CM-2015-678 - 2/13/2015City of Round Rock wn.Roa` Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 1 with Freese and Nichols for the Reuse Water Transmission Main - Phase VI Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 2/13/2015 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $11,603.00 Indexes: Self -Financed Water Construction Attachments: SC#1 FreeseNichols ReusePhVl CM2.13.15 Department: Utilities and Environmental Services Text of Legislative File CM -2015-678 This project continues the City's efforts to provide Reuse Water to the developing Northeast area of Round Rock. The original Professional Services Contract with Freese and Nichols was for Design and Construction of a 12 -inch Reuse Water Transmission Main beginning at the north end of Phase II - A Reuse Water Transmission Main; thence, generally north along the "MOKAN R.O.W." through the Avery Centre East and Nelson properties to the north side of University Boulevard. This reuse water line will be constructed to serve the Avery North Development (Vizcaya). The cost of the original contract was $114,052 with an anticipated completion date of June 2015, Supplemental Agreement No. 1 is needed for replacement of reuse pipeline in the Phase VI - Reuse Water Transmission Main project. This portion of the line was removed to facilitate construction of a conflicting wastewater gravity main. The Supplemental Agreement No. 1 fee is $11,603 which brings the total contract amount to $125,655. Staff recommends approval. CeyofRound Ro[k Page 1 W.w m W=015 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Department Name: Utilities & Environmental Services Project Name: Reuse Water Transmission Mein Phase Vl Project MgrlResouroe: Eddta Zapata ContractodVendor. Frees. and Nichols Council Action: ORDINANCE RESOLUTION QCity Manager Approval CMA Wording Consider executing Supplemental Contract No. 1 with Freese and Nichols for the Reuse Water Transmission Main - Phase VI Project. O:\wdox\SCCInts10199\1495\MISC\00328652.XLS Updated 6/3/08 STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO.1 TO CONTRACT FOR ENGINEERING SERI FIRM: FREESE AND NICHOIS ('Engineer") ADDRESS: 10431 Morado Circle— Suite 300, Austin, TX 78759 PROJECT: Reuse Water Transmission Main — Phase VI This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Freese and Nichols, hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 23rd day of October, 2014 for the Reuse Water Transmission Main — Phase VI Project in the amount of $114,052.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $11,603.00 to a total of $125,655.00; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: Article 2. Engineering Services and Exhibit B. Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. 11, Article 4, Compensation and Exhibit D. Fee Schedule shall be amended by increasing by $11,603.00 the lump sum amount payable under the Contract for a total of $125,655.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplememal Conlm Rev.12/01M 0199.1495;00328599 84275 cM-acns- �n9 FREESE ANP MICHOLS By: - R Al L .T-2d/i Date CTTYOCK AP VED AS T ORM: By: er yt2�� Stepha L. Shceta, City Attorney Date Supplemenml Cmlmct Rev.12101108 0199.1495; W32W99 89275 ADDENDUM TO EXHIBIT B Engineering Services The City of Round Rock requested that the Engineer add replacement of approximately 30 LF of the Chandler Creek reuse pipeline to the Phase VI — Reuse Water Transmission Main project. This portion of the line was removed to facilitate construction of a conflicting wastewater gravity main. Proiect Management 1. Update the Quality Assurance & Quality Control Plan for the project. Surveying 1. Perform topographic and boundary survey for reuse water pipeline alignment (BY SUBCONSULTANT). Final Design Phase 1. Conduct a single site visit with the City and Surveyor. 2. Gather information on tie-in locations, record data, and present utilities in the area. 3. Design plan and profile of Chandler Creek reuse pipeline reconnection and appurtenances. 4. Produce Issued for Bid plans and specifications for the Chandler Creek reuse pipeline reconnection for inclusion into the Phase VI reuse project. Construction Phase 1. Review submittals associated with the Chandler Creek reuse pipeline (2 submittals max). 2. Review RFPs associated with the Chandler Creek reuse pipeline (2 RFI's max). 3. Review record data associated with the Chandler Creek reuse pipeline (2 max). 4. Include Chandler Creek reuse pipeline in one site visit and monthly progress meetings (1 site visit max). 5. Include Chandler Creek reuse pipeline in final walk through. 6. Include Chandler Creek reuse pipeline in Record Drawings jll"x17"). 0 m 0 0 0 0 0 0 0 0 0 y0y Q p 0 N V 0 F CIF � f 9 H H IA O O O O O C U - a w w w w o t m ad 0 0 U aq 0 o00, m N OJ 0 N Y M CJ d O J 12 'o � g 9 F_ N t c E R C CN 01 O C g 0 2 Z w 0 ? O N LL U h � D r N M V 2 Y Y Y Y