R-06-06-22-10A2 - 6/22/2006RESOLUTION NO. R -06-06-22-10A2
WHEREAS, the City of Round Rock ("City") and the Union Pacific
Railroad Company ("UPRR") entered into a Public Road Crossing Agreement
on February 9, 2006, and
WHEREAS, UPRR has requested that a Supplemental Agreement be
approved increasing the cost of the City's participation to
$2,599,337.00, and
WHEREAS, the City Council wishes to approve the Supplemental
Agreement, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City., subject to the City Manager's and City Attorney's
approval of the final language and terms, a Supplemental Agreement with
Union Pacific Railroad Company, a draft copy of same being attached
hereto as Exhibit "A" and incorporated herein for all purposes.
The City Council hereby finds and declares that written notice of
the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and
the subject matter hereof were discussed, considered and formally acted
upon, all as required by the Open Meetings Act, Chapter 551, Texas
Government Code, as amended.
RESOLVED this 22nd day of June, 200
T ST:
ALAM f eleAUX LE MAXWELL, Mayor PRO -Ism
City of Round Rock, Texas
CHRISTINE R. MARTINEZ, City Secre
@PFDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/R60622A2.2WP/sc
DRAFT
ONION
PACIFIC
BUILDING AMERICA
UPRR Folder No. 2356-83
UPRR Audit No. 239608
SUPPLEMENTAL AGREEMENT
THIS SUPPLEMENTAL AGREEMENT is made as of the day of
, 200, by and between UNION PACIFIC RAILROAD COMPANY, a
Delaware corporation, or its predecessor in interest, (hereinafter the Licensor) and the CITY OF
ROUND ROCK, a Texas municipal corporation with a mailing address at 221 East Main Street,
Round Rock, TX 78664 (hereinafter the Licensee).
RECITALS:
By instrument dated February 9, 2006, the parties hereto or their predecessors in interest (if
any), entered into an agreement (herein the "Basic Agreement") identified as Railroad's Audit No.
239608, covering:
• the construction of a new roadway bridge and new roadway for A.W. Grimes Boulevard
under an existing railroad bridge structure. The new roadway and roadway bridge will
traverse the Railroad's property and cross Brushy Creek at Railroad Milepost 159.90 on
Railroad's Austin subdivision at DOT No. 924 253L at or near Round Rock, Williamson
County, Texas (the "Crossing Area") as the Crossing Area is generally shown on the location
print marked Exhibit A attached hereto and hereby made a part hereof. The portion of the
Political Body's roadway and roadway bridge located within the Crossing Area is hereinafter
collectively the "Roadway".
and the:
• the reconstruction of an existing Railroad structure consisting of an open deck superstructure
replaced with a closed deck superstructure and the rehabilitation of the Railroad bridge
substructure (two abutments and 5 piers) and incidental track work to facilitate the
rehabilitated structure. The structure that will carry the Railroad's locomotives and rail cars
over Brushy Creek at A.W. Grimes Boulevard, DOT Number 924 253L, at Railroad Mile
Post 159.90 on its Austin Subdivision at or near Round Rock, Williamson County, Texas, is
hereinafter referred to as the "Structure".
The parties now desire to modify the Basic Agreement by amending Article 4 in the Basic
Agreement.
AGREEMENT:
NOW, THEREFORE, IT IS AGREED by and between the parties hereto as follows:
Supplemental Agreement
Form Approved, AVP -Law 05/01/06
EXHIBIT "A"
Page 1 of 3 May 19, 2006
UNION
PACIFIC
BUILDING AMERICA-
SECTION
MERICA
SECTION 1 - AMENDMENT OF PARAGRAPH D OF ARTICLE 4 OF THE BASIC
AGREEMENT
Effective as of the date herein written, Paragraph 4 of the Basic Agreement, shall be, and
hereby is amended to read as follows:
ARTICLE 4- POLITICAL BODY'S PAYMENT TO RAILROAD.
A. The existing Structure, which is an open deck design, will not allow enough vertical
clearance to accommodate the Political Body's Roadway and the Project. In order to provide enough
clearance for the Political Body's Roadway, the Railroad will be redesigning and reconstructing the
Structure to make it a closed deck bridge and the Political Body agrees to pay the Railroad, as
provided in Paragraph B below, the costs associated with replacing two spans of the redesigned and
reconstructed Structure.
B. With respect to Paragraph A above, the Political Body agrees to pay to the Railroad a firm,
fixed amount of Two Million Five Hundred Ninety -Nine Thousand Three Hundred Thirty -Seven
Dollars ($2,599,337.00.00) in the following installment payments:
• $569,076.00 within thirty (30) days after the execution of this Agreement, of which payment
has already been received by the Railroad from the Political Body,
• $1,015,130.50 within thirty days after the Railroad notifies the Political Body that
reconstruction of the Structure is fifty percent (50%) complete, and
• $1,015,130.50 within thirty (30) days after the Railroad notifies the Political Body that
reconstruction of the Structure has been completed.
C. The Railroad agrees that all costs exceeding $2,599,337.00. involving the reconstruction of
the Structure shall be borne by the Railroad.
SECTION 2 - EFFECTIVE DATE
This Supplemental Agreement shall be effective as of the date herein written.
SECTION 3- AGREEMENT SUPPLEMENTAL
This agreement is supplemental to the Basic Agreement, as herein amended, and nothing
herein contained shall be construed as amending or modifying the same except as herein specifically
provided.
Supplemental Agreement
Form Approved, AVP -Law 05/01/06
Page 2 of 3 May 19, 2006
UH*O
PACIFIC
BUILDING AMERICA
IN WITNESS WHEREOF, the parties hereto have caused this Supplemental Agreement to
be executed as of the day and year first hereinabove written.
UNION PACIFIC RAILROAD COMPANY
(Federal Tax ID #94-6001323)
By:
TONY K. LOVE
AVP -Real Estate
WITNESS: CITY OF ROUND ROCK
Supplemental Agreement
Form Approved, AVP -Law 05/01/06
X
Title:
Page 3 of 3 May 19, 2006
EXECUTED
DOCUMENT
FOLLOWS
UNION
PACIFIC
June 30, 2006
MR STEPHAN L SHEETS
ATTORNEY AT LAW
309 E MAIN ST
ROUND ROCK TX 78664-5246
Dear Mr. Sheets:
UPRR Folder No. 2356-83
Attached is the City of Round Rock's original copy of a Supplemental Agreement, fully executed
on behalf of the Railroad Company.
In order to protect the Railroad Company's property as well as for safety reasons, it is imperative
that you notify the Railroad Company's Manager of Track Maintenance and the Communications
Department:
Joe Garcia
Manager Industry & Public Projects
Union Pacific Railroad Company
1711 Quintana Road
San Antonio, TX 78224-0730
Phone: 210-921-6701
FAX: 210-921-4082
Fiber Optics Hot Line
1-800-336-9193
If you have any questions, please contact me.
LL
Se ' : 1 nager ' ontracts
phone: (41 544-8620
e-mail: pgfarrell@up.com
Real Estate
UNION PACIFIC RAILROAD
1400 Douglas Street, Stop 1690
Omaha, Nebraska 68179-1690
fx. (402) 501-0340
BUILDING AMERICA"
UPRR Folder No. 2356-83
UPRR Audit No. 239608
SUPPLEMENTAL AGREEMENT
THIS SUPPLEMENTAL AGREEMENT is made as of the AA day of
, 200 (p , by and between UNION PACIFIC RAILROAD COMPANY, a
Delaware corporation, or its predecessor in interest, (hereinafter the Licensor) and the CITY OF
ROUND ROCK, a Texas municipal corporation with a mailing address at 221 East Main Street,
Round Rock, TX 78664 (hereinafter the Licensee).
RECITALS:
By instrument dated February 9, 2006, the parties hereto or their predecessors in interest (if
any), entered into an agreement (herein the "Basic Agreement") identified as Railroad's Audit No.
239608, covering:
• the construction of a new roadway bridge and new roadway for A.W. Grimes Boulevard
under an existing railroad bridge structure. The new roadway and roadway bridge will
traverse the Railroad's property and cross Brushy Creek at Railroad Milepost 159.90 on
Railroad's Austin subdivision at DOT No. 924 253L at or near Round Rock, Williamson
County, Texas (the "Crossing Area") as the Crossing Area is generally shown on the location
print marked Exhibit A attached hereto and hereby made a part hereof. The portion of the
Political Body's roadway and roadway bridge located within the Crossing Area is hereinafter
collectively the "Roadway".
and the:
• the reconstruction of an existing Railroad structure consisting of an open deck superstructure
replaced with a closed deck superstructure and the rehabilitation of the Railroad bridge
substructure (two abutments and 5 piers) and incidental track work to facilitate the
rehabilitated structure. The structure that will carry the Railroad's locomotives and rail cars
over Brushy Creek at A.W. Grimes Boulevard, DOT Number 924 253L, at Railroad Mile
Post 159.90 on its Austin Subdivision at or near Round Rock, Williamson County, Texas, is
hereinafter referred to as the "Structure".
The parties now desire to modify the Basic Agreement by amending Article 4 in the Basic
Agreement.
AGREEMENT:
NOW, THEREFORE, IT IS AGREED by and between the parties hereto as follows:
Supplemental Agreement
Form Approved, AVP -Law 05/01/06
Page 1 of 3 May 19, 2006
UNION
P4CIFIC
BUILDING AMERICA -
SECTION 1 - AMENDMENT OF PARAGRAPH D OF ARTICLE 4 OF THE BASIC
AGREEMENT
Effective as of the date herein written, Paragraph 4 of the Basic Agreement, shall be, and
hereby is amended to read as follows:
ARTICLE 4- POLITICAL BODY'S PAYMENT TO RAILROAD.
A. The existing Structure, which is an open deck design, will not allow enough vertical
clearance to accommodate the Political Body's Roadway and the Project. In order to provide enough
clearance for the Political Body's Roadway, the Railroad will be redesigning and reconstructing the
Structure to make it a closed deck bridge and the Political Body agrees to pay the Railroad, as
provided in Paragraph B below, the costs associated with replacing two spans of the redesigned and
reconstructed Structure.
B. With respect to Paragraph A above, the Political Body agrees to pay to the Railroad a firm,
fixed amount of Two Million Five Hundred Ninety -Nine Thousand Three Hundred Thirty -Seven
Dollars ($2,599,337.00.00) in the following installment payments:
• $569,076.00 within thirty (30) days after the execution of this Agreement, of which payment
has already been received by the Railroad from the Political Body,
• $1,015,130.50 within thirty days after the Railroad notifies the Political Body that
reconstruction of the Structure is fifty percent (50%) complete, and
• $1,015,130.50 within thirty (30) days after the Railroad notifies the Political Body that
reconstruction of the Structure has been completed.
C. The Railroad agrees that all costs exceeding $2,599,337.00. involving the reconstruction of
the Structure shall be borne by the Railroad.
SECTION 2 - EFFECTIVE DATE
This Supplemental Agreement shall be effective as of the date herein written.
SECTION 3- AGREEMENT SUPPLEMENTAL
This agreement is supplemental to the Basic Agreement, as herein amended, and nothing
herein contained shall be construed as amending or modifying the same except as herein specifically
provided.
Supplemental Agreement
Form Approved, AVP -Law 05/01/06
Page 2 of 3 May 19, 2006
AN
PACIFIC
UHION
BUILDING AMERICA -
IN WITNESS WHEREOF, the parties hereto have caused this Supplemental Agreement to
be executed as of the day and year first hereinabove written.
UNION PACIFIC RAILROAD COMPANY
(Federal Tax ID #94-6001323)
By:
WITNESS:
TOK. LOVE
AVP -Real Estate
CITY OF ROUND ROCK
Supplemental Agreement
Form Approved, AVP -Law 05/01/06
Title: / f AyOe PEo --te rn
Page 3 of 3 May 19, 2006
1 S . X t
Cover S vee e t ro ion n owing the
rosin A
ee cit
w
N
7
1
s
►-E
LOCATION PRINT OF NEW UNDERPASS
PUBLIC ROAD CROSSING
CONSTRUCTION PROJECT
WAYNE 0R
dk
to�c7-1,'a 4<r1
KAROLYN DR
W OAK
LkAc DR In
tau_
,otoA 1 A.
SOSkl‘4.1c T,
06142
wtOG II
L1
0
cC
m
z
w
a
z�
MILLS MEADOW DR
MP 159.90 - Austin Subdivision
A.W. Grimes Boulevard - DOT #924 253L
New Underpass Grade Separation Crossing
Construction Project
`Y LT�k
m
Z z
2NF0.
m
r -
a)
z
}
GARDEN PATH
PETERSON ST
GARDEN PATH CV
IIMi3ERLINE DR
,:Austin Subdivision
8'z�y Gee
SUGAR BERRY CV
MP 159.90 - Austin Subdivision
Existing Railroad Bridge Over Brushy
Creek to be Replaced
MAPLE RUN DR
J
0
CC
w
w
Cil
o 'R%
Woe".
�Q v
U
DELORM
Data use subject to license.
02004 DeLorme. Street Atlas USA® 2005.
www.delorme.com
MN (5.2' E)
ft
0 1000 2000
Data Zoom 13-0
RAILROAD WORK TO BE PERFORMED:
1. Railroad will pay for the costs associated with the replacement
of 4 of the 6 bridge piers.
EXHIBIT "A"
UNION PACIFIC RAILROAD COMPANY
AUSTIN SUBDIVISION
MILE POST 159.90
GPS: N 30° 30.8368', W 97° 39.3610'
ROUND ROCK, WILLIAMSON CO., TX.
Illustrative print showing location of a new underpass
grade separation crossing construction project with the
CITY OF ROUND ROCK.
Folder No. 2356-83 Date: January 20, 2006
WARNING
IN ALL OCCASIONS, U.P. COMMUNICATIONS DEPARTMENT MUST BE CONTACTED IN ADVANCE
OF ANY WORK TO DETERMINE EXISTENCE AND LOCATION OF FIBER OPTIC CABLE.
PHONE: 1-(800) 336-9193
Exhibit A
Location Print
To Public Road Crossing Agreement
DATE: June 16, 2006
SUBJECT: City Council Meeting - June 22, 2006
ITEM: 10.A.2. Consider a resolution authorizing the Mayor to execute a
Supplemental Agreement with Union Pacific Railroad Company to
increase the City's participation in the cost of the railroad bridge over
A.W. Grimes Boulevard.
Department:
Staff Person:
Justification:
Transportation Services
Thomas G. Martin, P. E.,
Director of Transportation Services
The Supplemental Agreement amends the Public Road Crossing Agreement with the Union
Pacific Railroad (UPRR), approved by Council Action on February 2, 2006 to provide an
additional $892,109.00 to cover unforeseen increases in material and contract costs. The
revised project cost as a result of this Supplemental Agreement is now $2,599,337.00, up from
$1,707,228.00 approved in the original agreement.
Funding Cost:
Source of Funds:
Outside Resources:
$892,109.00
Transportation System Development Corporation (4B)
Union Pacific Railroad, Rodriguez Transportation Group and HDR
Engineering, Inc.
Background Information:
The A.W. Grimes Boulevard Phase II project was awarded to RGM Constructors, L.P., by
council action on July 14, 2005 for $4,978,357.76. This project is the second phase of the
A.W. Grimes Improvements. Phase I constructed a six -lane section from SH 45 to Lake Creek.
The proposed agreement will allow UPRR to reconstruct their bridge over Brushy Creek to
accommodate the City's underpass on the Railroad. When complete, A.W. Grimes Boulevard
will provide a new arterial roadway from Lake Creek to US 79 and complete the Arterial
Roadway from SH 45 to US 79.
The estimated cost of this work is $2,599,337.00, which is to be paid as follows:
$569,076.00 payable within 30 days of execution of agreement (previously paid):
$1,015,130.50 payable when reconstruction is 50% complete:
$1,015,130.50 payable when reconstruction is 100% complete.
Public Comment: N/A
DATE: 2006-04-18
ESTIMATE OF MATERIAL AND FORCE ACCOUNT WORK
BY THE
UNION PACIFIC RAILROAD
DESCRIPTION OF WORK:
BRIDGE 159.90 AUSTIN SUB AT ROUND ROCK, TEXAS
INSTALL 2 -SPAN 204' BALLAST DECK THRU PLATE GIRDER BRIDGE REPLACING
EXISTING 2 -SPAN 204' OPEN DECK THRU PLATE GIRDER BRIDGE.
PROJECT IS 100% RECOLLECTIBLE FROM THE CITY OF ROUND ROCK, TEXAS, AS
PART OF ITS PROPOSED A. W. GRIMES BOULEVARD PROJECT.
PID: 53092 AWO: 55978 MP,SUBDIV: 159.90, AUSTIN
SERVICE UNIT: 12 CITY: HUTTO
DESCRIPTION
STATE: TX
QTY UNIT LABOR MATERIAL RECOLL UPRR TOTAL
ENGINEERING WORK
BRIDGE 27780 27780 27780
CONTRACT 50000 50000 50000
ENGINEERING 20000 20000 20000
LABOR ADDITIVE 232% 42366 42366 42366
TOTAL ENGINEERING
90146 50000 140146 140146
TRACK & SURFACE WORK
BALAST 4.00 CL 2134 2329 4463 4463
BRIDGE 902214 902214 902214
CONTRACT 1045000 1045000 1045000
FIELD WELD 1081 1081 1081
LABOR ADDITIVE 232% 31385 31385 31385
MATL STORE EXPENSE 31164 31164 31164
OTM 2460 2489 4949 4949
SALES TAX 51028 51028 51028
TPG SPANS - RAW MATL 363842 363842 363842
TRACK-RELOCA 1460 1460 1460
TRK-SURF,LIN 3948 3948 3948
WELD 267 267 267
WORK TRAIN 1020 1020 1020
WT/CS ADDITIVE 245% 2499 2499 2499
XTIE 130.00 EA 10250 4621 14871 14871
TOTAL TRACK & SURFACE
56237 2402954 2459191 2459191
LABOR/MATERIAL EXPENSE 146383 2452954
RECOLLECTIBLE/UPRR EXPENSE 2599337 0
ESTIMATED PROJECT COST 2599337
EXISTING REUSEABLE MATERIAL CREDIT 0
SALVAGE NONUSEABLE MATERIAL CREDIT 0
RECOLLECTIBLE LESS CREDITS
THE ABOVE FIGURES ARE ESTIMATES ONLY AND SUBJECT TO FLUCTUATION. IN THE EVENT OF
AN INCREASE OR DECREASE IN THE COST OR QUANTITY OF MATERIAL OR LABOR REQUIRED,
UPRR WILL BILL FOR ACTUAL CONSTRUCTION COSTS AT THE CURRENT EFFECTIVE RATE.