R-06-08-10-10E1 - 8/10/2006RESOLUTION NO. R -06-08-10-10E1
WHEREAS, the City of Round Rock has duly advertised for bids for
the Southwest Downtown District Improvements Project, Phase 1A, and
WHEREAS, Chasco Contracting has submitted the lowest responsible
bid, and
WHEREAS, the City Council wishes to accept the bid of Chasco
Contracting, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City a contract with Chasco Contracting for the Southwest
Downtown District Improvements Project, Phase 1A.
The City Council hereby finds and declares that written notice of
the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and
the subject matter hereof were discussed, considered and formally acted
upon, all as required by the Open Meetings Act, Chapter 551, Texas
Government Code, as amended.
RESOLVED this 10th day of August, 2006.
CHRISTINE R. MARTINEZ, City Secre
PFDesktop\::ooma/wORLDox/o:/wdox/REsocorx/xsosxoei.weo/rmc
//r
L Mayor
ty of Round Rock, Texas
PageSoutherlandPage
ARCHITECTURE INTERIORS CONSULTING ENGINEERING
July 18, 2006
Michael D. Thane
Engineering Manager
City of Round Rock
Public Works Department
2008 Enterprise Dr.
Round Rock, Texas 78664
JAMES C ALVIS, PE
l icc I'IC}Ill,ili
Regarding Recommendation for Contract.Award / Southwest Dowulostm District I frastricture Impmoement
s
Phase IA
Dear Michael,
On Tuesday, July 11, 2006 at 2:00 PM bids were received at the Public Works Department and
publicly opened and read for the Southwest Downtown District Infrastructure Improvements Phase
IA. There were three bids submitted. These bids have been checked and the bid amounts have
been tabulated. All bids appear to be correct and in order. A copy of the tabulation is enclosed.
Based on our review and confirmed by our tabulation, it appears that Chasco Constructors
submitted the lowest and best bid in the amount of $1,124,709.00. Therefore, we recommend award
of this contract for the Southwest Downtown District Improvements Phase 1A, in the amount bid,
to Chasco Constructors.
Regards,
James C Alvis, PE
Vice President/Director of Civil Engineering
AUSTIN
DALLAS
HCUS7ON
WASHINGTON DC
PAGE SOUTHER LAND PAGE. LLP
400 West Cesar Chaves Street
Fifth Floor
Austin, Texas 78701
tel: 512 472 8721
fax: 512 477 3211
wwwpspaec com
THE CITY OF ROUND ROCK
2008 Enterprise Dr.
Round Rock, Texas. 78664
(512) 218-5555
CONTRACT: Phase 1 A SWDT Improvements
oaf"
�1DS EXTENDED AND CHECKED
29767 , f BY:
FR'. ' DATE :
ref
.74 7/
SHEET
56
BID TABULATION
LOCATION : Public Works Department
DATE: BID OPENING July 11, 2006
Chaco Contracting
Lewis Contractors
PSP
7/12/2006
1 of 1
H. Deck Construction
Addendum Acknowledgment? Ye.
Safety Reeor ? Ves
Bid Bond? Yes
Addendum Acknowledgment? Ye.
Safety Record? Yes
Bid Bond? Yes
ITEM
7
4
5
6
7
DESCRIPTION
Slreel Eagveam, complete in pew )Plan OumNry).
Traffic control Plan. complete ,n Mecc,
Trench safely(as depinc). complete m plxe,
UNIT
CY
Ls
APPROX.
QTY.
350
UNIT
PRICE
530,00
$10,000.00
COST
LF
750
510,500.00
$10.000,00
Asphalt (CH 011600006Aroalwith10.5"Asphaa-
5ladlHed Base, 6' compacted Sublyede, complete,n
place.
PoWand Cement Treatment M Malenak In Place (6'),
complete In place.
Pne manwlly Placed Concrete. complete,n place.
Remnswct Catame Sidewalk Including removal of
x,sung sidewalk (4'). complete ,n place.
53,750,00
UNIT
PRICE
535.00
$22,000.00
55.00
COST
512.250.00
522,000 00
53,750.00
Addendum Aeknowledgmenl? Yes
Safety Record? No
Bid Bond? Yes, but short
UNIT
PRICE
$35.00
COST
512,250.00
$]0,000,00
530,000 00
55.00
53,750.00
SY
650
5101.00
565,650.00
$125.00
581 250.00
5110.00
571,500.00
5Y
CY
200
10
$32.00
$530,00
56,400.00
55.300.00
$42.00
51,200.00
58.400,00
512,000,00
535.00
5600.00
57.000.00
56.000.00
Flexible Base (6' Crashed Llmaslmq for Pond Acca
g Dove), complete in dace
SF
1200
57.00
$8.400.00
$12,00
514,400.00
515.00
$18,000.00
9 'P.c.
Conroe Curb S Goner, complete m
L
°Ly
aw.uu
$23,940.00
$56.00
823,520.00
$36.00
place.
Stabilized Conslrvtlion
LF
350
$21,00
$/,350,00
$20,00
$7,000.00
535.00
$18,120.00
10
nOanw 150915'1, complalem
place.
Filter Inlet Protection
EA
2
$850.00
51,700,00
$1,200.00
52,400,00
52,000.00
$12,250.00
11
(includes 6ra001015 curb inlets.
trench WreaIele,n place,
and Fence (includes
Sip Fencend[Iueee Nom,
EAa
$130,00
5520.00
5100.00
$400.00
5300.00
54,000,00
12
comp m McNeil Ra one weer
Duality
W:we Pond area), complete in Flaw'
Sotgromummyl Prepveeon,
LF
ooe +
$_00
52,000.00
$2.00
22.000.00
$5.00
51,200.00
amplere.n Place(Pion
13
14 Solely Fencing, complete 4
mpleIeB
SY
735 $1.00
5735.00
512,00
58,820,00
54.00
$5,000.00
place. LP 1550 52.00
E2.ce.Bargnoog (E
53,000,00
514,00
521,000,00
55.00
52,940,00
Commumcalionsl, complete
IS 1P500
LF 235 5145.00
E6- Duct Bank (Electrical 0, Cemmurvglionsl,
234,075.00
$144.00
533,$40.00
5160.00
27,500,00
wmplek
1 6A Precast' LF s5 $238.00
163 PrecastConmla Switchgear Pad. wmecek,n
515,470.00
5285.00
$18.525.00
$180.00
537,600.00
Platy. EA 2 55,000.00
510,000,00
55,600. 00
5111,200.00
58.000.00
511.700.00
17 Coordinmlon&Wiring - ?XV Eleclne. °amplere ,n place. Ls 1 5660.00
9' IPS, PE 2006, SDR 115,
5660.00
$5,500.00
$5,500.00
$10.0000.304400
516,000.00
0.30 wt Poly 11 Gas
18 ma,n, COmplele In 0125, LF 70 566.00
19 Tree worner cable- pedestal, complete
54,620.00
$90.00
56,300.00
5120.00
510,000.00
.6 Place.
° 51,100,00
Coordination of Wring- Time Warner
52,200,00
$1,700,00
53,400.00
$8,000,00
58,400.00
Cablereme
20 Werner Telecom., complete in Mace. LS 1 5660.00
31 As6,- Ranestal,mmplele In
$660.00
51,750.00
51,750.00
510,000.00
$16,000,00
22 Aldo - Pedestal, Pieceplace. EA 53,300.00
53,300,00
55,100.00
55.100,00
55,500.00
510,000,00
Wenn-kknrlece' EA 1 51,100.00
2J Coordination olW,dne-Alar mmplelemptaco
51,100.00
53,200.00
$3,200.00
58,000,00
55,500,00
Ls 1 5660.00
RCP. 1.6" Dla.,,ncedin6 Excavation
5660.00
55,500.00
55,500.00
$I0,000.00
$8,000,00
and 9aafq
24 complete 'n Ste,
LF 40 $445.00
RCP . 01a, including Excavation
517,800,00
5110.00
$4,400.00
$120.00
510,000,00
and Backlit.
commas
25 epmpin rims.
LF 120 5370.00
RCP. aa' DM, including Excavation
$44,400,00
5215,00
525,800.00
5180,00
$4,800,00
and eak91.
comma m
26 canp8ece. LF 417 5206.00
LF
ROP, 36'01. lm 4e' Dia. Slee'
585,902.00
5300.00
5260.00
$21,600.00
Encasement Pipe
27 1616^1, Including Mnolng or for30"ny,corgreaexi place LF 334 5780.00
Slam Water Meteor for 30'pw.wgsealer990
5260,520.00
5925.00
$308,950,00
$1,400,00
$108.020.00
(Detail
rppe(D
28 Bofis-Sn, ole 15 complete Platy. EA 58.600.00
1
Box Manhole 1515-8" ID for
$8,600,00
$6,000.00
$6,000.00
$$,000,00
5467,600,00
236'ROP, complete
29 place. EA 1 541,000,00
12'PIPE (PVC A9439%0E100
541,000.00
530.000.00
830.000.00
515,000,00
$$,000,00
claws 200, a DI AWWAU
30 100 Min. Class 200), compete in place.
6'LF 162 5265.00
PIPS AWWA 0.100 Min.
54$230.00
$250.00
$45,500.00
$120.00
$15,000.00
Class 200), complete,n
31 Place. LF 30 8185.00
32 }Pro RytlrentAssemmvlperetlan). 000p10em
55,550,00
$175.00
$5,250.00
$100,00
521,840.00
vlea.
33 6' Gale Valve, compkle in place. EA 1 54,800,00
54,800410
55,500,00
55,500,00
$4,500,00
53,000.00
1 51,65000
34 12 cele vale complete m plea_
$1,650,00
51,750.00
$1,/50,00
52,000,110
54,000,00
p
FA a $2,500.00
35 zae'lee, complete gece.
$IS,O0.0
23,100.00
53,000.00
5_ 000.00
EA 0$18,600.00
50.00
36 a 10 12^ Reducer, complete,n piece.
50.00
5200.00
50.00
5400.00
518,000.00
En 2 5x00.00
P004 Eaayaron (Incudes all
5400,00
$850.00
$1,700.00
5800.00
50.00
excam0On aoum of McNeil
37 Ray compete in Plaa (plan Quantity).
nay Polo LCY 4635 $41.00
4ap2' Thkk, Per Detail).
$189,994.00
$30.005139,020.00
$35,00
51,600.00
complete
38 place. (PbnQuantity)
Ma SY 2217 56.00
Tstf Rmnroramvm Ma)
513,302.00
55,00
511,085.00
$15.00
$162,190,00
place. ,,&90104 and
J9 established). cnmpktemplaza sY 1621 $8.00
40 Stone Rip -Rap (D50 Average 42?, complete
513,4)6,90
$14,00
523,481.00
$15.00
$33,255.00
x, place . sy to $79.00
Duffel (48" Double Headwall
$790,00
$280,00
$2,800.00
$36,00
$25.155.00
am Ent0? u1npalors).
41 ...PHI.. Box(Shee Ls 1 $4,700,00
42 Splitter cox lsnce100,15),Canpl.re,n
54,700.00 $16.000.00
$16,000.00
59,000.00
5360.00
plow. LS 1 $$5,000,00
43 uabwn Wall (1's5'o s'), complete m
$$5,000.00 560,000,00
$60,000.00 $65,000.00
$9,000.00
place. CY 55 5105,0p
44 Freer Gravel. Complete in pace,
511.275,00
5215.00
$11.825.00
$500,00
565,000.00
CY 12
45A cemecmem Plea. 535.00
$670,00
275.00
5900.00
540.00
527,500.00$48
6Pilfer Highana,
456 High CM1wmek Fo„a, 5n place. LF 155 535.00
$6,200.00
520.00
59,500.00
$30.00
$600.00
LF coo 520.00
6' nigh Double steno caro
511,200.00
520.00
511,300.00
530.00
16,800.00
Ft.
(22 F1. Wide). complete m
46 plate'
HydroEA 1 51.100.00
Vepelel100, lmgtka
51.100,00
51,500.00
51,500.00
53.000,00
516,800.09
Established, complete
47 Prime.
SY 2200 81.00
48 0^ Pedometl PVC PIPE, compote in
$2200.00
55.00
511,000.00
53.00
53,000,00
pen
piece. LF 32o 522,00
9 B'
4PVC WHY Urate Pipe, ampkk in Mace.
57,040,90
530.00
580.00
56,600.00
LF 164 5$2.0059,690,00
Implementation of Slonn Water
58,528,00
560.00
59,840,00
590.01
525,600.00
Po6u0on Prevention Pen
50 (SWPPP) ane Water Pcllubon Abatement Plan (WPAP) LS 1 $13.000.00
513,000,00 $5,000.00
55.000.00 $4,500.90
$14,760.00
TOTAL
51,124,709,00
51,214,806,00
54.500.00
51.404,870.00
I:/Engmeenng/Counctl Maps/SWDN fWNPH1.mxd
1atngmeenng/t,ouncd Maps/SWDN 1 WNPH1.mxd
DATE: August 3, 2006
SUBJECT: City Council Meeting - August 10, 2006
ITEM: 10.E.1. Consider a resolution authorizing the Mayor to execute a Construction
Contract with Chasco Contracting for the construction of a regional water
quality pond along with various utilities associated with the Southwest
Downtown District Improvement Project, Phase 1A.
Department: Engineering & Development Services
Staff Person: Tom Word. Chief of Public Works Operations
Justification:
This project is part of the infrastructure improvements planned for the Southwest Downtown
District. The City made the decision to proceed with bidding this part of the project while waiting
for the decision on federal funding associated with the remaining improvements to be constructed
within the downtown district area (Bagdad, Harris, Brown, etc.). This particular project includes
water, stormwater, and dry utility infrastructure improvements in the Florence, McNeil, and Blair
intersection as well as a boring of a storm sewer line beneath McNeil Road and the construction of
a regional water quality pond south of the Union Pacific Railroad. The water quality pond is
required to be constructed as part of our approved Water Pollution Abatement Plan with the Texas
Commission on Environmental Quality (TCEQ). As new development projects occur in the
downtown district, this pond is required in order to capture stormwater runoff from these
developed areas located over the Edwards Aquifer Recharge Zone.
Three contractors submitted bids on this project. The lowest bid was $1,124,709 received from
Chasco Contracting. The second bid was $1,214,806 received from Lewis Contractors and the
third bid was $1,404,870 received from H. Deck Construction. After review of the bids received,
we are recommending award of the contract to Chasco Contracting.
Funding:
Cost:
Source of funds:
Outside Resources:
$1,124,709
2002 G.O. Bond
Page Southerland Page, L.P.
Background Information:
The Southwest Downtown District project will provide critical infrastructure improvements to the
streets bound by Lake Creek, Round Rock Avenue, North Mays Street, McNeil Road and IH -35 on
the west side. The entire improvements include the construction of streets, sidewalks, a regional
water quality pond, water and wastewater utilities, underground dry utilities, and storm drainage
improvements for the area.
Public Comment:
Public input has been taken into consideration from neighborhood meetings and individual
meetings with the citizens and business owners in this area of Round Rock.