G-04-10-26-14A1 - 10/26/2004ORDINANCE NO. @OL/JOD -lqR I AN ORDINANCE AMENDING CHAPTER 10, SECTION 10.204, CODE OF ORDINANCES (1995 EDITION), CITY OF ROUND ROCK, TEXAS, BY AMENDING THE WATER AND WASTEWATER IMPACT FEES, AND ADOPTING NEW LAND USE ASSUMPTIONS AND CAPITAL IMPROVEMENT PLAN; PROVIDING FOR A SAVINGS CLAUSE AND REPEALING CONFLICTING ORDINANCES OR RESOLUTIONS. WHEREAS, Sec. 395.052, Tex. Local Gov't Code, requires a municipality imposing impact fees to review and evaluate its current land use assumptions and capital improvements plan at least every five (5) years (dating from the day the initial capital improvements plan is adopted); and WHEREAS, the last time such land use assumptions and capital improvements plan were review, evaluated and updated was two (2) years ago; and WHEREAS, the City Council has reviewed, evaluated, and now wishes to adopt updated land use assumptions and a capital improvements plan in order to comply with said Texas Local Government Code requirements for same; Now Therefore BE IT ORDAINED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, THAT: I. That Chapter 10, Section 10.204, Code of Ordinances (1995 Edition), City of Round Rock is hereby amended in its entirety and shall read as follows: @PFDesktop\::ODMA/WORLDOX/O:/WDOX/ORDINANC/041014A1.WPD/bbw 10.204. WATER AND WASTEWATER IMPACT FEES (1) General Provisions (a) Purpose. This section is intended to assure the provision of adequate public facilities to serve new development in the City by requiring each development to pay its pro rata share of the costs of improvements necessitated by and attributable to such new development. Impact fees established by this section are additional and supplemental to, and not in substitution of any other requirements imposed by the City on the development of land or the issuance of building permits or certificates of occupancy. Such fee is intended to be consistent with and to further the policies of the City's Comprehensive Plan, the Capital Improvement Plan, the zoning ordinance, subdivision regulations and other City policies, resolutions and ordinances by which the City seeks to provide adequate public facilities in conjunction with the development of land. (b) Applicability. This section shall be applicable uniformly to new development that occurs within the water and wastewater service area. For new development that occurs within the boundaries of the city's wholesale customers or other political subdivisions, the applicability and terms for the assessment and collection of the impact fee shall be defined by agreement. (c) Authority. This section is adopted pursuant to V.T.C.A., Texas Local Government Code ch. 395, the constitution and laws of the state, and the Round Rock Charter. The provisions of this section shall not be construed to limit the power of the city to adopt an impact fee pursuant to any other source of local authority nor to limit the utilization of any other methods or powers otherwise available for accomplishing the purposes set forth herein. (d) Development Approval. No application for new development shall be approved by the City without assessment of an impact fee pursuant to this section, and no water and wastewater tap shall be connected unless the impact fees assessed by this section have been paid. (e) Definitions. In addition to the terms defined in the Texas Local Government Code, Section 395.001, the following terms, as used in this section, shall have the meanings ascribed to them herein below: "Act" means V.T.C.A., Local Government Code Section 395.001 et seq. "Assessment" shall have the meaning set forth in subsection 395.016(1) of the Act. "Director" means the Chief of Public Works Operations or his designee. "Living Unit Equivalent "(LUE) is the standardized measure referred to in the definition of service unit in the Act and in this section. LUE consumes 450 gallons per day of water and produces 350 gallons per day of wastewater. 2 "Wastewater facility" means a capital improvement or facility expansion for providing wastewater service including but not limited to land or easements, treatment facilities, lift stations, and interceptor mains. The term does not include wastewater lines or mains which are constructed by developers, the costs of which are reimbursed from charges paid by subsequent users of facilities and which are maintained in dedicated trusts. The term "wastewater facilities" also does not include dedication of easement or rights-of-way or easements or construction or dedication of on-site wastewater collection facilities required by valid ordinances of the City and necessitated by and attributable to new development. "Water facility" means improvements for providing water service including but not limited to land or easements, water supply facilities, treatment facilities, pumping facilities, storage facilities or transmission mains. The term does not include water lines or mains constructed by developers, the costs of which are reimbursed from charges paid by subsequent users of the facilities maintained in dedicated trusts. The term does not include dedication of rights-of-way or easements or construction or dedication of on-site water distribution facilities required by valid ordinances of the City and necessitated by and attributable to new development. (2) Land Use Assumptions. (a) The updated Land Use Assumptions for the City dated W-24- Oil , are hereby adopted and incorporated by reference and shall be kept of record in the office of the City Secretary. (b) Said Land Use Assumptions for the City shall be updated at least every five (5) years utilizing the amendment procedure set forth in the Act. (c) Amendment to the Land Use Assumptions shall incorporate projections of changes in land uses, densities, intensities and population for the service area over at least a ten-year period. (3) Water and Wastewater Impact Fee Service Area (a) Water and Wastewater Impact Fee Service Area, the boundaries of which are depicted on the map dated Jo. 20 - 0 9 , have been approved by the City Council and a map showing such service areas shall be kept of record in the office of the City Secretary. (b) The boundaries of the Water and Wastewater Impact Fee Service Area may be amended from time to time in accordance with the procedures set forth in the Act. (4) Impact Fee Capital Improvements Plan For Water And Wastewater Facilities (a) The Impact Fee Capital Improvements Plan For Water and Wastewater Facilities dated 10-24- 04 , is adopted and incorporated in this section by reference and shall be kept on record in the office of the City Secretary. 3 (b) The Impact Fee Capital Improvements Plan For Water and Wastewater Facilities may be amended from time to time pursuant to the procedures set forth in the Act. (5) Determination Of Service Units (a) Conversion Table. The number of service units for both water and wastewater service is determined by the size and type of the water meter purchased for the property in accordance with the following schedule: Meter Size (Inch) Service Units 5/8 X 3/4 1.00 3/4 1.5 1 2.5 1.5 5.0 2 8.0 3 16.0 4 25.0 6 50.0 8 80.0 10 115.0 (b) Calculation. Service units shall be calculated based upon the size of the water meter as set out above. (c) No Water Meter. Upon application for a building permit for lots for which no water meter has been purchased, wastewater service units shall be determined by a professional engineer licensed in the State of Texas subject to the approval of the Director. (d) Nonstandard Meter. No adjustment in service units shall be made for water use or fire demand that falls between standard meter sizes or combinations. (e) Revision of Service Units Designation. The City may revise the service units designation in accordance with the procedures set forth in the Act. (6) Impact Fees Per Service Unit (a) Maximum Allowable Fee. The maximum impact fee per service unit shall be computed by dividing the cost of water and wastewater capital improvements and facilities expansions necessitated by and attributable to new development identified in the impact fee capital improvements plan for each category of capital improvements by the total number of projected service units in the impact fee service area based upon the land use assumptions, and then may be adjusted to reflect a credit, as appropriate, for other non -fee methods of capital payments referenced in Section 395.014(7), Texas Local Government Code. Maximum impact fees per service unit shall be established for each category of capital 4 (b) improvements and are on record in the office of the City Secretary, and incorporated in this section by reference. Beginning on JAN. I 2005" , the City shall assess and collect per service unit to be served by the City's water system a Water Impact Fee of Four Thousand Two Hundred Ninety-six Dollars ($4,296.00). (c) Beginning on JAN. 1) 2 05 , the City shall assess and collect per service unit to be served by the City's wastewater system a Wastewater Impact Fee of One Thousand Three Hundred Six Dollars ($1,306.00). (7) Assessment Of Impact Fees (a) The City shall assess the impact fees per service unit in affect at the time of plat recordation of a subdivision plat or other plat under Subchapter A, Chapter 212, or the City's subdivision ordinance. (b) Except as provided in section 395.019 of the Act, the City shall collect the fees as follows: (1) At the time the political subdivision issues a building permit; or (2) For land platted outside the corporate boundaries of the City, the City shall collect the impact fees at the time an application for an individual meter connection to the City's water or wastewater system is filed. (c) For land on which new development occurs or is proposed to occur without platting, the City may assess the impact fees at any time during the development and building process and may collect the fees at either the time of recordation of the subdivision plat or connection to the City's water or wastewater system or at the time the City issues either the building permit or the certificate of occupancy. (d) Following assessment of the impact fee hereunder, the amount of the impact fee per service unit may not be increased above the assessed fee unless the owner obtains final approval for replatting in which case a new assessment shall occur at the assessed water and wastewater impact fee per service unit in effect at the time of such replatting. (e) An application for an amended plat made pursuant to Texas Local Government Code Section 212.016 or the City's subdivision rules is not subject to a reassessment of the impact fee. (8) Calculation Of Impact Fees (a) The water and wastewater impact fees shall be based on the size of the water meter determined by the Director to be necessary to serve the development and the number of service units associated with that size of water meter. If the City allows a development to connect to the wastewater system without connecting to the water system, the Director shall determine the size of the water meter that would be required if the development did connect to the water system. The 5 (b) number of service units associated with the various sizes of water meter are set forth herein in Section (5), Determination of Service Units. A property owner may submit, or the Director may require the submission of a study, prepared by a professional engineer, licensed in the State, clearly indicating the number of water and/or wastewater service units which will be consumed or generated by the new development. The Director will review the information for completeness and conformity with generally accepted engineering practices and may, when satisfied with the completeness and conformity of the study, modify the total number of service units required for the new development. (c) Total service units shall be multiplied by the impact fee per service unit for water or wastewater service as depicted in Section (6), Impact Fee Per Service Unit or as determined in subsection (b) above. (d) All applicable offsets, credits or discounts per service unit allowable under this section for water or wastewater service shall be subtracted from the product derived under subsection (c) of this section. (e) The amount of impact fee due for new development shall not exceed the amount computed by multiplying the assessed fee for water or wastewater service by the total number of service units generated by the development. (0 Whenever the property owner increases the number of service units for a development, the additional impact fees collected for such new service units shall be determined based on the assessed fee and applicable offsets, credits and discounts then in effect and such additional fee shall be collected at the time the additional meters are purchased. (g) For the purpose of determining water impact fees, no additional service units are attributable to the addition of a separate irrigation meter if the irrigation meter is the same size as or smaller than the existing meter. If a larger irrigation meter is installed, the water impact fee shall be the difference between that of the existing meter and that of the irrigation meter. (h) In determining the number of service units for wastewater impact fees, no service units will be attributed to irrigation meters. (i) Payment of an impact fee in accordance with the terms and conditions of this section shall entitle the payor to receive a credit for same to be used in the event the tap for the property for which the fee is paid expires and must be repurchased; provided, however, that the impact fee is not refundable upon expiration of the tap. (j) If the tap or building permit for the property on which an impact fee is paid has expired and a new application is thereafter filed for the identical property and the same number of service units, the impact fee previously paid satisfies the requirements of this section. (k) The impact fee shall attach to the property for which the impact fee was paid and shall not be transferable to other properties or service units. (1) No request to connect to the water and wastewater system shall be granted and no building permit shall be issued if the applicant cannot verify payment of the appropriate impact fee and other applicable fees or if existing facilities do not have actual capacity to provide service to the new connection(s). (9) Credits If the City requires, as a condition of development approval, or otherwise enters into an agreement with a developer, to have the developer construct, fund or otherwise contribute toward the cost of a capital improvement or facility expansion included in the adopted water or wastewater capital improvements plan, the City shall provide for reimbursement in the form of credits against impact fees that would otherwise be due from the development. Such credits shall run with the land and shall be used to reduce the amount of the impact fee that would otherwise be owed at the time of collection of impact fees. If the amount of such credits would be insufficient to reimburse the developer for the cost of required improvements, the City shall provide for reimbursement to the developer up to the balance of the cost of the required improvements from water or wastewater impact fees collected from other new development within the same service area. In determining the amount of such credits, the developer shall submit evidence of the actual, fair -market cost of the required improvement. Such credits shall only be applicable against the impact fees for the type of facility (water or wastewater) for which the capital improvement is made. (10) Exceptions And Exemptions (a) Limitation on Modification. Except as provided in this section or by contract in existence on the effective date of the ordinance codified in this section, any reduction, change or modification in the amount or time of payment of the impact fee must be approved by a duly enacted ordinance of the City Council. (b) Fire Protection Capacity. No fee shall be collected for the purchase of a tap that is utilized to provide only fire protection capacity. (c) Nothing hereinabove stated shall be construed to alter the terms of a contract with a wholesale customer of the City regarding the payment of impact fees and shall not be construed to authorize the payment of impact fees in installments in areas encompassed by such a contract for wholesale service. (d) Exchange. A tap may be exchanged before any water or wastewater service has been received for another tap without collection of the impact fees established in this section if the exchange will result in an equivalent or lesser number of service units to be utilized on the property for which the tap was originally purchased. The number of service units to be exchanged shall be determined in accordance with Section 5 and shall not be based on the number of units at the time of initial purchase. 7 (e) Waiver. By majority vote of the City Council, a resolution or ordinance may be adopted waiving or reducing the impact fees for a certain class of development, or for a specific development if there is a finding that the proposed waiver or reduction would result in substantial economic benefit to the City. (11) Accounting For Fees And Interest (a) All water and wastewater impact fees collected by the City shall be deposited in interest bearing accounts clearly identifying the category of capital improvements for which the fees were collected. (b) Interest earned by each account shall be credited to the account on which it is earned and shall be used solely for the purposes specified for impact fees as authorized hereinbelow. (c) The City shall establish adequate financial and accounting controls to ensure that impact fees disbursed from the account are utilized solely for the purposes authorized in this section. Disbursement of funds shall be authorized by the City at such times as are reasonably necessary to carry out the purposes and intent of this section; provided, however, that any fee paid shall be expended within a reasonable period of time, but not to exceed ten years from the date the fee is deposited into the account. (d) The City shall maintain and keep adequate financial records for each such account, which shall show the source and disbursement of all revenues, which shall account for all moneys received, the number of service units for which the moneys are received, and which shall ensure that the disbursement of funds from each account shall be used solely and exclusively for the provision of projects specified in the impact fee capital improvements plan as system -related capital projects. The City shall also maintain such records as are necessary to ensure that refunds are appropriately made in accordance with this section. (12) Use Of Proceeds Of Impact Fee Accounts (a) Water and wastewater impact fees shall only be used to pay the costs of constructing water and wastewater capital improvements or facility expansions, including and limited to the following: (1) Construction contract price; (2) Subject to the provisions of subsection 395.012(b) of the Act, interest charges, including projected interest charges, or other finance costs; (3) Surveying and engineering fees; (4) Land acquisition costs, including land purchases, court awards and costs, attorney's fees and expert witness fees; and (5) Fees actually paid or contracted to be paid to an independent qualified engineer or financial consultant preparing or updating the capital improvements plan who is not an employee of the City. (b) Impact fees collected pursuant to this section shall not be used to pay for any of the items set forth in Section 395.013 of the Act. 8 (13) Refunds All or any portion of a water or wastewater impact fee payment that has been collected by the City and has not been spent as authorized by this Section within ten (10) years from the date such impact fee was collected shall be refunded pursuant to the provisions set forth in Section 395.025 of the Act. (14) Updates To Plan And Revisions Of Fees The City shall review the land use assumptions and impact fee capital improvements plan for water and wastewater facilities at least every five (5) years, with the five-year period to commence from the date of adoption of the impact fee capital improvements plan referenced in this section. The City Council shall accordingly make a determination of whether changes to the land use assumptions, impact fee capital improvements plan or impact fees are needed and shall, in accordance with the procedures set forth in the Act, or any successor statute, either update the fees or make a determination that no update is necessary. II. A. All ordinances, parts of ordinances, or resolutions in conflict herewith are expressly repealed. B. The invalidity of any section or provision of this ordinance shall not invalidate other sections or provisions thereof. C. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Ordinance was adopted was posted and that such meeting was open to the public as required by law at all times during which this Ordinance and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. READ and APPROVED on first reading this the //l- day of at&viau , 2004. 9 READ, APPROVED and ADOPTED on second reading this the o -P day of (001/0 , 2004 ATTEST: atuyLi) Mayor f Round Rock, Texas CHRISTINE R. MARTINEZ, City Secretar 10 DATE: October 21, 2004 SUBJECT: City Council Meeting - October 26, 2004 ITEM: 14.A.1. Consider an ordinance amending Chapter 10, Section 10.204, Code of Ordinances, amending the Water and Wastewater Impact Fees, and Adopting New Land Use Assumptions and Capital Improvements Plan. (Second Reading) Department: Water and Wastewater Utilities Staff Person: Tom Clark, Director of Utilities Justification: Water and wastewater impact fees are charged to offset the cost of constructing infrastructure to keep up with development and allow for growth to pay for itself rather than being paid for by ratepayers. Funding: Cost: N/A Source of funds: N/A Outside Resources: Tony Bagwell, HDR Engineering Background Information: At least every five years, the City's land use assumptions, capital improvement plan and water and wastewater impact fees are reviewed for possible amendment to reflect the cost of constructing infrastructure within the City. Impact fees assist the City in paying for the infrastructure needed by development rather than being subsidized by ratepayers. Current fees are $2,910 for water and $1,059 for wastewater per LUE. Over the last 18 months, the land use projections and the Water and Wastewater Master Plans have been reviewed and updated, and maximum potential impact fees have been calculated. A report detailing such updates and advising the City of such maximum potential fees is presented for consideration by the City Council and an Advisory Committee comprised of the Planning and Zoning Commission, a member from Williamson County and a non-voting member of the Home Builders Association of Austin. The Advisory Committee met on July 7, July 27, August 4, and August 11, 2004 to review the impact fees and make written comments to the Council. Public Comment: The Public will be asked to comment at the October 14, 2004 Public Hearing. STATE OF TEXAS COUNTY OF WILLIAMSON The attached 2004 Update of the Water and Wastewater Impact Fees of the City of Round Rock has been submitted to the City Council of the City of Round Rock, Texas, at its meetings held on October 14, 2004 and October 26, 2004, and is considered and adopted as containing the Land Use Assumptions and the Impact Fee Capital Improvements Plan for Water and Wastewater Facilities for the City under Ordinance No. 0-oLi-io-z-A041. CITY OF ROUND ROCK, TEXAS ATTEST: Christine Martinez, City Secretary 2004 UPDATE OF THE WATER AND WASTEWATER IMPACT FEES OF THE CITY OF ROUND ROCK Prepared by: HDR Engineering, Inc. 2211 S. IH -35, Suite 300 Austin, Texas 78746 August 2004 CERTIFICATION The water and wastewater impact fee calculations made in this report for the City of Round Rock were developed from land use, utility facility and financial data provided by City staff and capital improvements program information contained in the separate 2004 Water and Wastewater Master Plan reports prepared by HDR Engineering, Inc. and CDM, respectively. 76. ony Bagwell Project Manager, Impact Fee Study HDR Engineering, Inc. James K. Haney, P. Project Manager, Water Distribution Master Plan Study HDR Engineering, Inc. /(1/ e.c LEN D °o �sw. • /1111/HOAOroc .,1.0,,^. +�k=�- 54386 n Allen D. Woelke, P.E. 54386 n ' ' : 1t lie 4- Project Manager, Wastewatk altar Tai Ludy CDM *74;:w:' 1010.1 2004 UPDATE OF THE WATER AND WASTEWATER IMPACT FEES OF THE CITY OF ROUND ROCK Table of Contents Section Page 1.0 INTRODUCTION AND SUMMARY 1 2.0 UTILITY SERVICE AND FEE APPLICATION AREA 2 3.0 LAND USE ASSUMPTIONS 3 4.0 CURRENT AND PROJECTED UTILITY DEMAND AND SUPPLY 4 5.0 IDENTIFIED MAJOR CAPITAL IMPROVEMENT NEEDS AND COSTS 8 6.0 CONSIDERATION OF OTHER METHODS OF CAPITAL PAYMENT 11 7.0 ALTERNATIVE IMPACT FEE CALCULATIONS 12 Attachment A — Location of Proposed Improvements Identified in the Water CIP 14 ii Update of Water Impact Fees 2004 UPDATE OF THE WATER AND WASTEWATER IMPACT FEES OF THE CITY OF ROUND ROCK 1.0 INTRODUCTION AND SUMMARY The City of Round Rock is in the process of updating its water and wastewater impact fees to keep the fee current with newly -acquired service area and updated CIP information. This report presents HDR Engineering, Inc.'s maximum impact fee determination for consideration by the City's Impact Fee Advisory Committee and the Round Rock City Council. Consistent with State law, the methodology that determines the maximum fee amount considers for each fee component either: (1) consideration of a credit for other methods of payments for utility capital by a new customer, such as through utility rates or taxes, or alternatively (2) a reduction of maximum fee amount equal to 50 percent of the unit capital cost of providing new service. By maximum amounts, this means that the determined fee amount was calculated as the highest that can be lawfully levied by the City, given the prospective land uses and capital improvements plan, the cost of existing and new utility capacity, and consideration of a credit to new customers for capital contributions made through rate payments. The City Council can decide to enact fees less than the maximum amounts shown in this report. As detailed later in this report, the maximum impact fees were developed in component pieces. For instance, the overall water fee is comprised of separate amounts for water supply, treatment, pumping, elevated storage, ground storage, and transmission. This will facilitate the consideration of offsets or credits from the applicable fee if a developer builds and dedicates eligible facilities to the City or the City provides wholesale service to a neighboring utility and wishes to charge only certain portions of the fee. The maximum fee amounts do not include capital costs for any donated facilities provided by developers at their own expense. Planning, service demand, and design factors assumptions used in the water and wastewater facility sizing and costing were developed by HDR and CDM engineers, respectively. Data on current utility demand, existing utility assets, outstanding utility debt and prospective cash versus debt financing were obtained from or coordinated with the City of Round Rock staff. HDR combined these elements into the maximum impact fee calculations presented in this report. Update of Water/Wastewater Impact Fees of the City of Round Rock, Texas 1 RR Update of Water Impact Fees 2.0 UTILITY SERVICE AND FEE APPLICATION AREA The City's future ETJ was used as the primary basis for the impact fee service area of the City shown in Figure 1. This fee application area boundary will comprise the area in which Round Rock may levy the impact fees, in -part or in -full, if City service is provided. This boundary does not, however, imply a legal obligation of the City of Round Rock to serve beyond its incorporated limits. If the City does not provide service, in full or in -part, then the impact fees would not apply. CITY OF ROUND ROCK Water and Wastewater Impact Fee Application Boundary Figure 1 Water and Wastewater Impact Fees Application Area Update of Water/Wastewater Impact Fees of the City of Round Rock, Texas 2 3 Update of Water Impact Fees 3.0 LAND USE ASSUMPTIONS Table 1 provides an estimate of the current and future land use patterns of the potential service area with information obtained from the City of Round Rock. As indicated, about 72% of total City area is currently in residential land uses with 18% in commercial/industrial land uses and 9% in various open space or floodplain land uses. TABLE 1 CURRENT AND PROJECTED LAND USE CITY OF ROUND ROCK Current Future (including ETJ) ITEM Acres % Acres Residential 27,645 72% 31,854 70% Commercial/Industrial 6,980 18% 8,490 19% Public Facility 425 1% 945 2% Subtotal Developed 35,050 91% 41,289 90% Open Space 3,464 9% 4,522 10% Total Land Use Acreage 38,514 100% 45,811 100% Source: City of Round Rock, 2004. Does not include acres for mining. Assume 2013 water use rates at 90 % buildout of: 1,800 gals per new residential acre. 2,850 gals per new commercial acre. 1,300 gals per new public acre. Over time as the City grows into its future ETJ and utility service area, developed land areas will both increase and become a higher percentage of overall land uses. Projected residential land uses are expected to decease slightly to 70% of total potential service land area with non- residential and open space/floodplain shares of total land use growing slightly to 19% and 10% of total land area, respectively. The current 2004 water service area population is estimated at about 96,093 persons. A projected water service area population of about 145,260 persons is anticipated by the end of 2013, reflecting an anticipated 10 -year growth of about 51%. Update of Water/Wastewater Impact Fees of the City of Round Rock, Texas 3 Update of Water Impact Fees 4.0 CURRENT AND PROJECTED UTILITY DEMAND AND SUPPLY Table 2 relates the number of water and wastewater utility connections by water meter size and what is termed a Living Unit Equivalent (or LUE) conversion factor for meters of varying sizes. A typical single family residential house in Round Rock uses a 5/8" water meter and is considered to be one LUE. Based on American Water Works Association standards, the equivalent number of 5/8" meters can be determined for water meters of larger size. In this manner, meters of larger size (i.e. larger potential service demands) can be couched in terms the equivalent demand of a number of typical single family homes. For this reason, the LUE concept is a useful tool for being able to apply a base fee amount to service requests of varying meter sizes. TABLE 2 LUE EQUIVALENT CONVERSION FACTORS CITY OF ROUND ROCK Meter Size Living Units Number of Number of Equivalent (LUEs) Meters LUE's per Meter (a) in 2004 (b) in 2004 WATER 5/8" 1.0 23,418 23,418 3/4" 1.5 86 129 1" 2.5 311 778 1.5" 5.0 218 1,090 2" 8.0 313 2,504 3" 16.0 71 1,136 4" 25.0 32 800 6" 50.0 15 750 8" 80.0 8 640 10" 115.0 Total Water 24,472 31,245 WASTEWATER 5/8" 1.0 23,242 23,242 3/4" 1.5 71 107 1" 2.5 210 525 1.5" 5.0 165 825 2" 8.0 214 1,712 3" 16.0 58 928 4" 25.0 24 600 6" 50.0 13 650 8" 80.0 7 560 10" 115.0 - - Total Wastewater 24,004 29,149 (a) Derived from AWWA C700 -C703 standards for continuous rated flow performance scaled to 5/8" meter. (b) Source: City of Round Rock, meter count as of April 2004. Update of Water/Wastewater Impact Fees of the City of Round Rock, Texas 4 Update of Water Impact Fees Tables 3 and 4 summarize the City's current and projected water and wastewater service demands and existing supply (service) capabilities by facility. Current and future service demands are also compared with the existing service capacity of the utility systems. Water demand was forecast using population forecasts from the City Planning Department, meter count/LUE estimates from the City Utility Billing Section, and a dry -year per capita water use statistic used the Texas Water Development Board and the Regional Water Planning Group in their water supply planning efforts. Wastewater demand was forecast using historical data and technical studies of the City system. With the anticipated rapid growth of the City and surrounding area, potable water utility demand in certain service areas is expected to exceed the available capacity of raw and treated water supply, pumping, elevated and ground storage, and transmission during the planning period. Additional facilities need was also identified for wastewater treatment, pumping, and interceptors within the future10-year period. Update of Water/Wastewater Impact Fees of the City of Round Rock, Texas 5 Update of Water Impact Fees TABLE 3 EST. WATER SERVICE DEMAND & AVAILABLE CAPACITY CITY OF ROUND ROCK Facilty Type 2004 2013 Supply Existing 2004 Capacity (mgd) Est. Service Demand Excess (Deficiency) Existing 2004 Capacity (LUEs) * Est. Service Demand Excess (Deficiency) Treatment Existing 2004 Capacity (mgd) Est. Service Demand Excess (Deficiency) Existing 2004 Capacity (LUEs) * Est. Service Demand Excess (Deficiency) Pumping Existing 2004 Capacity (mgd) Est. Service Demand Excess (Deficiency) 20.188 20.188 19.507 29.488 0.681 (9.300) 32,335 32,335 31,245 47,231 1,090 (14,896) 52.500 52.500 39.014 58.976 13.486 (6.476) 42,045 42,045 31,245 47,231 10,801 (5,186) 106.000 106.000 48.429 73.208 57.571 32.792 Existing 2004 Capacity (LUEs) * 68,387 68,387 Est. Service Demand 31,245 47,231 Excess (Deficiency) 37,143 21,156 Ground Storage Existing 2004 Capacity (mg) 4.330 4.330 Est. Service Demand 2.343 3.542 Excess (Deficiency) 1.987 0.788 Existing 2004 Capacity (LUEs) * 57,733 57,733 Est. Service Demand 31,245 47,231 Excess (Deficiency) 26,489 10,502 Elevated Storage Existing 2004 Capacity (mg) 9.870 9.870 Est. Service Demand 3.906 5.904 Excess (Deficiency) 5.964 3.966 Existing 2004 Capacity (LUEs) * 78,960 78,960 Est. Service Demand 31,245 47,231 Excess (Deficiency) 47,716 31,729 Transmission Existing 2004 Capacity (mgd) Est. Service Demand Excess (Deficiency) Existing 2004 Capacity (LUEs) * Est. Service Demand Excess (Deficiency) 45.000 45.000 48.429 73.208 (3.429) (28.208) 29,032 29,032 31,245 47,231 (2,212) (18,199) * Assume LUE conversion factor of : 624 gpd/LUE for water supply 1,249 gpd/LUE for treatment 1,550 gpd/LUE for pumping 75 gals/LUE for ground storage 125 gals/LUE for elevated storage 1,550 gpd/LUE for transmission Update of Water/Wastewater Impact Fees of the City of Round Rock, Texas 6 Update of Water Impact Fees TABLE 4 EST. WASTEWATER SERVICE DEMAND & AVAILABLE CAPACITY CITY OF ROUND ROCK Facilty Type 2004 2013 Treatment Existing 2000 Capacity (mgd) Est. Service Demand Excess (Deficiency) Existing 2000 Capacity (LUEs) * Est. Service Demand Excess (Deficiency) Pumping Existing 2000 Capacity (mgd) Est. Service Demand** Excess (Deficiency) 9.600 10.872 (1.272) 25,737 29,149 (3,411) 19.900 22.603 (2.703) 9.600 16.786 (7.186) 25,737 45,001 (19,264) 19.900 15.509 4.391 Existing 2000 Capacity (LUEs)* 18,477 18,477 Est. Service Demand 20,987 14,400 Excess (Deficiency) (2,510) 4,077 Interceptors Existing 2000 Capacity (mgd) 84.000 84.000 Est. Service Demand 31.393 48.467 Excess (Deficiency) 52.607 35.533 Existing 2000 Capacity (LUEs) * 77,994 77,994 Est. Service Demand 29,149 45,001 Excess (Deficiency) 48,846 32,993 * Assume LUE conversion factor of : **Assumes 2004 2013 373 373 gpd/LUE for ww treatment 1,077 1,077 gpd/LUE for ww pumping 1,077 1,077 gpd/LUE for interceptors 72% 32% of ww demand pumped Update of Water/Wastewater Impact Fees of the City of Round Rock, Texas 7 rklealls Update of Water Impact Fees 5.0 INDENTIFIED MAJOR CAPITAL IMPROVEMENT NEEDS AND COSTS Given the projected growth in water and wastewater demands, existing capacity, and the modeling of additional infrastructure needs, various additional facilities have been identified to help meet the needs for the next ten years. In year 2004 dollars, the City's 10 -year capital need for new capacity totals about $100 million for water and $50 for wastewater. Maps of the proposed water and wastewater capital improvements to the City -owned utility systems can be found in Attachment A. The projected rapid growth of City has necessitated the need for major water supply and treatment projects. The City's near-term implementation of the Lake Stillhouse Hollow water supply will only last the City for a limited period of time. As shown in Table 5, some additional near-term improvements are still needed to make full use of the Stillhouse supply by 2010. It is then forecast that a new water supply from Lake Travis will be required at that time to meet the additional water demands during the remainder of the 10 -year planning period. Related water treatment plant, water storage, and pumping improvements are also identified associated with the new Lake Travis supply. The ultimate cost of the Lake Travis supply system will depend on several factors, including more advanced design estimates, whether the City assumes an equity role in the project and which facilities are built at ultimate capacity and which are phased and at what size. The costs shown in Table 5 for the Lake Travis supply assume maximum economies of scale with full development of the City contracted water supply from this source. As indicated in Tables 4 and 6, the City has exceeded its existing contracted share of the Brushy Creek Regional Wastewater Treatment Plant capacity and is currently being allowed to use un -used capacity reserved for other participants. The current need for additional capacity, as well as the project additional capacity needs of the next ten years, is necessitating a major expansion of the plant and a major wastewater conveyance tunnel. Tables 5 and 6 show the details related to the existing capacity of the water and wastewater systems and proposed new facilities along with their cost, capacity, unit cost, and allocation of existing and projected demand to these facilities. A weighted unit cost of service ($ per LUE) is then calculated by facility type based on the proportionate share of use of existing and new facility capacity by the growth anticipated over the next ten years. Update of Water/Wastewater Impact Fees of the City of Round Rock, Texas 8 Update of Water Impact Fees TABLE 5 WATER CAPITAL IMPROVEMENTS PLAN INVENTORY AND COSTING CITY OF ROUND ROCK Facility Capacity Allocations (LUES) Date of Cost Capacity Cost Existing Growth Use in Excess Total Facility Name Need Original $ Installed $' Total LUES per LUE Customers" Next 10 Years" Capacity Capacity WATER SUPPLY EXISTING FACILITIES Existing Wells and Stillhouse Supply"" n.a. FUTURE FACILITIES Stillhouse Raw Water Pump Station Upgrade 2004 Addil. Piping to Produce Full Stillhouse Capacity 2007 Subtotal Facilities to Make Full Use of Existing Supply FUTURE FACILITIES Lake Travis Raw Supply System Subtotal Future Facilities TOTAL WATER SUPPLY 2010 $ 26,679,330 $ 26,679,330 avg day mgd 20.188 32,335 $ 2,500,000 $ 2,500.000 $ 2,500,000 $ 2,731,818 6.500 10,411 31.245 1,090 9,711 $ 31,679,330 $ 31,911,147 26.688 42.746 $ 747 31,245 10,801 $ 5,639,410 $ 5,639,410 10.217 16,304 $ $ 5,639,410 $ 5,639,410 10.217 16,364 $ 345 345 WATER TREATMENT EXISTING FACILITIES Existing WTP and Well Chlorination Subtotal Existing Facilities FUTURE FACILITIES Lake Travis Treated Supply System Subtotal Future Facilities TOTAL WATER TREATMENT WATER PUMPING EXISTING FACILITIES Pump Stations Subtotal Existing Facilities FUTURE FACILITIES Southwest Pump Station Subtotal Future Facilities $ 37,318,739 $ 37,550,557 36.904 59,110 CAPITAL COST PER NEW LUE - $ $ 35,867,459 $ 35,667,459 $ 35,667,459 $ 35,667,459 mgd 818 32,335 700 10,411 700 42,746 5,185 5,185 5,185 5,185 31,245 15,987 700 47,931 52.500 42,045 $ 848 31,245 10,801 52.500 42,045 $ 848 31,245 10,801 2010 $ 58,394,097 $ 56,394,097 20.433 16,364 $ 3,446 $ 56,394,097 $ 58,394,097 20.433 16,384 $ 3,448 8 92,061,556 $ 92,061,556 72.933 58,409 AVERAGE CAPITAL COST PER NEW LUE - $ 1,691 31,245 42,045 5,185 5,185 15,988 42,045 11,179 16,364 11,179 16,364 11,179 58,409 mgd $ 2,973,702 $ 2,973.702 108.000 68,387 $ 43 31,245 10,801 26,342 68,387 $ 2,973,702 $ 2,973,702 106.000 68.387 $ 43 31,245 10,801 28,342 68,387 2010 $ 7,500,000 $ 8,955,392 $ 7,500,000 $ 8,955,392 20.000 12,903 $ 694 25.000 12,903 $ 894 5,185 5,185 7,718 12,903 7.718 12.903 TOTAL WATER PUMPING GROUND STORAGE EXISTING FACILITIES GS Tanks Subtotal Existing Facilities FUTURE FACILITIES GS Tank al Southwest Pump Station Subtotal Future Facilites TOTAL GROUND STORAGE ELEVATED STORAGE EXISTING FACILITIES ES Tanks Subtotal Existing Facilities FUTURE FACILITIES ES Tank on RR1431 Subtotal Future Facilites TOTAL ELEVATED STORAGE $ 10,473,702 $ 11,929,094 128.000 81,290 31,245 15,986 34,060 81,290 AVERAGE CAPITAL COST PER NEW LUE - $ 255 mg $ 1,327,498 $ 1,327,496 4.330 57,733 $ 23 31,245 10,801 15,688 57,733 $ 1,327,498 $ 1,327,496 4.330 57,733 5 23 31,245 10,801 15,688 57,733 2012 $ 3,000,000 $ 3,800,310 $ 3,000,000 $ 3,800,310 5.000 5.000 66,667 $ 66,667 $ $ 4,327,496 $ 5,127,806 9.330 124,400 AVERAGE CAPITAL COST PER NEW LUE - $ 0.0. $ 1,984,034 $ 1,984,034 $ 1,984,034 $ 1,984,034 2006 $ 1,800,000 $ 1,909,820 $ 1,800,000 $ 1,909,620 1.250 10,000 $ $ 3,784,034 $ 3,893,654 11.120 88,960 AVERAGE CAPITAL COST PER NEW LUE - $ TRANSMISSION EXISTING FACILITIES Existing Transmission Subtotal Existing Facilities FUTURE FACILITIES East Line Phase 3a Kenningston Park Round Rock West System adrift. capacity East Line Phase 3b - 36' 8 16'112' PRV HEC Campus - 16'/17/12" PRV CR112 Extension - 16"/12" PRV Forrest Creek - 12" Meadow Lake/The Settlement - 12" Hwy 79- 12' Double Creek - 18"112" South Arterial A - 16' South Creek 12' East Line Phase 4 South Loop Phase 1 - 36'/16" PRV CR112 - 30"124"112' PRV Parcel 1113 - 16"112' FM1460 20'/16"/24" PRV w/36" stub Parcel 3803 - 16" Parcel 662 - 16' Parcel 138 - 16"/12' Sam Bass - 24' Misc. Transmission mg 57 5,185 61,481 66,667 57 5,185 61,481 66,667 31,245 15,986 77,170 124,400 34 9870 78,960 $ 25 31,245 11,191 36,525 78,960 9.870 1.250 78,960 $ 10,000 $ 25 191 31,245 11,191 n . $ 32,184,675 $ 32,184,675 $ 32,184,675 $ 32,184,675 2005 $ 1,546,550 $ 1,592,947 2005 $ 441,000 $ 454,230 2006 $ 3,600,000 $ 3,600,000 2008 $ 5,343,000 $ 5,668,389 2006 $ 840,500 $ 891,686 2006 $ 912,000 $ 967,541 2008 $ 88,000 $ 93,359 2007 $ 808,000 $ 882,923 2008 $ 120,000 $ 135,061 2008 $ 1,493,500 $ 1,680,947 2008 8 525,000 $ 590,892 2008 $ 392,000 $ 441,199 2009 $ 1,800,000 $ 2,086,693 2010 8 3,495,000 $ 4,173,213 2011 $ 975,000 $ 1,199,127 2011 $ 1,087,000 $ 1,336,873 2011 $ 616,750 $ 758,525 2011 $ 294,000 $ 361,583 2012 $ 588,000 $ 744,861 2013 $ 758,500 $ 989,870 2013 $ 560,000 $ 730,673 2009 $ 3,000,000 $ 3,477,822 mgd 45.000 45.000 191 75 29,032 $ 1,109 29,032 8 1,109 31,245 29,032 4,796 4,796 5,987 36,525 5,204 5,204 41,729 78,960 10,000 10,000 88,980 29,032 29,032 29,032 Subtotal Future Facilities $ 29,283,800 $ 32,858,215 30.000 19,355 $ 1,698 2,212 15,987 1,158 19,355 TOTAL TRANSMISSION AVERAGE COST PER NEW LUE $ 61,468,475 $ 65,042,890 75.000 48,387 1,898 31,245 15,987 1,156 48,387 WATER TOTAL $ 209,434,002 $ 215,605,557 AVERAGE CAPITAL COST PER NEW LUE - $ 4,388 • Assumes avg. annual inflation rate of: 3.014 "' The sum of existing customer LUE demand and 10 -yr growth LUE demand equals the total demand shown in Table 3 for the year 2013. The existing supply capacity shown here equals the existing wafer supply shown in Table 3. Update of Water/Wastewater Impact Fees of the City of Round Rock, Texas 9 ha 1 Update of Water Impact Fees TABLE 6 WASTEWATER CIP INVENTORY AND COSTING CITY OF ROUND ROCK Facility Name Facility Capacity Allocations (LUES) Date of Cost Capacity Cost Existing Growth Use In Excess Total Need Original $ Installed $' Total LUES per LUE Customers Next 10 Years Capacity Capacity TREATMENT EXISTING FACILITIES Existing WWTPs Subtotal Existing Facilities FUTURE FACILITIES E. Regional WWTP Expansion Subtotal Future Facilties n a. $ 36,530,333 $ 36,530,333 $ 36,530,333 $ 36,530,333 mgd 9.600 25,737 $ 1,419 25,737 9.600 25,737 $ 1,419 25,737 25,737 25,737 2006 $ 32,651,020 $ 32,651,020 7.500 20,107 $ 1,624 3,411 15,853 843 20,107 $ 32,651,020 $ 32,651,020 7.500 20107 $ 1,624 3,411 15,853 843 20107 TOTAL WASTEWATER TREATMENT $ 69,181,353 $ 69,181,353 17.100 45,845 29,149 15,853 843 45,845 AVERAGE CAPITAL COST PER NEW LUE _ $ 1,624 PUMPING EXISTING FACILITIES mgd Existing LS n.a. $ 1,213,596 $ 1,213,596 19.900 18,477 $ 66 18,477 Subtotal Existing Facilities $ 1,213,596 $ 1,213,596 19.900 18,477 $ 66 18,477 FUTURE FACILITIES Oak Bluffs LS Rehab (growth portion) 2006 $ 6,780 $ 7,193 0.017 16 $ 448 11 5 16 The Shops LS Rehab (growth portion) 2006 $ 5,668 $ 6,013 0.014 13 $ 450 9 4 13 Forest Creek LS Rehab (growth portion) 2006 $ 91,584 $ 97,161 0229 213 $ 457 142 71 213 Trevino Court LS Rehab (growth portion) 2006 $ 21,984 $ 23,323 0.055 51 $ 459 34 17 51 Subtotal Future Facilities 126 016 $ 133 690 0.315 293 $ 457 - 195 98 293 TOTAL PUMPING $ 1,339,612 $ 1,347,286 20.215 18,770 18,477 195 98 18,770 18,477 18,477 INTERCEPTORS EXISTING FACILITIES Existing Interceptors Subtotal Existing Facilities FUTURE FACILITIES ®"' Avery Farms Brushy Creek Tunnel Chandler Creek McNutt Basin Misc. Interceptors AVERAGE CAPITAL COST PER NEW LUE _ $ n.a. $ 10,498,161 $ 10,498,161 $ 10,498,161 $ 10,498,161 2004 $ 2,104,973 $ 2,104,973 $ 11,100,414 $ 11,100,414 2009 $ 1,932,500 $ 2,240,297 2009 $ 8,079,750 $ 9,366,645 2007 $ 3,000,000 $ 3,278,181 mgd 84.000 84.000 15.300 6 77,994 $ 135 29,149 6,341 42,505 77,994 $ 135 29,149 6,341 42,505 14,206 $ 659 77,994 77,994 Subtotal Future Facilities $ 26,217,637 $ 28,090,510 33.900 31,476 $ 892 9,512 21,965 31,476 TOTAL INTERCEPTORS AVERAGE COST PER NEW LUE $ 36,715,798 $ 38,588,670 117.900 109,471 29,149 15,853 64,469 109,471 AVERAGE CAPITAL COST PER NEW LUE _ $ 589 WASTEWATER TOTAL $ 107,236,763 $ 109,117,310 AVERAGE CAPITAL COST PER NEW LUE _ $ 2,221 • Assumes avg. annual inflation rate of. 3.0% Update of Water/Wastewater Impact Fees of the City of Round Rock, Texas 10 Update of Water Impact Fees 6.0 CONSIDERATION OF OTHER METHODS OF CAPITAL PAYMENT For utilities that charge an impact fee, the new customer generally pays for capital in two ways: (1) initially through the up -front impact fee, and (2) over the longer-term through utility rate payments, where typically some portion of customer rate payments also funds capital projects. The recent 77th Texas Legislature amended Chapter 395 of the Local Government to require either: (1) a calculated credit for rate payments be reflected in the fee amount, or (2) a credit equal to 50 percent of the total projected cost of the ._ capital improvements plan be given in calculating the maximum fee amount. Table 7 indicates the estimated cost per LUE that is projected to be borne in the utility rates by the average new customer. The rate credit calculation considered: (a) existing capital obligation to wholesale providers, (b) existing debt (c) future debt payments incurred in the year in which the facilities would be built and financed, and (d) the projected LUEs at the mid -point year of 2008. TABLE 7 EXISTING OR ANTICIPATED DEBT TO BE PAID THROUGH UTILITY RATES CITY OF ROUND ROCK Facility Type Est. Debt in Rates 2008 Est. Debt in LUEs Rates per LUE WATER UTILITY Supply Existing Debt Series 2004-2013 New Growth Subtotal Water Supply Treatment Existing Debt Series 2004-2013 Subtotal Water Treatment Pumping Existing Debt Series 2004-2013 Subtotal Pumping $ 411,339 38,350 $ 11 $ 79,532 38,350 $ 2 $ 490,871 $ 13 $ 1,109,565 38,350 $ 29 $ 572,058 38,350 $ 15 $ 1,681,623 $ 44 $ 103,604 38,350 $ 3 $ 103,604 $ 3 Subtotal Water Pumping Ground Storage Existing Debt Series 2004-2013 $ 21,121 38,350 $ 1 Subtotal Water Storage Elevated Storage Existing Debt Series 2004-2013 $ 47,937 38,350 $ 1 Subtotal Water Storage Transmission Series 2004-2013 Subtotal Transmission Lines $ 47,937 $ 593,766 $ 593,766 38,350 $ 15 $ 15 Total Water WASTEWATER UTILITY Treatment Existing Debt Series 2004-2013 Subtotal WWTP Pumping Existing Debt Series 2004-2013 Subtotal WWTP Interceptors Existing Debt Series 2004-2013 Subtotal Interceptors $ 25,536,844 $ 3,465,118 $ 29,001,962 $ 11,182 $ 11,182 $ 3,174,544 $ 3,075,342 $ 6,249,886 38,350 $ 38,350 $ 38,350 $ 77 666 90 756 0.29 38,350 $ 38,350 $ 0.29 83 80 163 Total Wastewater $ 920 Total Water and Wastewater 996 Update of Water/Wastewater Impact Fees of the City of Round Rock, Texas 11 ha I Update of Water Impact Fees 7.0 ALTERNATIVE IMPACT FEE CALCULATIONS Table 9 summarizes the unit capital cost of providing new service and the two alternative credit calculations for new customers. The alternative approach that calculates a specific rate credit (Option A) results in the maximum impact fee calculation of $4,296 per LUE for water and $1,306 per LUE for wastewater, totaling $5,602 per LUE. As can be seen, the alternative 50% of capital cost method for calculating a rate credit (Option B) results in a lesser water impact fee of $2,184 per LUE and wastewater fee of $1,115 per LUE, yielding an overall $3,303 per LUE. TABLE 8 DERIVATION OF ALTERNATIVE MAXIMUM WATER AND WASTEWATER IMPACT FEE AMOUNTS CITY OF ROUND ROCK ITEM Weighted Optional Adjustments Capital Cost of - Option A - - Option B - New Service Rate 50% Cost Highest of per LUE Credit Adjustment - Option A - - Option B - Option A or B WATER Supply $ 616 $ 13 $ 308 $ 603 $ 308 $ 603 Treatment $ 1,691 $ 44 $ 845 $ 1,647 $ 845 $ 1,647 Pumping $ 255 $ 3 $ 127 $ 252 $ 127 $ 252 Ground Storage $ 34 $ 1 $ 17 $ 33 $ 17 $ 33 — Elevated Storage $ 75 $ 1 $ 37 $ 74 $ 37 $ 74 Transmission $ 1,698 $ 15 $ 849 $ 1,682 $ 849 $ 1,682 Allocated Impact Fee Study Cost $ 4 $ 4 $ 4 $ 4 Total Water $ 4,372 $ 77 $ 2,184 $ 4,296 $ 2,188 $ 4,296 WASTEWATER Treatment $ 1,624 $ 756 $ 812 $ 868 $ 812 $ 868 Pumping $ 8$ 0$ 4$ 8$ 4$ 8 Interceptors $ 589 $ 163 $ 295 $ 426 $ 295 $ 426 Allocated Impact Fee Study Cost $ 4 $ 4 $ 4 $ 4 Total Wastewater $ 2,225 $ 920 $ 1,111 $ 1,306 $ 1,115 $ 1,306 TOTAL WATERNVASTEWATER $ 6,598 $ 996 $ 3,295 $ 5,602 $ 3,303 $ 5,602 The fee methodology was replicated for each major facility type in the utility system (ex. Supply, treatment, pumping, elevated storage, ground storage and transmission) so that the total fee amount is the sum of the component facility fees. This provides a basis for extending the fee to wholesale customers of the City or granting fee offsets if a developer cost -participates with the City on CIP projects. Update of Water/Wastewater Impact Fees of the City of Round Rock, Texas 12 Update of Water Impact Fees For comparison purposes, the current impact fees of other near -by cities are listed below: City Water Wastewater Total Austin N.E. Preferred Development Zone $ 700 $ 400 $1,100 Western city $1,500 $1,200 $2,700 Pflugerville $2,491 $1,362 $3,853 Round Rock (current) $2,910 $1,059 $3,969 Georgetown $2,295 $1,869 $4,164 Buda $2,721 $1,514 $4,234 Cedar Park $2,250 $2,000 $4,250 Leander $2,850 $1,550 $4,400 San Marcos $2,466 $2,185 $4,651 Jonah SUD (water only) $4,125 n.a. -- Round Rock (maximum potential) $4,296 $1,306 $5,602 Chisholm Trail SUD (water only) $4,600 n.a. -- Update of Water/Wastewater Impact Fees of the City of Round Rock, Texas 13 Update of Water Impact Fees Attachment A Location of Proposed Improvements Identified in the 10 -Year Water and Wastewater CIPs Update of Water/Wastewater Impact Fees of the City of Round Rock, Texas 14 3 Update of Water Impact Fees CITY OF ROUND ROCK WATER DISTRIBUTION SYSTEM Location of Proposed Water Improvements Between 2004-2013 Update of Water/Wastewater Impact Fees of the City of Round Rock, Texas 15 a Update of Water Impact Fees Existing Manholes Existing Pipes Litt Stations 2013 New Manholes 2013 New Pipes ■ 2013 Lift Station Upgrad Name • East WWTP • West VJWTP yfie4hons Location of Proposed Wastewater Improvements Between 2004-2013 Update of Water/Wastewater Impact Fees of the City of Round Rock, Texas 16 ha 1