e b \ * m . , § ■ 2' x 2' area inlet, including all appurtenances, complete in place $ / . 7 'it_$ Dry riprap, rock d50 =12" dia, complete in place 2 2 Q Thermoplastic pavement marking, 12" wide, white solid, complete in place & a 2 u Adjust water valve box to finish grade, including all appurtenances, complete in place 1� 2[ Et $ . §I §§ TOTAL BASE BID (Items 1 thra 21) P.C. concrete 5' wide sidewalk slip -formed or edge - formed (4,000 psi - fiber reinforced), complete in place P.C. concrete accessible ramp, (4,000 psi - fiber reinforced), complete in place TOTAL ALTERNATIVE BID 1 Items 1-7, 8A, 9A,10-21 _ - k o;\0601-2-101 I 40 'y 1,ra ! E Nal 140 • a1WIIt %11NI,I 11111111 1 L,>,,ti11 1-% • 11611111 Wilibbilla I I .11111°111111M°. J1-11�� it 41,1401110111111 sswlLi�i llin IMOSUM ■ Ir» III ■Ik.fll-'u' iiiiiiuIIuuii2:V" *UMWW. ■s Mt10.11-i�1.� ISM nima Unit MI .. 1iuIm�ag 4,04•*4:4:4 t pit t �� 111111111111111M4116‘ ,,�F. �.; � �1 IMINIMOM 111111j1 1irt ir�t■►�3. 0141111111111111111111111 twin gib. *4 44 1.4.01 rSi.,. IlliblbiLti Lig !ILL. Oh Own im N K. 0 10. ma Miradithoging.hiAtat.• -ER' r-1► N. 1p; - ¶f!11 w� r► 41 � '1• �� ak = �SLs1' 11-4 �0nom It. �.,F��` �*liege ! gm gpm !11 ■044.401110 41%411 VI siti le, IP MOM ra 41'41 d"" VV. ! • --` ,111 �. } �* .-;;,,,,,11,1, �►• tillita!la■ go.; sr sr II PP 1%111111111W 111111111'�� $111111L1R '�LUIIIIII 10‘„ t{PI1uIIII��Si it* OPP 004 • -ft Sx11 7.= hirtit '•ice :;•IN 111111 Hun �1I,I1I1I111111111I1N 1111111111$111111101 it 1 It,I 11111iIII 'f1L,NI1F11111111111111 Mwl .as Ltitiow y*#f �� �#�� ittogit. gm +r+ #J►.11-111 J_1# +iii, 5a �r r'ldor 9� hail tf�1�1.�� pp f IA am -� ad pp trg ,art - r� ur .I� i 1 �� *IIIt�11 �1i II uR.__ ma,i PIItt���� {111.' r M f}t r1r � * a1s1 � 111 4111111/191111111411111111MMNE, gist, r111I tinlissiar Mjf�1111111 ':t} 0111L{141r El a — ; ,r m I I 1 1 I M N )a V zo 2 W re p a� O H a a M CD0 CO 0 J V) P mQ wa DATE: May 18, 2006 SUBJECT: City Council Meeting - May 25, 2006 ITEM: 11.D.1. Consider a resolution authorizing the Mayor to execute a contract with H. Deck Construction for the Red Bud Lane Sidewalk Improvements (CR 122 Phase 3B) Project. Department: Engineering and Developmental Services Staff Person: Daniel L. Halden, P.E., City Engineer Justification: To provide for pedestrian traffic along Red Bud Lane, this action will bring this 2001 GO Bond (2nd Issuance) project into the construction phase. The Project is scheduled for completion by August 31, 2006. Funding: Cost: Source of funds: $683,399.80 2001 GO Bonds (2nd Issuance) Outside Resources: Baker-Aicklen & Associates, Inc., Background Information: This project consists of the construction of approximately 8,750 linear feet of 5 -foot wide concrete sidewalk with associated improvements including unclassified excavation/embankment, segmental retaining walls, drainage improvements, grading, pavement markings and establishment of vegetation on disturbed areas. The project will be constructed, along the west side of Red Bud Lane from Gattis School Road to Forest Creek Boulevard and along the east side of Red Bud Lane from Forest Creek Boulevard to County Road 123. One contractor submitted a bid for the project that was opened and read on May 9, 2006. Our consultant, Baker-Aicklen & Associates, Inc., has researched references, evaluated the bid and recommends that the contract be awarded to H. Deck Construction Company. The proposed contract amount of $683,399.80 is within current available construction budget and engineering construction cost estimate for the project. Public Comment: This project was presented to the Bond Overview Committee by HOAs, and neighborhood residents in the vicinity of the Project.