R-06-05-25-11E3 - 5/25/2006RESOLUTION NO. R -06-05-25-11E3 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with RGM Constructors, L.P. for the A.W. Grimes, Phase II Construction Project, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 5, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 5 to the Contract with RGM Constructors, L.P. for the A.W. Grimes, Phase II Construction Project, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 25th day of May, 2006. @PFDesktop\::ODMA/WORLDOX/O:/wdox/RESOLUTI/R60525E3.WPD/so NY ayor City of Round Rock, Texas AT T: , K. CHRISTINE R. MARTINEZ, City Secre ary 2 CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Transportation Services PROJECT: A. W. Grimes Boulevard Phase II ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: $4,978,357.76 $364,074.00 $48,611.00 $412,685.00 CHANGE DATA Page DATE: 1 of 2 4/27/2006 CHANGE ORDER NO: 5 JUSTIFICATION: Reference page 2 of 2 ITEM # DESCRIPTION OF CHANGES UNIT QTY. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PARE EXTEND PIPE, 2-2 INCH SCH 40 EXTEND PIPE, 4-4 INCH SCH 40 EXTEND PIPE, 1-8 INCH EXTEND PIPE, 12 -INCH CASING PIPE EXTEND PIPE, 12 -INCH LOWER EXISTING SLEEVE CROSSING ITEMS 1 THRU 5 & 8 -INCH CASING PIPE W/ 4 -INCH LIVE GAS LINE IN ROCK TRENCH PROTECTION, 16" WL, CO#2 TRENCH PROTECTION, 16" WL, CO#3 TRENCH PROTECTION, BC6X4, CO#4 TRENCH PROTECTION, WWL, CO#4 TRENCH PROTECTION, 16" WL, CO#4 STRUCTURAL EXCAVATION, BC 6X4 CHANNEL EXCAVATION FOR BC 6X4 ROADWAY EXCAVATION, STA 507+00 FLEXIBLE BASE, STA 507+00 CONC. VALLEY GUTTER, STA 507+00 CURB RAMP & LANDING, STA 507+00 PREP ROW, TREE REMOVAL IN CHANNEL FOR BC 6X4 SIGNATURE (ENGI „ n SIGNATIYRE (CONTRACTOR) PRINTED NAME: Martin Morello LF LF LF LF LF LF LF LF LF LF LF CY CY CY CY LF EA STA 27-o DATE DATE TITLE: Project Manager 120 240 60 60 60 30 0 0 0 220 130 332 1000 130 400 75 666 180 90 2 0.5 0 0 UNIT PRICE $8.00 $16.00 $58.00 $66.00 $66.00 $160.00 $0.00 $0.00 $0.00 $3.00 $3.00 $3.00 $3.00 $3.00 $9.00 $10.00 $5.00 $21.00 $80.00 $850.00 $3,630.00 $0.00 $0.00 TOTAL: ._ . AMOUNT ADDED DAYS CALENDAR/ WORKING $960.00 $3,840.00 1 $3,480.00 1 $3,960.00 1 $3,960.00 1 $4,800.00 4 $0.00 $0.00 $0.00 $660.00 0 $390.00 0 $996.00 0 $3,000.00 0 $390.00 0 $3,600.00 1 $750.00 1 $3,330.00 2 $3,780.00 1 $7,200.00 1 $1,700.00 1 $1,815.00 1 $0.00 $0.00 $48,611.00 16 PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: 4/27/2006 PREVIOUS CHANGE ORDER: TOTAL % CHANGE TO DATE: ORIGINAL CONTRACT PRICE PLUS APPROVED: CITY OF ROUND ROCK DATE CHANGE ORDERS: $48,611.00 $364,074.00 8.29% $5,391,042.76 CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER Page 2 of 2 DEPARTMENT: Transportation Services DATE: 4/27/2006 PROJECT: A. W. Grimes Boulevard Phase 11 CHANGE ORDER NO: 5 JUSTIFICATION: 1 EXTEND AND LOWER EXISTING SLEEVE CROSSINGS AT STATION 517+90 ON THE SOUTH BOUND LANE , WEST SIDE. 2 ADD TRENCH PROTECTION, 16 -INCH WATERLINE CHANGE ORDER #2, 220LF 3 ADD TRENCH PROTECTION, 16 -INCH WATERLINE CHANGE ORDER #3, 130LF 4 ADD TRENCH PROTECTION, BOX CULVERT 6X4, CHANGE ORDER #4, 332LF 5 ADD TRENCH PROTECTION, WASTEWATER LINE CHANGE ORDER #4, 1000LF 6 ADD TRENCH PROTECTION, 16 -INCH WATERLINE CHANGE ORDER $4, 130LF 7 ADD STRUCTURAL EXCAVATION, BOX CULVERT 6X4 AND HEADWALL CHANGE ORDER #4 8 PREP R.O.W, TREE REMOVAL IN CHANNEL WIDENING FOR BOX CULVERT 6X4 9 CHANNEL EXCAVATION, WIDENING FOR BOX CULVERT 6X4 10 ROADWAY EXCAVATION, STATION 507+00 CROSS STREET ADDITION EAST SIDE 11 FLEXIBLE BASE, STATION 507+00 CROSS STREET ADDITION EAST SIDE 12 CONCRETE VALLEY GUTTER, STATION 507+00 CROSS STREET ADDITION EAST SIDE 13 CURB RAMP & LANDING, STATION 507+00 CROSS STREET ADDITION EAST SIDE A.W. Grimes Phase II OCK From U.S. 79 to Lake Creek DATE: May 18, 2006 SUBJECT: City Council Meeting - May 25, 2006 ITEM: * 11.E.3. Consider a resolution authorizing the Mayor to execute Change Order No. 5 with RGM Constructors, L.P. for the construction of A.W Grimes Boulevard Phase II from Lake Creek to US 79. Department: Transportation Services Staff Person: Thomas G. Martin, P. E., Director of Transportation Services Justification: This change order is to provide for the channel and structural excavation to accommodate newly installed 6' x 4' boxes, trench protection for the relocation of the 16" waterline and to provide for lowering the existing duct bank of utilities beyond the footing of the proposed retaining wall. Funding: Cost: Source of Funds: 4B -RR Transportation Development Corporation $48,611.00 Description Dollar Amount % Change Original Contract Amount: $4,978,357.76 Previous Change Order #4 & Amount: $364,074.00 7.3% Revised Contract Amount: $5,342,431.76 This Change Order: $48,611.00 0.98% New Contract Amount: $5,391,042.76 8.28% Outside Resources: RGM Constructors, L.P. Background Information: The A.W. Grimes Boulevard Phase II project was awarded to RGM Constructors, L.P., by Council on July 14, 2005 in the amount of $4,978,357.76. This project is the second phase of the A.W. Grimes Improvements. Phase I constructed a six -lane section from SH 45 to Lake Creek. As part of the second phase, UPRR will reconstruct their bridge over Brushy Creek to accommodate the City's underpass on the Railroad. When complete, A.W. Grimes Boulevard will provide a new arterial roadway from Lake Creek to US 79 and complete the Arterial Roadway from SH 45 to US 79. Public Comment: N/A EXECUTED DOCUMENT FOLLOWS CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Transportation Services PROJECT: A. W. Grimes Boulevard Phase II ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: ITEM # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 DESCRIPTION OF CHANGES EXTEND PIPE, 2-2 INCH SCH 40 EXTEND PIPE, 4-4 INCH SCH 40 EXTEND PIPE, 1-8 INCH EXTEND PIPE, 12 -INCH CASING PIPE EXTEND PIPE, 12 -INCH LOWER EXISTING SLEEVE CROSSING ITEMS 1 THRU 5 & 8 -INCH CASING PIPE W/ 4 -INCH LIVE GAS LINE IN ROCK TRENCH PROTECTION, 16" WL, CO#2 TRENCH PROTECTION, 16" WL, CO#3 TRENCH PROTECTION, BC6X4, CO#4 TRENCH PROTECTION, WWL, CO#4 TRENCH PROTECTION, 16" WL, CO#4 STRUCTURAL EXCAVATION, BC 6X4 CHANNEL EXCAVATION FOR BC 6X4 ROADWAY EXCAVATION, STA 507+00 FLEXIBLE BASE, STA 507+00 CONC. VALLEY GUTTER, STA 507+00 CURB RAMP & LANDING, STA 507+00 PREP ROW, TREE REMOVAL IN CHANNEL FOR BC 6X4 $4,978,357.76 $364,074.00 $48,611.00 $412,685.00 CHANGE DATA UNIT LF LF LF LF LF LF LF LF LF LF LF CY CY CY CY LF EA STA QTY. 120 240 60 60 60 30 0 0 0 220 130 332 1000 130 400 75 666 180 90 2 0.5 0 0 Page DATE: 1 of 2 4/27/2006 CHANGE ORDER NO: 5 JUSTIFICATION: Reference page 2 of 2 UNIT PRICE $8.00 $16.00 $58.00 $66.00 $66.00 $160.00 $0.00 $0.00 $0.00 $3.00 $3.00 $3.00 $3.00 $3.00 $9.00 $10.00 $5.00 $21.00 $80.00 $850.00 $3,630.00 $0.00 $0.00 AMOUNT $960.00 $3,840.00 $3,480.00 $3,960.00 $3,960.00 $4,800.00 $0.00 $0.00 $0.00 $660.00 $390.00 $996.00 $3,000.00 $390.00 $3,600.00 $750.00 $3,330.00 $3,780.00 $7,200.00 $1,700.00 $1,815.00 $0.00 $0.00 ADDED DAYS CALENDAR/ WORKING 1 1 1 1 4 0 0 0 0 0 1 1 2 1 1 1 1 PARE SIG ATURE (ENGIPit /. SIGNAT ► RE (CONTRACTOR) PRINTED NAME: Martin Morello TITLE: Project Manager APPROVE C1TY D ' O 1y LOGu., mA yo R. 27-0A DATE DATE TOTAL: $48,611.00 16 PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: 4/27/2006 PREVIOUS CHANGE ORDER: TOTAL % CHANGE TO DATE: ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: 5-25-0Cv DATE $48,611.00 $364,074.00 8.29% $5,391,042.76 constco2/forms6/Ik R-04-05'2.6-1/63 CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER Page 2 of 2 DEPARTMENT: Transportation Services DATE: 4/27/2006 PROJECT: A. W. Grimes Boulevard Phase II CHANGE ORDER NO: 5 JUSTIFICATION: 1 EXTEND AND LOWER EXISTING SLEEVE CROSSINGS AT STATION 517+90 ON THE SOUTH BOUND LANE , WEST SIDE. 2 ADD TRENCH PROTECTION, 16 -INCH WATERLINE CHANGE ORDER #2, 220LF 3 ADD TRENCH PROTECTION, 16 -INCH WATERLINE CHANGE ORDER #3, 130LF 4 ADD TRENCH PROTECTION, BOX CULVERT 6X4, CHANGE ORDER #4, 332LF 5 ADD TRENCH PROTECTION, WASTEWATER LINE CHANGE ORDER #4, 1000LF 6 ADD TRENCH PROTECTION, 16 -INCH WATERLINE CHANGE ORDER $4, 130LF 7 ADD STRUCTURAL EXCAVATION, BOX CULVERT 6X4 AND HEADWALL CHANGE ORDER #4 8 PREP R.O.W, TREE REMOVAL IN CHANNEL WIDENING FOR BOX CULVERT 6X4 9 CHANNEL EXCAVATION, WIDENING FOR BOX CULVERT 6X4 10 ROADWAY EXCAVATION, STATION 507+00 CROSS STREET ADDITION EAST SIDE 11 FLEXIBLE BASE, STATION 507+00 CROSS STREET ADDITION EAST SIDE 12 CONCRETE VALLEY GUTTER, STATION 507+00 CROSS STREET ADDITION EAST SIDE 13 CURB RAMP & LANDING, STATION 507+00 CROSS STREET ADDITION EAST SIDE T-1-7 A.W. Grimes Phase if ROUND ROCK TEXAS From U .S. 79 to Lake Creek