Loading...
R-2016-3785 - 10/13/2016RESOLUTION NO. R-2016-3785 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Cash Construction Co., Inc. for the Southwest Downtown District Infrastructure Improvements Phase 5A Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 4, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 4 to the Contract with Cash Construction Co., Inc. for the Southwest Downtown District Infrastructure Improvements Phase 5A Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 13th day of October, 2016. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: �4ft�. [AKL SARA L. WHITE, City Clerk 0112.1604;00364516 rev, OBf l2 Department: Project Name: City Project ID Number Justification Transportation CORR SWDT Ph 5A SWDT5 EXHIBIT Contract Quantity AdjustmentJChange Order Page I of 3 Date: 7/12/16 Change Order/Quantity Adjustment No. 4 lQuantity adjustments for additional concrete, waterline, electric, and paving work. Change order work for new concrete work, new gateway arch additions, ;edge milling for mill and overlay work, and other misc. work SUMMARY Amount % Change Original Contract Price: $13,773,063.00 ... . . ........ . Previous Quantity'Adjustment(s).- _... ._. _ $820,268.40 This Quantity Adjustment: $258,732.00 Total Quantity Adjustment(s): $1,079,000.40 Total Contract Price with Quantity Adjustment(s): $14,852,063.40 Previous Change Order(s): $352,050.00 2% This Change Order: $419,383.30 3% Total Change Order(s) To Date: $771,433.30 5% Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Pius Change Order(s)]: $15,623,496.70 Difference between Original and Adjusted Contract Prices: $1,850,433.70 Original Contract Time: 720 Calendar Days Time Adjustment by previous Quan. Adj./Change Order: 35 Calendar Days Time Adjustment by this Quan. Adj./Change Order: 0 Calendar Days New Contract Time: 755 Calendar Days Submitted for Approval Prepared By: B.J. Cash, Cash Construction (Q j (o j ILO SignaUre Printed Name, Title, Company Date Approvals Contractor: Q� B.J. Cash, Cash Construction to f4 j1�4 nature Printed Name, Title, Company Date City Project , , A n _ . CORR ori Mayor/City Manager Alan McGraw, Mayor, CORR Signature Printed Name, Title Date Page 2 of 3 Contract Quantity Adjustment/ Change Order W! 12 Project Name: CORR SWDT Ph 5A Quan. Adj./Change Order No.: Chanae Order Data I U I ALb.1 tiS41`.3,dLS3.3U1 U Item # Item Description p Unit Qty. Contract Time Adjustment Unit Price Amount (Days) 331 North Mays Guardrail include retrofil plate and 25 oot temrinal anchor LS 1 $4,290.00 $4,290.00 ..382.-a: South Mays Guzaf; fl at Bagdad LS 1 $3,000.00 $3,00 333 Gateway Arch Plan Changes for CMU Columns and Rock Facade LS 1 $20,640.00 $20,640.00 345 Edge Mill ( north bridge to 79) LF 3916 $11.00 $43,076.00 351 Hot Mix Asphaltic Concrete Pavement, Type D (Method B; 1.5 -inch) SY 20833 $12.50 $260,412.50 352 Cleaning and Sealing Existing Joints LF 1326 $44.00 $58,344.00 353 Header Type Expansion Joint CF 40.8 $726.00 $29,620.80 $0.00 $0.00 I U I ALb.1 tiS41`.3,dLS3.3U1 U Page 3 of 3 Contract Quantity Adjustment/Change Order �, canz Project Name: CORR SWDT Ph 5A Quan. Adj./Change Order No. Quantity Adjustment Data I Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment Da s 174 6" C-900 SDR 14 PVC Pie LF 1 180 $200.00 $36,000.00 4"_C-9fU',,SDR L4 PVC Pipe LF 372 $190,00 :,;.:a :.,•.• K ?Q,4,00 .. 185 6" MJ Gate Valve w/Valve Box EA 1 $1,400.00 $1,400.00 184 4" MJ Gate Valve w/Valve Box EA 3 $1,300.00 $3,900.00 176 6" MJ Cap EA 1 $300.00 $300.00 173 4" MJ Cap EA 2 $250.00 $500.00 84 6x6 Tapping Sleeve and Valve with 12x6 Reducer EA 1 $5,500.00 $5,500.00 87 Removal of existing 8 -inch water line Contractor shall maintain existing water services LF 180 $120.00 $21,600.00 178 Ductile Iron Fittings TON 0.15 $5,800.00 $870.00 77 Installing or Reconnecting Lateral Water Service to Existing, or Replaced Pipe (Single 1-1/2" or 2" Water Service Connection for City Meter, Backflow Preventor, Etc.) EA 11 $4,000.00 $44,000.00 81 Fire Hydrant Assembly per detail), includes leads and 6" Gate Valve EA 1 $6,200.00 $6,200.00 245 Plane ASPH Conc Pav (TXDOT-354) (mill both Bridges) SY 10428 $6.50 $67,782.00 $0.00 $258,732,001 0