CM-2016-1186 - 9/20/2016Page I ol'3 Contract Quantity Adjustment/Change Order / ROUND ROCK it x rev, 01/16 Department: PARD Project Name: Old Settlers Park Multipurpose Field Complex Date: 7/26/16 City Project Change Order/Quantity ID Number Adjustment No. 12 Vendor Joeris General Contractors 823 Arion Parkway, San Antonio, TX 78216 210-494-1638 Company Name Address Phone No. Justification See attached Summary Form SUMMARY Amount % Change Original Contract Price: $22,994,973.00 Previous Quantity Adjustment(s): This Quantity Adjustment: $0.00 Total Quantity Adjustment(s): $0.00 Total Contract Price with Quantity Adjustment(s): $22,994,973.00 Previous Change Order(s): 0% This Change Order: $0.00 0% Total Change Order(s) To Date: $0.00 0% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: $22,994,973.00 Difference between Original and Adjusted Contract Prices: $0.00 Original Contract Time: 696 days Time Adjustment by previous Quan. Adj./Change Order: 0 Time Adjustment by this Quan. Adj./Change Order: 0 New Contract Time: 696 days Submitted for Approval Prepared By: °� l%1 Lkn a g-, �(� �v )t �/ Signature Printed Name, Title, Company _i Date • Approvals Joeris JG al C r trs d. 1/1 Michelle Seward Davis, Secretary Contra •rt , V Joeris Group Inc., - General Partner ignatu Printed Name, Title, Company Date City Project Manager: �%, �� ��s ,212 16 XSignature Printed Name, Title t Date Meper/City Manager/ (;(.� it � i%. A ,���!( Y _ Signature I Printed Name, Title Date CM- 2C)(io-- IIS(ln Parc 2 ol'3 �= Contract Quantity Adjustment/ Change Order �ROl1N0 ROCK ILY.:.S rev, 01/16 Project Name: Old Settlers Park Multipurpose Field Complex Quan. Adj./Change Order No.: #2 Chanae Order Data Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 1 Clubhouse Flooring Changes LS 1 -$2,546.00 -$2,546.00 0 2 Stone Veneer @ Fl/F2 Shade LS 1 $17,140.00 $17,140.00 3 Fencing Revisions LS 1 -$3,514.00 -$3,514.00 4 DW Tapping Sleeves LS 1 $2,588.00 $2,588.00 5 Additional Road Bore LS 1 $4,610.00 $4,610.00 6 Musco Pole Base Spread Footing LS 1 $12,341.00 $12,341.00 7 Restroom Trench Drain Credit LS 1 -$5,000.00 -$5,000.00 8 Bleacher Seating Finish LS 1 -$1,100.00 -$1,100.00 9 Field 1 Drainage Revisions LS 1 -$1,357.00 -$1,357.00 10 Irrigation and Landscape Credit LS 1 -$46,713.00 -$46,713.00 11 Field 2 Drainage Revisions LS 1 $6,340.00 $6,340.00 12 Revised Grade for Kenney Fort LS 1 $4,837.00 $4,837.00 13 Clubhouse Roof Letter Signage LS 1 $6,490.00 $6,490.00 13 Transfer to Owners Betterment LS 1 $5,884.00 $5,884.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS:J $0.00 0 Page 3 of'3 �`Contract Quantity Adjustment/ Change Order `r, /( ROUND ROCK I I Y.:.I rev, 01/16 Project Name: Old Settlers Park Multipurpose Field Complex Quan. Adj./Change Order No.: #2 0imnfif- nt�♦ Bid Item # Item Description Unit P Qty. Unit Price Amount Contract Time Adjustment $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: 0.00 1 0 Old Settlers Park Multipurpose Field Complex Change Order #2 Summary Date: 07/26/2016 Change Order #2 to the contract with Joeris General Contractors includes changes to the current phase of construction. These changes include: Clubhouse Flooring Changes: Since it can be assumed that rubber cleats will be worn inside the clubhouse building, there was concern of the laminate flooring being too slippery and easily damaged. Polished/stained concrete lessens these risks and will be easier to maintain. Cost: ($2,546.00) Stone Veneer at Fields 1 & 2 Shade Structures: Adding a stone veneer at the shade structures will tie the columns at these fields into the rest of the columns throughout the complex providing a more uniform look. Additionally, adding the stone veneer in this location would allow the contractor to conceal electrical conduit feeding the pedestrian lights in these shade structures. Cost: $17,140.00 Fencing Revisions: The original plans for the fence layout showed the fence panels tying directly into stone columns approximately every 30 feet. The fence contractor expressed concerns about this design and the decision was made to add a 4" post next to each columns. To help offset the cost of the extra posts, the decision was made to decrease the specified size of the gate posts from 10" to 6". The engineer did not think that decreasing the size of the gate posts would be a safety or maintenance issue. Cost: ($3,514.00) DW Tapping Sleeves: The domestic water line for the complex taps into the existing water service line in two locations. During the submittal/resubmittal process, two different tapping sleeves were submitted, the original is typically accepted by the City and the resubmittal is not. The wrong tapping sleeve was unintentionally approved for use. When installed in the field, inspectors denied use of the sleeve and the contractor split the cost of the new sleeve with the City since both parties were at fault. Cost: $2,588.00 Additional Road Bore: Due to the location of an existing power line not shown in the plans (private line) the road bore pit needed to be moved back 10 additional feet. This was an unforeseeable conflict. Cost: $4,160.00 Musco Pole Base Spread Footing: Upon drilling the footing to install one light base pier footing, the contractor encountered ground water. In order to make the light pole structurally sound, the footing had to change to a spread footing, requiring a much larger hole and more concrete. This was an unforeseeable issue. Cost: $12,341.00 Restroom Trench Drain Credit: The specifications for the restroom trench drain were for a steel drain and grate. The plumbing subcontractor quoted a plastic drain with grate by mistake and requested a substitution approval. The plastic model has been used elsewhere in the park with great success, so the substitution approval was granted as long as a credit was given. Cost: ($5,000.00) Bleacher Seating Finish: The specifications for the bleachers called for a powder coated finish with a color to be determined by the City. Upon internal discussions, it was decided to have an unfinished surface so paint scratches and general wear and tear are not noticed. Cost: ($1,100.00) Field 1 Drainage Revisions: There wasn't a flowline shown for connecting the artificial turf underdrains to the storm drain line in the plans for the championship field. Upon looking at field conditions, it was possible to connect the underdrains in a way that actually decreased the amount of pipe specified in the plans and save money. Cost: ($1,357.00) Irrigation and Landscape Credit: As part of an effort to decrease maintenance needs and save project money, a portion of the landscape was cut from the project. The landscape removed will not detract from the project quality, nor does not include any of the landscape that added to comply with the landscape ordinance. Additionally, after consulting with the Rain Bird irrigation representative, it was decided that it would be possible to cut a couple of Maxicom CCU as well as a controller. Cost: ($46,713.00) Field 2 Drainage Revisions: Wall drain connections at Field 2 were not shown on the plans. This item includes five (5) connections from the wall drains to the storm drains. Cost: $6,340.00 Revised Grades for Kenney Fort: Engineers for the Kenney Fort Blvd. project requested the parking lot grades be raised to make for easier connections to the road. Engineers from both projects worked together to find a solution that worked for all parties. Cost: $4,837.00 Clubhouse Roof Letter Signage: During bid a placeholder design for the building sign was put in the plans for estimating. After design of the actual logo/signage, estimates needed to be adjusted. Cost: $6,490.00 Transfer to Owners Betterment Allowance: Since the work outlined above netted an overall credit to the City, it was decided to transfer it to the Owner's Betterment Allowance to offset the cost of the Dillo dirt amendment to the soil. Cost: $5,884.00 Total this Change Order: $0.00 Contingency Original Spent to Date Remaining $973,670.91 $550.00 1 $973,120.91 Betterment Allowance Original Spent to Date Remaining $200,000.00 $78,349.60 $121,650.40 Oncor Allowance Original Spent to Date Remaining $350,000.00 $346,039.00 $3,961.00 Architectural Revisions Allowance Original Spent to Date Remaining $250,000.00 $189,897.50 $56,877.50 Owner's Betterment Allowance Tracking Date Notes Starting Cost Impact Ending PARD Joeris 12-17-15 Original allowance amount per signed contract Balance N/A Balance Approval Approval 12-17-15 Original allowance $200,000.00 N/A N/A y2 4-8-16 amount per signed $94,699.00 $4,129.00 $90,570.00 6-2-16 contract $90,570.50 $2,924.00 $87,646.00] 1� 3-21-16 Dillo amendment $200,000.00 $100,000.00 $100,000.00 !' 6-3-16 for soil $84,366.50 $13,097.00 $71,269.00 72 4-29-16 Credit for Change $100,000.00 ($15,748.40) $115,748.40 6-10-16 Order #1 $70,069.50 $690.00 $69,801.00 8-5-16 Credit for Change $115,748.40 ($5,884.00) $121,632.40 Order #2� ricl Oncor Allowance Tracking Date Notes Starting Cost Impact Ending PARD Joeris 12-17-15 Original allowance amount per signed contract Balance N/A Balance Approval Approval 12-17-15 Original allowance $350,000.00 N/A N/A y2 4-8-16 amount per signed $94,699.00 $4,129.00 $90,570.00 6-2-16 contract $90,570.50 $2,924.00 $87,646.00] 4-11-16 Oncor Civil by $350,000.00 $343,687.00 $6,313.00 6-3-16 Capital in Areas 1 $84,366.50 $13,097.00 $71,269.00 72 6-8-16 and 2 and 320 LF $83,166.50 $778.00 $70,491.00 6-10-16 of Area 3 $70,069.50 $690.00 $69,801.00 5/17/16 Add back fiber pull $6,313.00 $2,352.00 $3,961.00 boxes ricl Architectural Revisions Allowance Tracking Date Notes Starting Balance Cost Impact Ending Balance PARD Approval Joeris Approval 12-17-15 Original allowance amount per signed contract $250,000.00 N/A N/A �P 3-28-16 RFP #1b $250,000.00 $155,301.00 $94,699.00 y2 4-8-16 COR #018 $94,699.00 $4,129.00 $90,570.00 6-2-16 COR #020 $90,570.50 $2,924.00 $87,646.00] 6-7-16 COR #028 $87,646.50 $3,280.00 $84,366.00 6-3-16 COR #030 $84,366.50 $13,097.00 $71,269.00 72 6-8-16 COR #033 $83,166.50 $778.00 $70,491.00 6-10-16 COR #035 $70,069.50 $690.00 $69,801.00 6-16-16 COR #036 $69,291.50 $1,438.00 $68,363.00 7-7-16 COR #038 $68,601.50 $6,051.00 $62,312.00 7-7-16 COR #040 $67,163.50 $1,010.00 $61,302.00 �? 7-15-16 COR #043 $61,112.50 $3,225.00 $58,077.00 City of Round Rock ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 2 with Joeris General Contractors, Ltd. for the Old Settlers Park Multipurpose Field Complex and Soccer Complex Improvements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 9/16/2016 Dept Director: Rick Atkins, Director cost: $0.00 Indexes: 2014 General Obligation Bonds Attachments: LAF - Quantity Adjustment -Change Order #2 w- Joeris General Contractors ....pdf, Back -Up OSP MP Field Complex Change Order No 2.pdf Department: Parks and Recreation Department Text of Legislative File CM -2016-1186 This item will authorize the City Manager to execute Quantity Adjustment/Change Order No. 2 with Joeris General Contractors. Items included in this Change Order include: clubhouse flooring changes, irrigation and landscape credits, sports lighting spread footing, stone veneer at shade structures, and more. This Change Order netted a $5,884.00 credit which has been transferred to the Owner's Betterment Allowance to help offset the price of the dillo dirt amendment at the natural turf fields. The Multipurpose Field Complex Project includes five (5) natural turf multipurpose fields, five (5) synthetic turf multipurpose fields, parking, sports lighting, restroom/concessions building, spectator amenities, playground, etc. The Soccer Complex Project will include renovation of the existing five (5) soccer fields to create two (2) multipurpose fields and three (3) individual soccer fields (1 full, 2 youth), replacement of the existing topsoil and sod, and ADA upgrades to the complex. The Multipurpose Field Complex will be completed first which will allow the City to move local leagues to the Multipurpose Complex while construction on the Soccer Complex occurs. PARD recommends approval of this item. This project is in line with numerous objectives within Strategic Plan Goals 1 -High Value Services and Goal 4 -Sports Capital for Tourism. Department official recommends approval of this item. City of Round Rock Page 1 Printed on 9/15/2016