Loading...
R-06-09-14-11D1 - 9/14/2006RESOLUTION NO. R -06-09-14-11D1 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ("Contract") with HDR Engineering, Inc. for IH -35 modifications from Chandler Road to Westinghouse Road, and WHEREAS, HDR Engineering, Inc. has submitted Supplemental Contract No. 5 to the Contract to modify the provisions for the scope of services, and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 5 with HDR Engineering, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Contract No. 5 to the Contract with HDR Engineering, Inc., a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 14th day of Septembe ATTEST R E L Mayor City of Round Rock, Texas CHRISTINE R. MARTINEZ, City Secreta @PFDesktop\ ODMA/WORLDOX/O:/wdox/RESOLUTI/R60914D1.WPD/rmC STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 5 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HDR Engineering, Inc. ("Engineer") ADDRESS: 4401 West Gate Blvd., Suite 400, Austin, TX 78745 PROJECT: IH -35 Frontage Road (Chandler Road to Westinghouse) This Supplemental Contract No. 5 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and HDR Engineering, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 1 lth day of March, 2004 for the IH 35 Frontage Road (Chandler Road to Westinghouse) in the amount of $836,329.00; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 1 on January 13, 2005, to modify the provisions for the scope of services and to increase the compensation by $418,431.00 for a total of $1,254,760.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on July 28, 2005, to modify the provisions for the scope of services and to increase the compensation by $158,520.00 for a total of $1,413,280.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. 3 on September 8, 2005 to modify the provisions for the scope of services and to increase the compensation by $34,742.00 for a total of $1,448,022.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. 4 on March 23, 2006 to modify the provisions for the scope of services and to increase the compensation by $57,499.00 for a total of $1,505,521.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $58,759.00 for a total of $1,564,280.00; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: Supplemental Contract Hdr-ih35; tx04mod35; 103814 EXHIBIT HA 1 Rev.03/02/04 84275 I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $58,759.00 the lump sum amount payable under the Contract for a total of $1,564,280.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. HDR ENGINEERING, INC. By: -der, Ak« 4, 6,2acr,, se, Ka (4. Date CITY OF ROUND ROCK APPROVED AS TO FORM: By: Nyle Maxwell, Mayor Stephan L. Sheets, City Attorney Date Supplemental Contract Hdr-ih35; tx04mod35; 103814 2 Rev.03/02/04 84275 ADDENDUM TO EXHIBIT B Engineering Services The changes to the scope of this project are as follows: The work to be performed under this supplement shall consist of completing the following items/information between Chandler Creek and Chandler Road along the northbound IH 35 frontage road and along Chandler Road.to the east of the existing Chandler Road bridge and construction documents: For Lump Sum Services: PROVIDE SUPPLEMENTAL DESIGN SERVICES: 1. Design one tiebeam repair for Westinghouse Turnaround Bent 2 & 4 2. Design one tiebeam repair for Chandler Rd Turnaound Bent 3. 3. Attend Additional Project Coordination Meetings 4. Developed a temporary striping plan at new entrance ramp to IH 35 5. Development of Temporary IH 35 entrance and exit ramps 6. Traffic Control Plan for closing rest areas 7. Typical Sections for both ramps 8. Alignment Data and Signing & Striping Sheet for temp exit ramp 9. Quantities and Cost Estimate 10. Provide additional support to field staff. 11. Modified Ikea driveway median on Chandler Rd Project Project Manager/Senior Design Junior Engineer -in- Sr. Design CADD Principal Engineer. Engineer Engineer Training Technician Technician Clerical/Steno 0 N CO CO co C D ,- ��,-11' 0 CV r -- 0 N O 0 O,_0.10.1,..C° V' V' CO O W O N N O ,-- CV V CO 0 O N ONS,_CVa-.-�N� v 0 72 198 0 0 74 36 0 0 82 227 0 17 86 46 0 IBridge Change Order Services Project Management >esign one tiebeam repair for Westinghouse Turnaround Bent 2 & 4 Design one tiebeam repair for Chandler Rd Turnaound Bent 3 QA/QC Subtotal Additional Construction Services Attend Additional Project Coordination Meetings Provide additional support to field staff Modified Ikea driveway median on Chandler Rd Developed a temporary striping plan at new entrance ramp to IH 35 Development of Temporary IH 35 entrance and exit ramps Traffic Control Plan for closing rest areas Typical Sections for both ramps Alignment Data and Signing & Striping Sheet for temp exit ramp Quantities and Cost Estimate Removal Plan and Alignment Data Sheet for temp entrance ramp - Subtotal Total' EXHIBIT D Hourly Fee Schedule Project Name: IH 35 Chandler Road to Westinghouse Road - Additional Construction Services Consultant: HDR Engineering, Inc. Cost Component, Hours Project Principal Project Manager/Senior Engineer. Design Engineer Junior Engineer Engineer -in -Training Sr. Design Technician CADD Technician Clerical/Steno Total Hours Cost Component, Dollars Project Principal Project Manager/Senior Engineer. Design Engineer Junior Engineer Engineer -in -Training Sr. Design Technician CADD Technician Clerical/Steno Labor Dollars Technology Fee Direct Expenses Dollars Bridge Change Order Services 0 10 29 0 17 12 10 0 Additional Const Total Services Hours 0 72 198 0 0 74 36 0 0 82 227 0 17 86 46 0 78 Rate $236 $170 $129 $108 $92 $99 $77 $62 $4 $0 $1,695 $3,754 $0 $1,572 $1,183 $771 $0 $8,975 $320 380 $0 $12,205 $25,630 $0 $0 $7,298 $2,774 $0 $47,907 458 $0 $13,900 $29,384 $0 $1,572 $8,482 $3,544 $0 $56,881 $1,558 $1,878 $320 Bridge Change Order Services $9,295 $1,558 $1,878 Additional Const Services $49,465 TOTAL $58,759 $18,456 $32,331 $1,878 $6,094 $58,759 1 TOTAL HOURLY FEE Direct Labor Indirect Costs Direct Costs Profit @12% Total HDR Fee Westinghouse Turnaround Bent 2 or 4 and Chandler Turnaround Bent 3 Option 1 r r 1 Chandler Turnaround Bridge Bent 3 Option 2 r Y f DATE: September 6, 2006 SUBJECT: City Council Meeting - September 14, 2006 ITEM: *11.D.1. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 5 with HDR Engineering, Inc., for engineering services for the IH -35 improvements Project. Department: Transportation Services Staff Person: Thomas G. Martin, P. E., Director of Transportation Services Justification: Concrete placed by the contractor failed to meet minimum compressive strength specification requirements. The contractor has requested HDR to redesign the bridge support system to safely accommodate the lower strength concrete. Austin Bridge and Road will reimburse the City for the cost of the redesign. The additional fees were for design of a temporary on and off ramps, coordination meetings with the CORR & Austin Bridge & Road, design of traffic control for closure of the rest area and some redesign work of the IKEA driveways. Funding: Cost: $58,759.00 Source of funds: $9,295 from Austin Bridge & Road $49,464 from 4B -RR Transportation Development Corporation Outside Resources: HDR Engineering, Inc. Background Information: The original scope of this project included the reversing of the on and off ramps at Chandler Road, construction of a turnaround structure at Chandler Road at IH -35. The original contract with HDR Engineering for the design of this work was approved by the Council at their March 11, 2004 meeting. Supplemental Agreement No. 1, approved by the City Council at their January 13, 2005 meeting, revised the scope to include the design of a turnaround structure at Westinghouse Road, widening Chandler Road /RM 1431 overpass to a six lane structure, and ancillary roadway work to align with the bridge widening, as well as miscellaneous acceleration and deceleration lane work to improve traffic flow, extension of the north bound frontage road to Westinghouse Road and associated intersection improvements. Supplemental Agreement No. 2, approved by the City Council at their July 28, 2005, revised the scope to include work required by TxDOT that included improvements to better allow for increased traffic volumes anticipated due to the proposed Simon/Chelsea Development in the area of Chandler Road/RM 1431, IH -35, and Westinghouse Road. Supplemental Agreement No. 2 also included revisions of the traffic control plan; revised storm sewer plans; revised design of Chandler Road bridge for the inclusion of 2 additional lanes; and miscellaneous utility relocation services. Supplemental Agreement No. 3 included a right turn lane, an acceleration lane, and entrances to the Ikea facilities along the Northbound IH 35 frontage road between Chandler Creek and Chandler Road; a right turn lane and entrances, also for Ikea, along Chandler Road; relocation of the McNeil Park entrance and road; relocation of the waterline and valves at the Northeast quadrant of the intersection of Chandler Road and northbound frontage road; and utility location services (SUE) along the project corridor. Supplemental Agreement No. 4 included the preparation a Categorical Exclusion (CE) in accordance with the policies and procedures of the Texas Department of Transportation (TxDOT) and the Federal Highway Administration (FHWA) Public Comment: N/A EXECUTED DOCUMENT FOLLOWS STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 5 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HDR Engineering, Inc. ("Engineer") ADDRESS: 4401 West Gate Blvd., Suite 400, Austin, TX 78745 PROJECT: IH -35 Frontage Road (Chandler Road to Westinghouse) This Supplemental Contract No. 5 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and HDR Engineering, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 1 lth day of March, 2004 for the IH 35 Frontage Road (Chandler Road to Westinghouse) in the amount of $836,329.00; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 1 on January 13, 2005, to modify the provisions for the scope of services and to increase the compensation by $418,431.00 for a total of $1,254,760.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on July 28, 2005, to modify the provisions for the scope of services and to increase the compensation by $158,520.00 for a total of $1,413,280.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. 3 on September 8, 2005 to modify the provisions for the scope of services and to increase the compensation by $34,742.00 for a total of $1,448,022.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. 4 on March 23, 2006 to modify the provisions for the scope of services and to increase the compensation by $57,499.00 for a total of $1,505,521.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $58,759.00 for a total of $1,564,280.00; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: Supplemental Contract Hdr-ih35; tx04mod35; 103814 Rev.03/02/04 84275 I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $58,759.00 the lump sum amount payable under the Contract for a total of $1,564,280.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. HDR ENGINEERING, INC. By: S2. C5 1,E4r 04, Date CITY O " OU • D By: w i, ayor Date Supplemental Contract Hdr-ih35; tx04mod35; 103814 2 APP ' OVED AS TO F L. Sheets, City Attorney Rev.03/02/04 84275 ADDENDUM TO EXHIBIT B Engineering Services The changes to the scope of this project are as follows: The work to be performed under this supplement shall consist of completing the following items/information between Chandler Creek and Chandler Road along the northbound IH 35 frontage road and along Chandler Road.to the east of the existing Chandler Road bridge and construction documents: For Lump Sum Services: PROVIDE SUPPLEMENTAL DESIGN SERVICES: 1. Design one tiebeam repair for Westinghouse Turnaround Bent 2 & 4 2. Design one tiebeam repair for Chandler Rd Turnaound Bent 3. 3. Attend Additional Project Coordination Meetings 4. Developed a temporary striping plan at new entrance ramp to IH 35 5. Development of Temporary IH 35 entrance and exit ramps 6. Traffic Control Plan for closing rest areas 7. Typical Sections for both ramps 8. Alignment Data and Signing & Striping Sheet for temp exit ramp 9. Quantities and Cost Estimate 10. Provide additional support to field staff. 11. Modified Ikea driveway median on Chandler Rd Project Project Manager/Senior Design Junior Engineer -in- Sr. Design CADD Principal Engineer. Engineer Engineer Training Technician Technician Clerical/Steno 0 - e r N (OONOO O CO ..- rf e- e- V 0 0 0 N O 0 O V co O) N N V' O r CV 0 0 CCV e- e- e- e- N. O O N N e- 1 0 72 198 0 0 74 36 0 I 1 0 82 227 0 17 86 46 0 Bridge Change Order Services) 1 Project Management )esign one tiebeam repair for Westinghouse Turnaround Bent 2 & 4 Design one tiebeam repair for Chandler Rd Turnaound Bent 3 QA/QC 1 Subtotal Additional Construction Services Attend Additional Project Coordination Meetings Provide additional support to field staff Modified Ikea driveway median on Chandler Rd Developed a temporary striping plan at new entrance ramp to IH 35 Development of Temporary IH 35 entrance and exit ramps Traffic Control Plan for closing rest areas Typical Sections for both ramps Alignment Data and Signing & Striping Sheet for temp exit ramp Quantities and Cost Estimate Removal Plan and Alignment Data Sheet for temp entrance ramp - 1 Subtotal m 0 F EXHIBIT D Hourly Fee Schedule Project Name: IH 35 Chandler Road to Westinghouse Road - Additional Construction Services Consultant: HDR Engineering, Inc. Cost Component, Hours Project Principal Project Manager/Senior Engineer. Design Engineer Junior Engineer Engineer -in -Training Sr. Design Technician CADD Technician Clerical/Steno Total Hours Cost Component, Dollars Project Principal Project Manager/Senior Engineer. Design Engineer Junior Engineer Engineer -in -Training Sr. Design Technician CADD Technician Clerical/Steno Labor Dollars Technology Fee Direct Expenses Dollars Bridge Change Order Services 0 10 29 0 17 12 10 0 Additional Const Total Services Hours 0 72 198 0 0 74 36 0 0 82 227 0 17 86 46 0 78 Rate $236 $170 $129 $108 $92 $99 $77 $62 $4 $0 $1,695 $3,754 $0 $1,572 $1,183 $771 $0 $8,975 $320 380 $0 $12,205 $25,630 $0 $0 $7,298 $2,774 $0 $47,907 $1,558 458 $0 $13,900 $29,384 $0 $1,572 $8,482 $3,544 $0 $56,881 $1,878 $320 Bridge Change Order Services $1,558 Additional Const Services $1,878 TOTAL $58,759 $18,456 $32,331 $1,878 $6,094 $58,759 TOTAL HOURLY FEE $9,295 $49,465 Direct Labor Indirect Costs Direct Costs Profit @12% Total HDR Fee Westinghouse Turnaround Bent 2 or 4 and Chandler Turnaround Bent 3 Option 1 r 1 r 1 Chandler Turnaround Bridge Bent 3 Option 2