CM-2016-1148 - 7/15/2016J rev, 01/16 Department: Project Name: City Project ID Number Contract Quantity Adjustment/Change Order Parks and Recreation Pane l of 3 Stella Park Improvement Project Date: 6/15/16 Change Order/Quantity Adjustment No, 1 Vendor Patin Construction LLC 3800 West 2nd St, Taylor, TX 76574 512-269-1072 Company Name Address Phone No. lustification -oncrete flatwork decreased when trail removed from design plan due to site conditions, overestimated amount of trench drain needed to be nstalled at park SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Amount % Change 265,534.00 -$17,540.00 -$17,540.00 $247,994.00 0% Original Contract Time: 120 days Time Adjustment by previous Quan. Adj./Change Order: 0 days Time Adjustment by this Quan. Adj./Change Order: 0 days New Contract Time: 120 days Submitted for Approval $0.00 0% $0.00 0% $247,994.00 -$17,540.00 Printed Name Title Company -- -- gnatur p y Date Approvals Contractor: j ✓ i ,�� /�f �?/� r'� F Signature Printed Name, Title, Company Date n1 Contract Quantity Adjustment/Change Order f re:, UI/16 Project Name: Stella Park Improvement Project Quan. Adj./Change Order No rltraniifi, Atlirrct-..,o.,a- nit Pa`*e 3 of -s Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment 1 Concrete Flatwork SF 748 $5.00 2 6" Trench Drain L F 15 $120.00 -$3,740.00 -$13,800.00 $0.00 $0,00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: -!517,540.00 0 City of Round Rock F' ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Patin Construction, LLC for the Stella Park Improvement Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 7/15/2016 Dept Director: Rick Atkins, Director Cost: Indexes: Attachments: LAF - Quantity Adjustment -Change Order #1 w- Patin Construction LLC (00359995xA08F8).pdf, Stella - C01 (Signed) 160628.pdf Department: Parks and Recreation Department Text of Legislative File CM -2016-1148 Consider executing Quantity Adjustment/Change Order No. 1 with Patin Construction, LLC for the Stella Park Improvement Project. This item will authorize the City to execute CO #1, which will include deductions of concrete flatwork and amount of 6" trench drain. Removing a portion of the proposed trail due to site conditions resulted in a deduction of concrete flatwork from original contract. Deduction of amount of 6" trench drain was due to an overestimation of needed 6" trench drain during the design process. The Stella Park Improvement Project is being funded through the Parks and Recreation fund. The project includes the demolition of existing park amenities, site prep, new construction of concrete flatwork, park amenity installation, and masonry. Team members met with the neighborhood three times over the past year to gather input on the park improvement plan and have been met with overwhelming support. The final plan presented to the neighborhood received positive feedback and the neighborhood was excited to see the redevelopment efforts by the city. It aligns with the Game On: Parks and Recreation Master Plan and the City Strategic Goals under Places and Spaces: -Prevent neighborhood deterioration -Improve City aesthetics, development and redevelopment quality, and sustainability City of Round Rock Page 1 Printed on 7/1412016 Agenda Item Summary Continued (CM -2016-1148) -Identify and plan for future connectivity and mobility needs and options Department official recommends approval of this item. City of Round Rock Page 2 Printed on 711412016