Loading...
CM-2016-1213 - 10/17/2016mv, 01/16 Department: Project Name: City Project ID Number Contract Quantity Adjustment/Change Order Parks and Recreation Round Rock West Improvement Date: 9/23/16 Change Order/Quantity Adjustment No. 3 Page I of 3 Vendor Choice Builders, LLC 3809 S. General Bruce Dr, Suite 103 254-534-2423 Company Name Address Phone No. Justification Additional deduct of concrete restroom slab, partial deduct of culvert rehabilitation, grading to ensure depth of playground safety material, pull wire from new meter to existing tennis panel location, installation of provided volleyball posts, additional waterline work, additional irrigation repairs for turf irrigation, deduct of revegetation area -IMM I Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Submitted for Approval Amount $375,798.08 $1,337.00 $630.00 $1,967.00 $377,765.08 $31,978.22 $6,492.46 $38,470.68 $416,235.76 150 days 2 days 5 days 157 days $40,437.68 51gnature Printed Name, Title, Company Date Approvals � p Contractor: l�/�1%% rY 't 06-14, l�alpa�-� ice ( (�+ s 9 - Zs /b Signature Printed Name, Title, Company Date City Project ,y , l.. Change 8% 2% 10% Signature Contract Quantity Adjustment/Change Order R UNL] pCICK rEX.AS rev, 01/16 Project Name: Round Rock West Improvement Quan. Adj./Change Order No. r6.., n 4 nF Page 2of3 Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment Adjusus(Das 1 2 3 4 5 6 Deduct Restroom Concrete Slab Deduct Replacement of CulvertLS Playground Excavation Wire from Meter to Tennis Panel Installation of Volleyball Posts Removal of existing light poles LS LS LS LS EA 1 1 1 1 1 3 -$2,032.00 -$3,477.46 $1,018.26 $3,736.70 $150.00 $257.32 -$2,032.00 -$3,477.46 $1,018.26 $3,736.70 $150.00 $771.96 7 8 Additional Irrigation Repairs Deduct of Revegetation Area LS LS 1 1 $6,925.00 -$600.00 $6,925.00 -$600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $6,491A61 0 Page 3 of 3 Contract Quantity Adjustment/Change Order - + R UN0 ROCK rLXAS t rev, 01/16 Project Name: Round Rock West Improvement Quan. Adj./Change Order No.: (lrranl-it�i nrhrrct.r.o.,t norms Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment 1 Additional Water Line, 2" LF 30 $21.00 $630.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: 630.00 0 City of Round Rock IROUND ROCK Agenda Item Summary Agenda Number: Title: Consider executing Quality Adjustment/Change Order No. 3 with Choice Builders, LLC for the Round Rock West Improvements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 10/14/2016 Dept Director: Rick Atkins, Director Cost: $7,122.46 Indexes: 2014 General Obligation Bonds Attachments: LAF - Quantity Adjustment -Change Order #3 w- Choice Builders (00364969xA08F8).pdf, RRW - CO3(Signed).pdf Department: Parks and Recreation Department Text of Legislative File CM -2016-1213 Consider executing Quality Adjustment/Change Order No. 3 with Choice Builders, LLC for the Round Rock West Improvements Project. This item will authorize the City to execute CO #3, which will include additional deduction of the concrete restroom slab, partial deduction for more cost effective culvert rehabilitation, pulling of wire from relocated electrical meter to existing tennis panel location to rehabilitate existing court lighting, additional grading to provide adequate depth of playground safety material, installation of donated volleyball court posts, removal of abandoned light poles, additional irrigation repairs to achieve functional turf irrigation, deduct of revegetation area covered by sod, and relocation of water line that interfered with the play equipment. The Round Rock West Improvement Project is being funded through the 2014 General Obligation Fund. The project includes the demolition of existing park amenities, site prep, new construction of concrete flatwork, park amenity installation, and masonry. Parks and Recreation team members met with the neighborhood numerous times over the past year to gather input on the park improvement plan and have been met with overwhelming support. The final plan presented to the neighborhood received positive feedback and the neighborhood was excited to see the redevelopment efforts by the city. It aligns with the Game On: Parks and Recreation Master Plan and the City City of Round Rock Page 1 Printed on 1011312016 Agenda Item Summary Continued (CM -2016-1213) Strategic Goals under Places and Spaces: -Prevent neighborhood deterioration -Improve City aesthetics, development and redevelopment quality, and sustainability -Identify and plan for future connectivity and mobility needs and options $7,122.46 2014 General Obligation Bonds Department official recommends approval of this item. City of Round Rock Page 2 Printed on 1011312016