Loading...
R-06-08-10-10C1 - 8/10/2006RESOLUTION NO. R -06-08-10-10C1 WHEREAS, the City of Round Rock has duly advertised for bids for the Red Bud Lane Phase III from CR 123 to US 79 Project, and WHEREAS, Capital Excavation has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of Capital Excavation, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Capital Excavation for the Red Bud Lane Phase III from CR 123 to US 79 Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 10th day of August, 2006. ST:, LL, ayor C "y of Rou.. Rock, Texas CHRISTINE R. MARTINEZ, City Secr tary .3PFDesktop\::OPNA/WORLDOX/O:/WDOX/RESOLUTI/R60810CI.WPp/zmC ID3 ONE COMPANY 1 Many Solution, 5:: July 26, 2006 Mr. Bill Stablein Traffic Engineering Associate / Construction Manager City of Round Rock 2008 Enterprise Round Rock, Texas 78664 Dear Mr. Stablein: Attached are the Bids received for the County Road 122 from CR 123 to US 79 Project: A total of four bids were received on the project and read aloud at City Hall on July 25, 2006. The bids were read as follows: RGM Constructors, L.P, Capital Excavation Company Chasco Constructors Joe Bland Construction, L.P. $3,649;955.97 $2,896,583.72 $3;169;747.85 $3,191,779.32 We have verified the bids and have found Capital Excavation to bethe low bidder and have included all of the forms required by the contract documents. Also attached you will find our bid tabulation and completed bid checklist for each of the bidders. Sincerely, HDR Engineering, Inc. Mark D. Borenstein Project Manager Attachments HOB Engineering, Inc. 2211 South IH -35. Suite SOO Austin. 7% 78741-3842 Phone (512)9123599 Fax -15121912-515B wwwhdmrc com vs �g m 0 0 r CR 123 eRed Bud Lane Phase DATE: August 3, 2006 SUBJECT: City Council Meeting - August 10, 2006 ITEM: 10.C.1. Consider a resolution authorizing the Mayor to execute a contract with Capital Excavation for the construction of Red Bud Lane Phase III from CR 123 to US 79. Department: Transportation Services Staff Person: Thomas G. Martin, P. E., Director Justification: New Construction Contract for Red Bud Lane Street improvements and the construction of the Bridge @ Brushy Creek. Funding: Cost: $2,896,563.72 Source of funds: 4B RR Transportation Development Corporation Outside Resources: Capital Excavation and HDR Engineering Background Information: This project will reconstruct Red Bud Lane from approximately CR -123 to US 79 including a new five -lane bridge over Brushy Creek, at grade crossing of Union Pacific tracks, add signal and intersection improvements at US 79. Public Comment: N/A