G-04-10-26-14A1 - 10/26/2004ORDINANCE NO. @OL/JOD -lqR I
AN ORDINANCE AMENDING CHAPTER 10, SECTION 10.204, CODE
OF ORDINANCES (1995 EDITION), CITY OF ROUND ROCK, TEXAS,
BY AMENDING THE WATER AND WASTEWATER IMPACT FEES,
AND ADOPTING NEW LAND USE ASSUMPTIONS AND CAPITAL
IMPROVEMENT PLAN; PROVIDING FOR A SAVINGS CLAUSE AND
REPEALING CONFLICTING ORDINANCES OR RESOLUTIONS.
WHEREAS, Sec. 395.052, Tex. Local Gov't Code, requires a
municipality imposing impact fees to review and evaluate its
current land use assumptions and capital improvements plan at least
every five (5) years (dating from the day the initial capital
improvements plan is adopted); and
WHEREAS, the last time such land use assumptions and capital
improvements plan were review, evaluated and updated was two (2)
years ago; and
WHEREAS, the City Council has reviewed, evaluated, and now
wishes to adopt updated land use assumptions and a capital
improvements plan in order to comply with said Texas Local
Government Code requirements for same; Now Therefore
BE IT ORDAINED BY THE COUNCIL OF THE CITY OF ROUND ROCK,
TEXAS, THAT:
I.
That Chapter 10, Section 10.204, Code of Ordinances (1995
Edition), City of Round Rock is hereby amended in its entirety and
shall read as follows:
@PFDesktop\::ODMA/WORLDOX/O:/WDOX/ORDINANC/041014A1.WPD/bbw
10.204. WATER AND WASTEWATER IMPACT FEES
(1) General Provisions
(a) Purpose. This section is intended to assure the provision of adequate public
facilities to serve new development in the City by requiring each development to
pay its pro rata share of the costs of improvements necessitated by and attributable
to such new development. Impact fees established by this section are additional
and supplemental to, and not in substitution of any other requirements imposed by
the City on the development of land or the issuance of building permits or
certificates of occupancy. Such fee is intended to be consistent with and to further
the policies of the City's Comprehensive Plan, the Capital Improvement Plan, the
zoning ordinance, subdivision regulations and other City policies, resolutions and
ordinances by which the City seeks to provide adequate public facilities in
conjunction with the development of land.
(b) Applicability. This section shall be applicable uniformly to new development that
occurs within the water and wastewater service area. For new development that
occurs within the boundaries of the city's wholesale customers or other political
subdivisions, the applicability and terms for the assessment and collection of the
impact fee shall be defined by agreement.
(c) Authority. This section is adopted pursuant to V.T.C.A., Texas Local
Government Code ch. 395, the constitution and laws of the state, and the Round
Rock Charter. The provisions of this section shall not be construed to limit the
power of the city to adopt an impact fee pursuant to any other source of local
authority nor to limit the utilization of any other methods or powers otherwise
available for accomplishing the purposes set forth herein.
(d) Development Approval. No application for new development shall be approved
by the City without assessment of an impact fee pursuant to this section, and no
water and wastewater tap shall be connected unless the impact fees assessed by
this section have been paid.
(e) Definitions. In addition to the terms defined in the Texas Local Government Code,
Section 395.001, the following terms, as used in this section, shall have the
meanings ascribed to them herein below:
"Act" means V.T.C.A., Local Government Code Section 395.001 et seq.
"Assessment" shall have the meaning set forth in subsection 395.016(1) of the Act.
"Director" means the Chief of Public Works Operations or his designee.
"Living Unit Equivalent "(LUE) is the standardized measure referred to in the
definition of service unit in the Act and in this section. LUE consumes 450
gallons per day of water and produces 350 gallons per day of wastewater.
2
"Wastewater facility" means a capital improvement or facility expansion for
providing wastewater service including but not limited to land or easements,
treatment facilities, lift stations, and interceptor mains. The term does not include
wastewater lines or mains which are constructed by developers, the costs of which
are reimbursed from charges paid by subsequent users of facilities and which are
maintained in dedicated trusts. The term "wastewater facilities" also does not
include dedication of easement or rights-of-way or easements or construction or
dedication of on-site wastewater collection facilities required by valid ordinances
of the City and necessitated by and attributable to new development.
"Water facility" means improvements for providing water service including but
not limited to land or easements, water supply facilities, treatment facilities,
pumping facilities, storage facilities or transmission mains. The term does not
include water lines or mains constructed by developers, the costs of which are
reimbursed from charges paid by subsequent users of the facilities maintained in
dedicated trusts. The term does not include dedication of rights-of-way or
easements or construction or dedication of on-site water distribution facilities
required by valid ordinances of the City and necessitated by and attributable to
new development.
(2) Land Use Assumptions.
(a) The updated Land Use Assumptions for the City dated W-24- Oil , are hereby
adopted and incorporated by reference and shall be kept of record in the office of
the City Secretary.
(b) Said Land Use Assumptions for the City shall be updated at least every five (5)
years utilizing the amendment procedure set forth in the Act.
(c) Amendment to the Land Use Assumptions shall incorporate projections of changes
in land uses, densities, intensities and population for the service area over at least
a ten-year period.
(3) Water and Wastewater Impact Fee Service Area
(a) Water and Wastewater Impact Fee Service Area, the boundaries of which are
depicted on the map dated Jo. 20 - 0 9 , have been approved by the City
Council and a map showing such service areas shall be kept of record in the office
of the City Secretary.
(b) The boundaries of the Water and Wastewater Impact Fee Service Area may be
amended from time to time in accordance with the procedures set forth in the Act.
(4) Impact Fee Capital Improvements Plan For Water And Wastewater Facilities
(a) The Impact Fee Capital Improvements Plan For Water and Wastewater Facilities
dated 10-24- 04 , is adopted and incorporated in this section by reference and
shall be kept on record in the office of the City Secretary.
3
(b) The Impact Fee Capital Improvements Plan For Water and Wastewater Facilities
may be amended from time to time pursuant to the procedures set forth in the Act.
(5) Determination Of Service Units
(a) Conversion Table. The number of service units for both water and wastewater
service is determined by the size and type of the water meter purchased for the
property in accordance with the following schedule:
Meter Size (Inch)
Service Units
5/8 X 3/4
1.00
3/4
1.5
1
2.5
1.5
5.0
2
8.0
3
16.0
4
25.0
6
50.0
8
80.0
10
115.0
(b) Calculation. Service units shall be calculated based upon the size of the water
meter as set out above.
(c) No Water Meter. Upon application for a building permit for lots for which no
water meter has been purchased, wastewater service units shall be determined by
a professional engineer licensed in the State of Texas subject to the approval of
the Director.
(d) Nonstandard Meter. No adjustment in service units shall be made for water use
or fire demand that falls between standard meter sizes or combinations.
(e) Revision of Service Units Designation. The City may revise the service units
designation in accordance with the procedures set forth in the Act.
(6) Impact Fees Per Service Unit
(a) Maximum Allowable Fee. The maximum impact fee per service unit shall be
computed by dividing the cost of water and wastewater capital improvements and
facilities expansions necessitated by and attributable to new development identified
in the impact fee capital improvements plan for each category of capital
improvements by the total number of projected service units in the impact fee
service area based upon the land use assumptions, and then may be adjusted to
reflect a credit, as appropriate, for other non -fee methods of capital payments
referenced in Section 395.014(7), Texas Local Government Code. Maximum
impact fees per service unit shall be established for each category of capital
4
(b)
improvements and are on record in the office of the City Secretary, and
incorporated in this section by reference.
Beginning on JAN. I 2005" , the City shall assess and collect per service unit
to be served by the City's water system a Water Impact Fee of Four Thousand
Two Hundred Ninety-six Dollars ($4,296.00).
(c) Beginning on JAN. 1) 2 05 , the City shall assess and collect per service unit
to be served by the City's wastewater system a Wastewater Impact Fee of One
Thousand Three Hundred Six Dollars ($1,306.00).
(7) Assessment Of Impact Fees
(a) The City shall assess the impact fees per service unit in affect at the time of plat
recordation of a subdivision plat or other plat under Subchapter A, Chapter 212,
or the City's subdivision ordinance.
(b) Except as provided in section 395.019 of the Act, the City shall collect the fees
as follows:
(1) At the time the political subdivision issues a building permit; or
(2) For land platted outside the corporate boundaries of the City, the City
shall collect the impact fees at the time an application for an individual
meter connection to the City's water or wastewater system is filed.
(c) For land on which new development occurs or is proposed to occur without
platting, the City may assess the impact fees at any time during the development
and building process and may collect the fees at either the time of recordation of
the subdivision plat or connection to the City's water or wastewater system or at
the time the City issues either the building permit or the certificate of occupancy.
(d) Following assessment of the impact fee hereunder, the amount of the impact fee
per service unit may not be increased above the assessed fee unless the owner
obtains final approval for replatting in which case a new assessment shall occur
at the assessed water and wastewater impact fee per service unit in effect at the
time of such replatting.
(e) An application for an amended plat made pursuant to Texas Local Government
Code Section 212.016 or the City's subdivision rules is not subject to a
reassessment of the impact fee.
(8) Calculation Of Impact Fees
(a) The water and wastewater impact fees shall be based on the size of the water
meter determined by the Director to be necessary to serve the development and
the number of service units associated with that size of water meter. If the City
allows a development to connect to the wastewater system without connecting to
the water system, the Director shall determine the size of the water meter that
would be required if the development did connect to the water system. The
5
(b)
number of service units associated with the various sizes of water meter are set
forth herein in Section (5), Determination of Service Units.
A property owner may submit, or the Director may require the submission of a
study, prepared by a professional engineer, licensed in the State, clearly indicating
the number of water and/or wastewater service units which will be consumed or
generated by the new development. The Director will review the information for
completeness and conformity with generally accepted engineering practices and
may, when satisfied with the completeness and conformity of the study, modify
the total number of service units required for the new development.
(c) Total service units shall be multiplied by the impact fee per service unit for water
or wastewater service as depicted in Section (6), Impact Fee Per Service Unit or
as determined in subsection (b) above.
(d) All applicable offsets, credits or discounts per service unit allowable under this
section for water or wastewater service shall be subtracted from the product
derived under subsection (c) of this section.
(e)
The amount of impact fee due for new development shall not exceed the amount
computed by multiplying the assessed fee for water or wastewater service by the
total number of service units generated by the development.
(0 Whenever the property owner increases the number of service units for a
development, the additional impact fees collected for such new service units shall
be determined based on the assessed fee and applicable offsets, credits and
discounts then in effect and such additional fee shall be collected at the time the
additional meters are purchased.
(g)
For the purpose of determining water impact fees, no additional service units are
attributable to the addition of a separate irrigation meter if the irrigation meter is
the same size as or smaller than the existing meter. If a larger irrigation meter is
installed, the water impact fee shall be the difference between that of the existing
meter and that of the irrigation meter.
(h) In determining the number of service units for wastewater impact fees, no service
units will be attributed to irrigation meters.
(i) Payment of an impact fee in accordance with the terms and conditions of this
section shall entitle the payor to receive a credit for same to be used in the event
the tap for the property for which the fee is paid expires and must be repurchased;
provided, however, that the impact fee is not refundable upon expiration of the
tap.
(j) If the tap or building permit for the property on which an impact fee is paid has
expired and a new application is thereafter filed for the identical property and the
same number of service units, the impact fee previously paid satisfies the
requirements of this section.
(k) The impact fee shall attach to the property for which the impact fee was paid and
shall not be transferable to other properties or service units.
(1) No request to connect to the water and wastewater system shall be granted and no
building permit shall be issued if the applicant cannot verify payment of the
appropriate impact fee and other applicable fees or if existing facilities do not have
actual capacity to provide service to the new connection(s).
(9) Credits
If the City requires, as a condition of development approval, or otherwise enters into an
agreement with a developer, to have the developer construct, fund or otherwise contribute
toward the cost of a capital improvement or facility expansion included in the adopted
water or wastewater capital improvements plan, the City shall provide for reimbursement
in the form of credits against impact fees that would otherwise be due from the
development. Such credits shall run with the land and shall be used to reduce the amount
of the impact fee that would otherwise be owed at the time of collection of impact fees.
If the amount of such credits would be insufficient to reimburse the developer for the cost
of required improvements, the City shall provide for reimbursement to the developer up
to the balance of the cost of the required improvements from water or wastewater impact
fees collected from other new development within the same service area. In determining
the amount of such credits, the developer shall submit evidence of the actual, fair -market
cost of the required improvement. Such credits shall only be applicable against the impact
fees for the type of facility (water or wastewater) for which the capital improvement is
made.
(10) Exceptions And Exemptions
(a) Limitation on Modification. Except as provided in this section or by contract in
existence on the effective date of the ordinance codified in this section, any
reduction, change or modification in the amount or time of payment of the impact
fee must be approved by a duly enacted ordinance of the City Council.
(b) Fire Protection Capacity. No fee shall be collected for the purchase of a tap that
is utilized to provide only fire protection capacity.
(c) Nothing hereinabove stated shall be construed to alter the terms of a contract with
a wholesale customer of the City regarding the payment of impact fees and shall
not be construed to authorize the payment of impact fees in installments in areas
encompassed by such a contract for wholesale service.
(d) Exchange. A tap may be exchanged before any water or wastewater service has
been received for another tap without collection of the impact fees established in
this section if the exchange will result in an equivalent or lesser number of service
units to be utilized on the property for which the tap was originally purchased.
The number of service units to be exchanged shall be determined in accordance
with Section 5 and shall not be based on the number of units at the time of initial
purchase.
7
(e) Waiver. By majority vote of the City Council, a resolution or ordinance may be
adopted waiving or reducing the impact fees for a certain class of development,
or for a specific development if there is a finding that the proposed waiver or
reduction would result in substantial economic benefit to the City.
(11) Accounting For Fees And Interest
(a) All water and wastewater impact fees collected by the City shall be deposited in
interest bearing accounts clearly identifying the category of capital improvements
for which the fees were collected.
(b)
Interest earned by each account shall be credited to the account on which it is
earned and shall be used solely for the purposes specified for impact fees as
authorized hereinbelow.
(c) The City shall establish adequate financial and accounting controls to ensure that
impact fees disbursed from the account are utilized solely for the purposes
authorized in this section. Disbursement of funds shall be authorized by the City
at such times as are reasonably necessary to carry out the purposes and intent of
this section; provided, however, that any fee paid shall be expended within a
reasonable period of time, but not to exceed ten years from the date the fee is
deposited into the account.
(d) The City shall maintain and keep adequate financial records for each such
account, which shall show the source and disbursement of all revenues, which
shall account for all moneys received, the number of service units for which the
moneys are received, and which shall ensure that the disbursement of funds from
each account shall be used solely and exclusively for the provision of projects
specified in the impact fee capital improvements plan as system -related capital
projects. The City shall also maintain such records as are necessary to ensure that
refunds are appropriately made in accordance with this section.
(12) Use Of Proceeds Of Impact Fee Accounts
(a) Water and wastewater impact fees shall only be used to pay the costs of
constructing water and wastewater capital improvements or facility expansions,
including and limited to the following:
(1) Construction contract price;
(2) Subject to the provisions of subsection 395.012(b) of the Act, interest
charges, including projected interest charges, or other finance costs;
(3) Surveying and engineering fees;
(4) Land acquisition costs, including land purchases, court awards and costs,
attorney's fees and expert witness fees; and
(5) Fees actually paid or contracted to be paid to an independent qualified
engineer or financial consultant preparing or updating the capital
improvements plan who is not an employee of the City.
(b) Impact fees collected pursuant to this section shall not be used to pay for any of
the items set forth in Section 395.013 of the Act.
8
(13) Refunds
All or any portion of a water or wastewater impact fee payment that has been collected by
the City and has not been spent as authorized by this Section within ten (10) years from
the date such impact fee was collected shall be refunded pursuant to the provisions set
forth in Section 395.025 of the Act.
(14) Updates To Plan And Revisions Of Fees
The City shall review the land use assumptions and impact fee capital improvements plan
for water and wastewater facilities at least every five (5) years, with the five-year period
to commence from the date of adoption of the impact fee capital improvements plan
referenced in this section. The City Council shall accordingly make a determination of
whether changes to the land use assumptions, impact fee capital improvements plan or
impact fees are needed and shall, in accordance with the procedures set forth in the Act,
or any successor statute, either update the fees or make a determination that no update is
necessary.
II.
A. All ordinances, parts of ordinances, or resolutions in
conflict herewith are expressly repealed.
B. The invalidity of any section or provision of this
ordinance shall not invalidate other sections or provisions
thereof.
C. The City Council hereby finds and declares that written
notice of the date, hour, place and subject of the meeting at which
this Ordinance was adopted was posted and that such meeting was
open to the public as required by law at all times during which
this Ordinance and the subject matter hereof were discussed,
considered and formally acted upon, all as required by the Open
Meetings Act, Chapter 551, Texas Government Code, as amended.
READ and APPROVED on first reading this the //l- day of
at&viau
, 2004.
9
READ, APPROVED and ADOPTED on second reading this the
o -P day of (001/0 , 2004
ATTEST:
atuyLi)
Mayor
f Round Rock, Texas
CHRISTINE R. MARTINEZ, City Secretar
10
DATE: October 21, 2004
SUBJECT: City Council Meeting - October 26, 2004
ITEM: 14.A.1. Consider an ordinance amending Chapter 10, Section 10.204,
Code of Ordinances, amending the Water and Wastewater
Impact Fees, and Adopting New Land Use Assumptions and
Capital Improvements Plan. (Second Reading)
Department: Water and Wastewater Utilities
Staff Person: Tom Clark, Director of Utilities
Justification:
Water and wastewater impact fees are charged to offset the cost of constructing
infrastructure to keep up with development and allow for growth to pay for itself rather than
being paid for by ratepayers.
Funding:
Cost: N/A
Source of funds: N/A
Outside Resources: Tony Bagwell, HDR Engineering
Background Information:
At least every five years, the City's land use assumptions, capital improvement plan and
water and wastewater impact fees are reviewed for possible amendment to reflect the cost
of constructing infrastructure within the City. Impact fees assist the City in paying for the
infrastructure needed by development rather than being subsidized by ratepayers. Current
fees are $2,910 for water and $1,059 for wastewater per LUE. Over the last 18 months, the
land use projections and the Water and Wastewater Master Plans have been reviewed and
updated, and maximum potential impact fees have been calculated. A report detailing such
updates and advising the City of such maximum potential fees is presented for consideration
by the City Council and an Advisory Committee comprised of the Planning and Zoning
Commission, a member from Williamson County and a non-voting member of the Home
Builders Association of Austin. The Advisory Committee met on July 7, July 27, August 4,
and August 11, 2004 to review the impact fees and make written comments to the Council.
Public Comment:
The Public will be asked to comment at the October 14, 2004 Public Hearing.
STATE OF TEXAS
COUNTY OF WILLIAMSON
The attached 2004 Update of the Water and Wastewater Impact Fees of the City of Round Rock
has been submitted to the City Council of the City of Round Rock, Texas, at its meetings held on
October 14, 2004 and October 26, 2004, and is considered and adopted as containing the Land
Use Assumptions and the Impact Fee Capital Improvements Plan for Water and Wastewater
Facilities for the City under Ordinance No. 0-oLi-io-z-A041.
CITY OF ROUND ROCK, TEXAS
ATTEST:
Christine Martinez, City Secretary
2004 UPDATE
OF THE
WATER AND WASTEWATER IMPACT FEES
OF THE CITY OF ROUND ROCK
Prepared by:
HDR Engineering, Inc.
2211 S. IH -35, Suite 300
Austin, Texas 78746
August 2004
CERTIFICATION
The water and wastewater impact fee calculations made in this report for the City of Round
Rock were developed from land use, utility facility and financial data provided by City staff and
capital improvements program information contained in the separate 2004 Water and
Wastewater Master Plan reports prepared by HDR Engineering, Inc. and CDM, respectively.
76. ony Bagwell
Project Manager, Impact Fee Study
HDR Engineering, Inc.
James K. Haney, P.
Project Manager, Water Distribution Master Plan Study
HDR Engineering, Inc.
/(1/ e.c
LEN D
°o �sw.
• /1111/HOAOroc .,1.0,,^.
+�k=�-
54386 n
Allen D. Woelke, P.E. 54386 n
' ' : 1t lie 4-
Project Manager, Wastewatk altar Tai Ludy
CDM *74;:w:'
1010.1
2004 UPDATE OF THE
WATER AND WASTEWATER IMPACT FEES
OF THE CITY OF ROUND ROCK
Table of Contents
Section Page
1.0 INTRODUCTION AND SUMMARY 1
2.0 UTILITY SERVICE AND FEE APPLICATION AREA 2
3.0 LAND USE ASSUMPTIONS 3
4.0 CURRENT AND PROJECTED UTILITY DEMAND AND SUPPLY 4
5.0 IDENTIFIED MAJOR CAPITAL IMPROVEMENT NEEDS AND COSTS 8
6.0 CONSIDERATION OF OTHER METHODS OF CAPITAL PAYMENT 11
7.0 ALTERNATIVE IMPACT FEE CALCULATIONS 12
Attachment A — Location of Proposed Improvements Identified in the Water CIP 14
ii
Update of Water Impact Fees
2004 UPDATE OF THE
WATER AND WASTEWATER IMPACT FEES
OF THE CITY OF ROUND ROCK
1.0 INTRODUCTION AND SUMMARY
The City of Round Rock is in the process of updating its water and wastewater impact fees to
keep the fee current with newly -acquired service area and updated CIP information. This report
presents HDR Engineering, Inc.'s maximum impact fee determination for consideration by the
City's Impact Fee Advisory Committee and the Round Rock City Council.
Consistent with State law, the methodology that determines the maximum fee amount considers
for each fee component either: (1) consideration of a credit for other methods of payments for
utility capital by a new customer, such as through utility rates or taxes, or alternatively (2) a
reduction of maximum fee amount equal to 50 percent of the unit capital cost of providing new
service. By maximum amounts, this means that the determined fee amount was calculated as
the highest that can be lawfully levied by the City, given the prospective land uses and capital
improvements plan, the cost of existing and new utility capacity, and consideration of a credit to
new customers for capital contributions made through rate payments. The City Council can
decide to enact fees less than the maximum amounts shown in this report.
As detailed later in this report, the maximum impact fees were developed in component pieces.
For instance, the overall water fee is comprised of separate amounts for water supply,
treatment, pumping, elevated storage, ground storage, and transmission. This will facilitate the
consideration of offsets or credits from the applicable fee if a developer builds and dedicates
eligible facilities to the City or the City provides wholesale service to a neighboring utility and
wishes to charge only certain portions of the fee. The maximum fee amounts do not include
capital costs for any donated facilities provided by developers at their own expense.
Planning, service demand, and design factors assumptions used in the water and wastewater
facility sizing and costing were developed by HDR and CDM engineers, respectively. Data on
current utility demand, existing utility assets, outstanding utility debt and prospective cash
versus debt financing were obtained from or coordinated with the City of Round Rock staff.
HDR combined these elements into the maximum impact fee calculations presented in this
report.
Update of Water/Wastewater Impact Fees
of the City of Round Rock, Texas 1
RR
Update of Water Impact Fees
2.0 UTILITY SERVICE AND FEE APPLICATION AREA
The City's future ETJ was used as the primary basis for the impact fee service area of the City
shown in Figure 1. This fee application area boundary will comprise the area in which Round
Rock may levy the impact fees, in -part or in -full, if City service is provided. This boundary does
not, however, imply a legal obligation of the City of Round Rock to serve beyond its
incorporated limits. If the City does not provide service, in full or in -part, then the impact fees
would not apply.
CITY OF ROUND ROCK
Water and Wastewater
Impact Fee Application Boundary
Figure 1
Water and Wastewater Impact Fees Application Area
Update of Water/Wastewater Impact Fees
of the City of Round Rock, Texas 2
3
Update of Water Impact Fees
3.0 LAND USE ASSUMPTIONS
Table 1 provides an estimate of the current and future land use patterns of the potential service
area with information obtained from the City of Round Rock. As indicated, about 72% of total
City area is currently in residential land uses with 18% in commercial/industrial land uses and
9% in various open space or floodplain land uses.
TABLE 1
CURRENT AND PROJECTED LAND USE
CITY OF ROUND ROCK
Current Future (including ETJ)
ITEM Acres % Acres
Residential 27,645 72% 31,854 70%
Commercial/Industrial 6,980 18% 8,490 19%
Public Facility 425 1% 945 2%
Subtotal Developed 35,050 91% 41,289 90%
Open Space 3,464
9%
4,522 10%
Total Land Use Acreage 38,514 100% 45,811 100%
Source: City of Round Rock, 2004. Does not include acres for mining.
Assume 2013 water use rates at 90 % buildout of: 1,800 gals per new residential acre.
2,850 gals per new commercial acre.
1,300 gals per new public acre.
Over time as the City grows into its future ETJ and utility service area, developed land areas will
both increase and become a higher percentage of overall land uses. Projected residential land
uses are expected to decease slightly to 70% of total potential service land area with non-
residential and open space/floodplain shares of total land use growing slightly to 19% and 10%
of total land area, respectively.
The current 2004 water service area population is estimated at about 96,093 persons. A
projected water service area population of about 145,260 persons is anticipated by the end of
2013, reflecting an anticipated 10 -year growth of about 51%.
Update of Water/Wastewater Impact Fees
of the City of Round Rock, Texas 3
Update of Water Impact Fees
4.0 CURRENT AND PROJECTED UTILITY DEMAND AND SUPPLY
Table 2 relates the number of water and wastewater utility connections by water meter size and
what is termed a Living Unit Equivalent (or LUE) conversion factor for meters of varying sizes.
A typical single family residential house in Round Rock uses a 5/8" water meter and is
considered to be one LUE. Based on American Water Works Association standards, the
equivalent number of 5/8" meters can be determined for water meters of larger size. In this
manner, meters of larger size (i.e. larger potential service demands) can be couched in terms
the equivalent demand of a number of typical single family homes. For this reason, the LUE
concept is a useful tool for being able to apply a base fee amount to service requests of varying
meter sizes.
TABLE 2
LUE EQUIVALENT CONVERSION FACTORS
CITY OF ROUND ROCK
Meter Size
Living Units Number of Number of
Equivalent (LUEs) Meters LUE's
per Meter (a) in 2004 (b) in 2004
WATER
5/8" 1.0 23,418 23,418
3/4" 1.5 86 129
1" 2.5 311 778
1.5" 5.0 218 1,090
2" 8.0 313 2,504
3" 16.0 71 1,136
4" 25.0 32 800
6" 50.0 15 750
8" 80.0 8 640
10" 115.0
Total Water
24,472 31,245
WASTEWATER
5/8" 1.0 23,242 23,242
3/4" 1.5 71 107
1" 2.5 210 525
1.5" 5.0 165 825
2" 8.0 214 1,712
3" 16.0 58 928
4" 25.0 24 600
6" 50.0 13 650
8" 80.0 7 560
10" 115.0 - -
Total Wastewater
24,004 29,149
(a) Derived from AWWA C700 -C703 standards for continuous rated flow performance scaled to 5/8" meter.
(b) Source: City of Round Rock, meter count as of April 2004.
Update of Water/Wastewater Impact Fees
of the City of Round Rock, Texas 4
Update of Water Impact Fees
Tables 3 and 4 summarize the City's current and projected water and wastewater service
demands and existing supply (service) capabilities by facility. Current and future service
demands are also compared with the existing service capacity of the utility systems.
Water demand was forecast using population forecasts from the City Planning Department,
meter count/LUE estimates from the City Utility Billing Section, and a dry -year per capita water
use statistic used the Texas Water Development Board and the Regional Water Planning Group
in their water supply planning efforts. Wastewater demand was forecast using historical data
and technical studies of the City system.
With the anticipated rapid growth of the City and surrounding area, potable water utility demand
in certain service areas is expected to exceed the available capacity of raw and treated water
supply, pumping, elevated and ground storage, and transmission during the planning period.
Additional facilities need was also identified for wastewater treatment, pumping, and
interceptors within the future10-year period.
Update of Water/Wastewater Impact Fees
of the City of Round Rock, Texas 5
Update of Water Impact Fees
TABLE 3
EST. WATER SERVICE DEMAND & AVAILABLE CAPACITY
CITY OF ROUND ROCK
Facilty Type
2004 2013
Supply
Existing 2004 Capacity (mgd)
Est. Service Demand
Excess (Deficiency)
Existing 2004 Capacity (LUEs) *
Est. Service Demand
Excess (Deficiency)
Treatment
Existing 2004 Capacity (mgd)
Est. Service Demand
Excess (Deficiency)
Existing 2004 Capacity (LUEs) *
Est. Service Demand
Excess (Deficiency)
Pumping
Existing 2004 Capacity (mgd)
Est. Service Demand
Excess (Deficiency)
20.188 20.188
19.507 29.488
0.681 (9.300)
32,335 32,335
31,245 47,231
1,090 (14,896)
52.500 52.500
39.014 58.976
13.486 (6.476)
42,045 42,045
31,245 47,231
10,801 (5,186)
106.000 106.000
48.429 73.208
57.571 32.792
Existing 2004 Capacity (LUEs) * 68,387 68,387
Est. Service Demand 31,245 47,231
Excess (Deficiency) 37,143 21,156
Ground Storage
Existing 2004 Capacity (mg) 4.330 4.330
Est. Service Demand 2.343 3.542
Excess (Deficiency) 1.987 0.788
Existing 2004 Capacity (LUEs) * 57,733 57,733
Est. Service Demand 31,245 47,231
Excess (Deficiency) 26,489 10,502
Elevated Storage
Existing 2004 Capacity (mg) 9.870 9.870
Est. Service Demand 3.906 5.904
Excess (Deficiency) 5.964 3.966
Existing 2004 Capacity (LUEs) * 78,960 78,960
Est. Service Demand 31,245 47,231
Excess (Deficiency) 47,716 31,729
Transmission
Existing 2004 Capacity (mgd)
Est. Service Demand
Excess (Deficiency)
Existing 2004 Capacity (LUEs) *
Est. Service Demand
Excess (Deficiency)
45.000 45.000
48.429 73.208
(3.429) (28.208)
29,032 29,032
31,245 47,231
(2,212) (18,199)
* Assume LUE conversion factor of :
624 gpd/LUE for water supply
1,249 gpd/LUE for treatment
1,550 gpd/LUE for pumping
75 gals/LUE for ground storage
125 gals/LUE for elevated storage
1,550 gpd/LUE for transmission
Update of Water/Wastewater Impact Fees
of the City of Round Rock, Texas 6
Update of Water Impact Fees
TABLE 4
EST. WASTEWATER SERVICE DEMAND & AVAILABLE CAPACITY
CITY OF ROUND ROCK
Facilty Type
2004 2013
Treatment
Existing 2000 Capacity (mgd)
Est. Service Demand
Excess (Deficiency)
Existing 2000 Capacity (LUEs) *
Est. Service Demand
Excess (Deficiency)
Pumping
Existing 2000 Capacity (mgd)
Est. Service Demand**
Excess (Deficiency)
9.600
10.872
(1.272)
25,737
29,149
(3,411)
19.900
22.603
(2.703)
9.600
16.786
(7.186)
25,737
45,001
(19,264)
19.900
15.509
4.391
Existing 2000 Capacity (LUEs)* 18,477 18,477
Est. Service Demand 20,987 14,400
Excess (Deficiency) (2,510) 4,077
Interceptors
Existing 2000 Capacity (mgd) 84.000 84.000
Est. Service Demand 31.393 48.467
Excess (Deficiency) 52.607 35.533
Existing 2000 Capacity (LUEs) * 77,994 77,994
Est. Service Demand 29,149 45,001
Excess (Deficiency) 48,846 32,993
* Assume LUE conversion factor of :
**Assumes
2004 2013
373 373 gpd/LUE for ww treatment
1,077 1,077 gpd/LUE for ww pumping
1,077 1,077 gpd/LUE for interceptors
72% 32% of ww demand pumped
Update of Water/Wastewater Impact Fees
of the City of Round Rock, Texas 7
rklealls
Update of Water Impact Fees
5.0 INDENTIFIED MAJOR CAPITAL IMPROVEMENT NEEDS AND COSTS
Given the projected growth in water and wastewater demands, existing capacity, and the
modeling of additional infrastructure needs, various additional facilities have been identified to
help meet the needs for the next ten years. In year 2004 dollars, the City's 10 -year capital need
for new capacity totals about $100 million for water and $50 for wastewater. Maps of the
proposed water and wastewater capital improvements to the City -owned utility systems can be
found in Attachment A.
The projected rapid growth of City has necessitated the need for major water supply and
treatment projects. The City's near-term implementation of the Lake Stillhouse Hollow water
supply will only last the City for a limited period of time. As shown in Table 5, some additional
near-term improvements are still needed to make full use of the Stillhouse supply by 2010. It is
then forecast that a new water supply from Lake Travis will be required at that time to meet the
additional water demands during the remainder of the 10 -year planning period. Related water
treatment plant, water storage, and pumping improvements are also identified associated with
the new Lake Travis supply. The ultimate cost of the Lake Travis supply system will depend on
several factors, including more advanced design estimates, whether the City assumes an equity
role in the project and which facilities are built at ultimate capacity and which are phased and at
what size. The costs shown in Table 5 for the Lake Travis supply assume maximum economies
of scale with full development of the City contracted water supply from this source.
As indicated in Tables 4 and 6, the City has exceeded its existing contracted share of the
Brushy Creek Regional Wastewater Treatment Plant capacity and is currently being allowed to
use un -used capacity reserved for other participants. The current need for additional capacity,
as well as the project additional capacity needs of the next ten years, is necessitating a major
expansion of the plant and a major wastewater conveyance tunnel.
Tables 5 and 6 show the details related to the existing capacity of the water and wastewater
systems and proposed new facilities along with their cost, capacity, unit cost, and allocation of
existing and projected demand to these facilities. A weighted unit cost of service ($ per LUE) is
then calculated by facility type based on the proportionate share of use of existing and new
facility capacity by the growth anticipated over the next ten years.
Update of Water/Wastewater Impact Fees
of the City of Round Rock, Texas 8
Update of Water Impact Fees
TABLE 5
WATER CAPITAL IMPROVEMENTS PLAN INVENTORY AND COSTING
CITY OF ROUND ROCK
Facility Capacity Allocations (LUES)
Date of Cost Capacity Cost Existing Growth Use in Excess Total
Facility Name Need Original $ Installed $' Total LUES per LUE Customers" Next 10 Years" Capacity Capacity
WATER SUPPLY
EXISTING FACILITIES
Existing Wells and Stillhouse Supply"" n.a.
FUTURE FACILITIES
Stillhouse Raw Water Pump Station Upgrade 2004
Addil. Piping to Produce Full Stillhouse Capacity 2007
Subtotal Facilities to Make Full Use of Existing Supply
FUTURE FACILITIES
Lake Travis Raw Supply System
Subtotal Future Facilities
TOTAL WATER SUPPLY
2010
$ 26,679,330 $ 26,679,330
avg day mgd
20.188
32,335
$ 2,500,000 $ 2,500.000
$ 2,500,000 $ 2,731,818 6.500 10,411
31.245 1,090
9,711
$ 31,679,330 $ 31,911,147 26.688 42.746 $ 747 31,245 10,801
$ 5,639,410 $ 5,639,410
10.217
16,304 $
$ 5,639,410
$ 5,639,410
10.217
16,364 $
345
345
WATER TREATMENT
EXISTING FACILITIES
Existing WTP and Well Chlorination
Subtotal Existing Facilities
FUTURE FACILITIES
Lake Travis Treated Supply System
Subtotal Future Facilities
TOTAL WATER TREATMENT
WATER PUMPING
EXISTING FACILITIES
Pump Stations
Subtotal Existing Facilities
FUTURE FACILITIES
Southwest Pump Station
Subtotal Future Facilities
$ 37,318,739 $ 37,550,557 36.904 59,110
CAPITAL COST PER NEW LUE - $
$ 35,867,459 $ 35,667,459
$ 35,667,459 $ 35,667,459
mgd
818
32,335
700 10,411
700 42,746
5,185 5,185
5,185 5,185
31,245 15,987 700 47,931
52.500 42,045 $ 848 31,245 10,801
52.500 42,045 $ 848 31,245 10,801
2010 $ 58,394,097 $ 56,394,097 20.433 16,364 $ 3,446
$ 56,394,097 $ 58,394,097 20.433 16,384 $ 3,448
8 92,061,556 $ 92,061,556 72.933 58,409
AVERAGE CAPITAL COST PER NEW LUE - $ 1,691
31,245
42,045
5,185
5,185
15,988
42,045
11,179 16,364
11,179 16,364
11,179 58,409
mgd
$ 2,973,702 $ 2,973.702 108.000 68,387 $ 43 31,245 10,801 26,342 68,387
$ 2,973,702 $ 2,973,702 106.000 68.387 $ 43 31,245 10,801 28,342 68,387
2010 $ 7,500,000 $ 8,955,392
$ 7,500,000 $ 8,955,392
20.000 12,903 $ 694
25.000 12,903 $ 894
5,185
5,185
7,718 12,903
7.718 12.903
TOTAL WATER PUMPING
GROUND STORAGE
EXISTING FACILITIES
GS Tanks
Subtotal Existing Facilities
FUTURE FACILITIES
GS Tank al Southwest Pump Station
Subtotal Future Facilites
TOTAL GROUND STORAGE
ELEVATED STORAGE
EXISTING FACILITIES
ES Tanks
Subtotal Existing Facilities
FUTURE FACILITIES
ES Tank on RR1431
Subtotal Future Facilites
TOTAL ELEVATED STORAGE
$ 10,473,702 $ 11,929,094 128.000 81,290 31,245 15,986 34,060 81,290
AVERAGE CAPITAL COST PER NEW LUE - $ 255
mg
$ 1,327,498 $ 1,327,496 4.330 57,733 $ 23 31,245 10,801 15,688 57,733
$ 1,327,498 $ 1,327,496 4.330 57,733 5 23 31,245 10,801 15,688 57,733
2012 $ 3,000,000 $ 3,800,310
$ 3,000,000 $ 3,800,310
5.000
5.000
66,667 $
66,667 $
$ 4,327,496 $ 5,127,806 9.330 124,400
AVERAGE CAPITAL COST PER NEW LUE - $
0.0. $ 1,984,034 $ 1,984,034
$ 1,984,034 $ 1,984,034
2006 $ 1,800,000 $ 1,909,820
$ 1,800,000 $ 1,909,620 1.250 10,000 $
$ 3,784,034 $ 3,893,654 11.120 88,960
AVERAGE CAPITAL COST PER NEW LUE - $
TRANSMISSION
EXISTING FACILITIES
Existing Transmission
Subtotal Existing Facilities
FUTURE FACILITIES
East Line Phase 3a
Kenningston Park
Round Rock West System adrift. capacity
East Line Phase 3b - 36' 8 16'112' PRV
HEC Campus - 16'/17/12" PRV
CR112 Extension - 16"/12" PRV
Forrest Creek - 12"
Meadow Lake/The Settlement - 12"
Hwy 79- 12'
Double Creek - 18"112"
South Arterial A - 16'
South Creek 12'
East Line Phase 4
South Loop Phase 1 - 36'/16" PRV
CR112 - 30"124"112' PRV
Parcel 1113 - 16"112'
FM1460 20'/16"/24" PRV w/36" stub
Parcel 3803 - 16"
Parcel 662 - 16'
Parcel 138 - 16"/12'
Sam Bass - 24'
Misc. Transmission
mg
57 5,185 61,481 66,667
57 5,185 61,481 66,667
31,245 15,986 77,170 124,400
34
9870 78,960 $ 25 31,245 11,191 36,525 78,960
9.870
1.250
78,960 $
10,000 $
25
191
31,245
11,191
n . $ 32,184,675 $ 32,184,675
$ 32,184,675 $ 32,184,675
2005 $ 1,546,550 $ 1,592,947
2005 $ 441,000 $ 454,230
2006 $ 3,600,000 $ 3,600,000
2008 $ 5,343,000 $ 5,668,389
2006 $ 840,500 $ 891,686
2006 $ 912,000 $ 967,541
2008 $ 88,000 $ 93,359
2007 $ 808,000 $ 882,923
2008 $ 120,000 $ 135,061
2008 $ 1,493,500 $ 1,680,947
2008 8 525,000 $ 590,892
2008 $ 392,000 $ 441,199
2009 $ 1,800,000 $ 2,086,693
2010 8 3,495,000 $ 4,173,213
2011 $ 975,000 $ 1,199,127
2011 $ 1,087,000 $ 1,336,873
2011 $ 616,750 $ 758,525
2011 $ 294,000 $ 361,583
2012 $ 588,000 $ 744,861
2013 $ 758,500 $ 989,870
2013 $ 560,000 $ 730,673
2009 $ 3,000,000 $ 3,477,822
mgd
45.000
45.000
191
75
29,032 $ 1,109
29,032 8 1,109
31,245
29,032
4,796
4,796
5,987
36,525
5,204
5,204
41,729
78,960
10,000
10,000
88,980
29,032
29,032
29,032
Subtotal Future Facilities
$ 29,283,800 $ 32,858,215
30.000
19,355 $ 1,698
2,212
15,987
1,158
19,355
TOTAL TRANSMISSION
AVERAGE COST PER NEW LUE
$ 61,468,475 $ 65,042,890
75.000
48,387
1,898
31,245
15,987
1,156
48,387
WATER TOTAL $ 209,434,002 $ 215,605,557
AVERAGE CAPITAL COST PER NEW LUE - $ 4,388
• Assumes avg. annual inflation rate of: 3.014
"' The sum of existing customer LUE demand and 10 -yr growth LUE demand equals the total demand shown in Table 3 for the year 2013.
The existing supply capacity shown here equals the existing wafer supply shown in Table 3.
Update of Water/Wastewater Impact Fees
of the City of Round Rock, Texas 9
ha 1
Update of Water Impact Fees
TABLE 6
WASTEWATER CIP INVENTORY AND COSTING
CITY OF ROUND ROCK
Facility Name
Facility Capacity Allocations (LUES)
Date of Cost Capacity Cost Existing Growth Use In Excess Total
Need Original $ Installed $' Total LUES per LUE Customers Next 10 Years Capacity Capacity
TREATMENT
EXISTING FACILITIES
Existing WWTPs
Subtotal Existing Facilities
FUTURE FACILITIES
E. Regional WWTP Expansion
Subtotal Future Facilties
n a.
$ 36,530,333 $ 36,530,333
$ 36,530,333 $ 36,530,333
mgd
9.600 25,737 $ 1,419 25,737
9.600 25,737 $ 1,419 25,737
25,737
25,737
2006 $ 32,651,020 $ 32,651,020 7.500 20,107 $ 1,624 3,411 15,853 843 20,107
$ 32,651,020 $ 32,651,020 7.500 20107 $ 1,624 3,411 15,853 843 20107
TOTAL WASTEWATER TREATMENT
$ 69,181,353 $ 69,181,353 17.100 45,845 29,149 15,853 843 45,845
AVERAGE CAPITAL COST PER NEW LUE _ $ 1,624
PUMPING
EXISTING FACILITIES mgd
Existing LS n.a. $ 1,213,596 $ 1,213,596 19.900 18,477 $ 66 18,477
Subtotal Existing Facilities $ 1,213,596 $ 1,213,596 19.900 18,477 $ 66 18,477
FUTURE FACILITIES
Oak Bluffs LS Rehab (growth portion) 2006 $ 6,780 $ 7,193 0.017 16 $ 448 11 5 16
The Shops LS Rehab (growth portion) 2006 $ 5,668 $ 6,013 0.014 13 $ 450 9 4 13
Forest Creek LS Rehab (growth portion) 2006 $ 91,584 $ 97,161 0229 213 $ 457 142 71 213
Trevino Court LS Rehab (growth portion) 2006 $ 21,984 $ 23,323 0.055 51 $ 459 34 17 51
Subtotal Future Facilities 126 016 $ 133 690 0.315 293 $ 457 - 195 98 293
TOTAL PUMPING $ 1,339,612 $ 1,347,286 20.215 18,770 18,477 195 98 18,770
18,477
18,477
INTERCEPTORS
EXISTING FACILITIES
Existing Interceptors
Subtotal Existing Facilities
FUTURE FACILITIES
®"' Avery Farms
Brushy Creek Tunnel
Chandler Creek
McNutt Basin
Misc. Interceptors
AVERAGE CAPITAL COST PER NEW LUE _ $
n.a. $ 10,498,161 $ 10,498,161
$ 10,498,161 $ 10,498,161
2004 $ 2,104,973 $ 2,104,973
$ 11,100,414 $ 11,100,414
2009 $ 1,932,500 $ 2,240,297
2009 $ 8,079,750 $ 9,366,645
2007 $ 3,000,000 $ 3,278,181
mgd
84.000
84.000
15.300
6
77,994 $ 135 29,149 6,341 42,505
77,994 $ 135 29,149 6,341 42,505
14,206 $ 659
77,994
77,994
Subtotal Future Facilities
$ 26,217,637 $ 28,090,510 33.900 31,476 $ 892
9,512
21,965 31,476
TOTAL INTERCEPTORS
AVERAGE COST PER NEW LUE
$ 36,715,798 $ 38,588,670 117.900 109,471 29,149 15,853 64,469 109,471
AVERAGE CAPITAL COST PER NEW LUE _ $ 589
WASTEWATER TOTAL $ 107,236,763 $ 109,117,310
AVERAGE CAPITAL COST PER NEW LUE _ $ 2,221
• Assumes avg. annual inflation rate of. 3.0%
Update of Water/Wastewater Impact Fees
of the City of Round Rock, Texas 10
Update of Water Impact Fees
6.0 CONSIDERATION OF OTHER METHODS OF CAPITAL PAYMENT
For utilities that charge an impact
fee, the new customer generally
pays for capital in two ways: (1)
initially through the up -front impact
fee, and (2) over the longer-term
through utility rate payments,
where typically some portion of
customer rate payments also
funds capital projects.
The recent 77th Texas Legislature
amended Chapter 395 of the Local
Government to require either: (1) a
calculated credit for rate payments
be reflected in the fee amount, or
(2) a credit equal to 50 percent of
the total projected cost of the
._ capital improvements plan be
given in calculating the maximum
fee amount.
Table 7 indicates the estimated
cost per LUE that is projected to
be borne in the utility rates by the
average new customer. The rate
credit calculation considered: (a)
existing capital obligation to
wholesale providers, (b) existing
debt (c) future debt payments
incurred in the year in which the
facilities would be built and
financed, and (d) the projected
LUEs at the mid -point year of 2008.
TABLE 7
EXISTING OR ANTICIPATED DEBT TO BE PAID THROUGH UTILITY RATES
CITY OF ROUND ROCK
Facility Type
Est. Debt
in Rates
2008 Est. Debt in
LUEs Rates per LUE
WATER UTILITY
Supply
Existing Debt
Series 2004-2013 New Growth
Subtotal Water Supply
Treatment
Existing Debt
Series 2004-2013
Subtotal Water Treatment
Pumping
Existing Debt
Series 2004-2013
Subtotal Pumping
$ 411,339 38,350 $ 11
$ 79,532 38,350 $ 2
$ 490,871 $ 13
$ 1,109,565 38,350 $ 29
$ 572,058 38,350 $ 15
$ 1,681,623 $ 44
$ 103,604 38,350 $ 3
$ 103,604 $ 3
Subtotal Water Pumping
Ground Storage
Existing Debt
Series 2004-2013
$ 21,121
38,350 $ 1
Subtotal Water Storage
Elevated Storage
Existing Debt
Series 2004-2013
$ 47,937
38,350 $ 1
Subtotal Water Storage
Transmission
Series 2004-2013
Subtotal Transmission Lines
$ 47,937
$ 593,766
$ 593,766
38,350 $ 15
$ 15
Total Water
WASTEWATER UTILITY
Treatment
Existing Debt
Series 2004-2013
Subtotal WWTP
Pumping
Existing Debt
Series 2004-2013
Subtotal WWTP
Interceptors
Existing Debt
Series 2004-2013
Subtotal Interceptors
$ 25,536,844
$ 3,465,118
$ 29,001,962
$ 11,182
$ 11,182
$ 3,174,544
$ 3,075,342
$ 6,249,886
38,350 $
38,350 $
38,350 $
77
666
90
756
0.29
38,350 $
38,350 $
0.29
83
80
163
Total Wastewater
$ 920
Total Water and Wastewater
996
Update of Water/Wastewater Impact Fees
of the City of Round Rock, Texas 11
ha I
Update of Water Impact Fees
7.0 ALTERNATIVE IMPACT FEE CALCULATIONS
Table 9 summarizes the unit capital cost of providing new service and the two alternative credit
calculations for new customers. The alternative approach that calculates a specific rate credit
(Option A) results in the maximum impact fee calculation of $4,296 per LUE for water and
$1,306 per LUE for wastewater, totaling $5,602 per LUE.
As can be seen, the alternative 50% of capital cost method for calculating a rate credit (Option
B) results in a lesser water impact fee of $2,184 per LUE and wastewater fee of $1,115 per
LUE, yielding an overall $3,303 per LUE.
TABLE 8
DERIVATION OF ALTERNATIVE MAXIMUM WATER AND WASTEWATER IMPACT FEE AMOUNTS
CITY OF ROUND ROCK
ITEM
Weighted Optional Adjustments
Capital Cost of - Option A - - Option B -
New Service Rate 50% Cost Highest of
per LUE Credit Adjustment - Option A - - Option B - Option A or B
WATER
Supply $ 616 $ 13 $ 308 $ 603 $ 308 $ 603
Treatment $ 1,691 $ 44 $ 845 $ 1,647 $ 845 $ 1,647
Pumping $ 255 $ 3 $ 127 $ 252 $ 127 $ 252
Ground Storage $ 34 $ 1 $ 17 $ 33 $ 17 $ 33
—
Elevated Storage $ 75 $ 1 $ 37 $ 74 $ 37 $ 74
Transmission $ 1,698 $ 15 $ 849 $ 1,682 $ 849 $ 1,682
Allocated Impact Fee Study Cost $ 4 $ 4 $ 4 $ 4
Total Water $ 4,372 $ 77 $ 2,184 $ 4,296 $ 2,188 $ 4,296
WASTEWATER
Treatment $ 1,624 $ 756 $ 812 $ 868 $ 812 $ 868
Pumping $ 8$ 0$ 4$ 8$ 4$ 8
Interceptors $ 589 $ 163 $ 295 $ 426 $ 295 $ 426
Allocated Impact Fee Study Cost $ 4 $ 4 $ 4 $ 4
Total Wastewater $ 2,225 $ 920 $ 1,111 $ 1,306 $ 1,115 $ 1,306
TOTAL WATERNVASTEWATER
$ 6,598 $ 996 $ 3,295 $ 5,602 $ 3,303 $ 5,602
The fee methodology was replicated for each major facility type in the utility system (ex. Supply,
treatment, pumping, elevated storage, ground storage and transmission) so that the total fee
amount is the sum of the component facility fees. This provides a basis for extending the fee to
wholesale customers of the City or granting fee offsets if a developer cost -participates with the
City on CIP projects.
Update of Water/Wastewater Impact Fees
of the City of Round Rock, Texas 12
Update of Water Impact Fees
For comparison purposes, the current impact fees of other near -by cities are listed below:
City Water Wastewater Total
Austin
N.E. Preferred Development Zone $ 700 $ 400 $1,100
Western city $1,500 $1,200 $2,700
Pflugerville $2,491 $1,362 $3,853
Round Rock (current) $2,910 $1,059 $3,969
Georgetown $2,295 $1,869 $4,164
Buda $2,721 $1,514 $4,234
Cedar Park $2,250 $2,000 $4,250
Leander $2,850 $1,550 $4,400
San Marcos $2,466 $2,185 $4,651
Jonah SUD (water only) $4,125 n.a. --
Round Rock (maximum potential) $4,296 $1,306 $5,602
Chisholm Trail SUD (water only) $4,600 n.a. --
Update of Water/Wastewater Impact Fees
of the City of Round Rock, Texas 13
Update of Water Impact Fees
Attachment A
Location of Proposed Improvements
Identified in the
10 -Year Water and Wastewater CIPs
Update of Water/Wastewater Impact Fees
of the City of Round Rock, Texas 14
3
Update of Water Impact Fees
CITY OF ROUND ROCK
WATER DISTRIBUTION SYSTEM
Location of Proposed Water Improvements Between 2004-2013
Update of Water/Wastewater Impact Fees
of the City of Round Rock, Texas 15
a
Update of Water Impact Fees
Existing Manholes
Existing Pipes
Litt Stations
2013 New Manholes
2013 New Pipes
■ 2013 Lift Station Upgrad
Name
• East WWTP
• West VJWTP
yfie4hons
Location of Proposed Wastewater Improvements Between 2004-2013
Update of Water/Wastewater Impact Fees