Contract - SJ Louis Construction - 2/12/2015 Page 1 of 4 Contract Quantity Adjustment/Change Order rev,08/12 Department: Utilities&Environmental Services Project University Boulevard &Parcel 150-36" Name: Water Lines Date: 1/5/15 City Project Change Order/Quantity ID Number UNV36/PL150 Adjustment No. 1 Justification Contract Quantity Adjustment/Change Order#1 is needed to adjust quantities for bid items listed. This will increase contract by$107,964.27 or 1.85%. SUMMARY Amount %Change Original Contract Price: $5,829,401.61 Previous Quantity Adjustment(s): $0.00 This Quantity Adjustment: $107,964.27 Total Quantity Adjustment(s): $107,964.27 Total Contract Price with Quantity Adjustment(s): $5,937,365.88 Previous Change Order(s): 0.00 This Change Order: $0.00 0.00 Total Change Order(s)To Date: $0.00 0.00 Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: $5,937,365.88 Difference between Original and Adjusted Contract Prices: $107,964.27 Original Contract Time: 330 Time Adjustment by previous Quan.Adj./Change Order: Time Adjustment by this Quan.Adj./Change Order: New Contract Time: 330 �� 1: Submitted for Approval IZAk.Prepared B ./16 /L Eddie Zapata, Project Manager, City of Round Rock Dat Printed Name,Title,Company 'S— SignaturO P Y ;�,9. Approvals Contractor: Uv"' ���J�" -- 1)'IDA.RtL1 So.1)StoM'hcA4£4-Mgt)�b0✓$$ cossf. ((I2 (lc gPature Printed Name,Title,Company Date City rojecG Manager: f �! O Eddie Zapata, Project Manager //497/6-- Si atur 0 Printed Name,Title Da e 1 b r Mayor/City /l /�',�a /1 ��'� I 2.17i l Manager Y'` VtOrir Signature Printed Name,Title Date 1Z,Z0C9-2�ll Page 2 of 4 Contract Quantity Adjustment/Change Order --ROUND ROCKTTEXAS rev,08/12 Project Name: University Boulevard &Parcel 150-36"Water Lines Quan.Adj./Change Order No.: 1 Change Order Data Contract Time Adjustment Item # Item Description Unit Qty. Unit Price Amount (Days) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $0.00 0 • Page 3 of 4 'IH"lIN"ROCK TDCAS Contract Quantity Adjustment/Change Order rev,08/12 Project Name: University Boulevard &Parcel 150- 36"Water Lines Quan. Adj./Change Order No.: 1 Quantity Adjustment Data Contract Time Adjustment Bid Item # Item Description Unit Qty. Unit Price Amount (Days) 3 Jacking or Boring 24 in. Pipe, Class 150 (Univ. Blvd) per Section 501 LF 45.338 $315.00 $14,281.47 0 4 Jacking or Boring 30 in. Pipe,Class 150 (Univ. Blvd) per Section 501 LF 34 $400.00 $13,600.00 6 Encasement Pipe 24 in. Dia.,Type Steel (Univ. Blvd) per Section 505 LF -32 $47.00 -$1,504.00 7 Encasement Pipe 30 in. Dia.,Type Steel (Univ. Blvd) per Section 505 LF -34 $84.00 -$2,856.00 18 Ductile Iron Fittings 4 in.through 24 in. (Univ. Blvd) per Section 510 Ton 0.2 $1.00 $0.20 1 Jacking or Boring 54 in. Pipe,Class 150 (Parcel 150) per Section 501 LF 172 $665.00 $114,380.00 Encasement Pipe, 54 in. Steel ASTM A 4 134 (all depths) including excavation and (Parcel 150) backfill, per Section 505 LF -10 $224.00 -$2,240.00 Pipe, 36 in., Ductile Iron Class 200 Factory Restrained Joint(all depths) 8 including excavation and backfill, per (Parcel 150) Section 510 LF -60 $262.00 -$15,720.00 Pipe, 36 in., Ductile Iron Class 200 9 Factory Restrained Joint Carrier Pipe, (Parcel 150) Including Spacers, per Section 510 LF 60 $245.00 $14,700.00 25 (Parcel 150) Chain Link Fence, 6 ft., per Section 701 LF -1725.16 $15.00 -$25,877.40 26 Chain Link Vehicular Gate, per Section (Parcel 150) 701 EA -1 $800.00 -$800.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Page 4 of 4 Contract Quantity Adjustment/Change Order l OUNND ROCK TTLXAS rev,08/12 TOTALS: $107,964.27 0