Loading...
CM-2016-1224 - 11/4/2016STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO.2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: SEILER LANKES GROUP, LLC ("Engineer") ADDRESS: P. O. Box 2186, Round Rock, TX 78680 PROJECT: 411 Main Street Proposed Enhancements This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Seiler Lankes Group, LLC, hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 23rd day of March, 2015 for the 411 Main Street Proposed Enhancements Project in the amount of $38,869.15; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on October 2, 2015 to amend the scope of services and to increase the compensation by $16,800.00 to a total of $55,669.15; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $5,315.52 to a total of $60,984.67; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B. Enaineering Services shall be amended as set forth in the attached Addendum to Exhibit B. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $5,315.52 the lump sum amount payable under the Contract for a total of $60,984.67, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract Rev.06/16 0199.1509; 00366243 84275 [signature pages follow] SEILER LANKES GROUP, LLC By: L5 Date Supplemental Contract Rev.06/16 0199.1509; 00366243 84275 CITY OF ROTAD ROCK / By: Laurie Hadley, City Manager Date q D A O ORM: L. Sheets, City Attorney ADDENDUM TO EXHIBIT B Engineering Services SCOPE OF SERVICES The scope of services to be provided by the Engineer includes preparation of a retaining wall plan and profile with standards for construction at 411 Main Street. The engineer shall provide Plan and Profile sheet with standards. I. DESIGN SERVICES A) Submit one copy of the required documentation for the construction of a retaining wall located at 411 Main Parking lot. Document preparation $5,315.52 ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page CD 5 's " x � W LL C p r .: U�vCJ N O U� O O rM r b9 M 16 N 0 U co O U c J O O O O O N O O O O O N N O O O O O LO O O O O O Lo N 0 0 0 0 0 0 0 0 0 0 ..., 64 FfT EA cA (A r EH EA V3 64 69 r M M M o O O O O O O N O 0 0 0 N N 7 <Y o O O 0 0 0 0 0 0 0 0 0 0 O O Q O N O UJ U m `o m c0v� N L 0 0 0 0 0 0 0 0 0 0 O O U O O F N fA L O N � N � C � C W 0 0 0 0 0 0 0 0 0 0 O O O m C W M O U O O � C ~ �} N 0 0 0 0 0 0 0 0 0 0 O O O C O NZo O C o am W 0 0 0 0 0 0 0 0 0 0 O V V V N U (Op Co Q ON V d C W 6q 0 0 0 0 0 0 0 0 0 0 O O O N N O N W O O O O O N O O O O N CO N N O U N co � O 44 N N O O o U 2 -o o 0 - m N Y O U o z c c ~N = O U U) a c a 3 co c o c a c to o C N C C y@ p U)p a R d U N 12f o� d � ,NY mo p c co o c o i a) c m c o U 3 "O m U ` L -p C EU 0 N N LD `a N O 0,W �LLofQ SCC) C) N O U� O O rM r b9 M 16 N 0 U co O U c J 4- City of Round Rock F ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 2 with Seiler Lankes Group, LLC for the 411 Main Street Proposed Enhancements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 11/4/2016 Dept Director: Gary D. Hudder, Transportation Director Cost: $5,315.52 Indexes: General Self -Financed Construction Attachments: SC#2 w -Seiler Lankes Group, LLC for 411 Main Street Proposed Enhancements (00366243xA08F8) Department: Transportation Department Text of Legislative File CM -2016-1224 Consider executing Supplemental Contract No. 2 with Seiler Lankes Group, LLC for the 411 Main Street Proposed Enhancements Project. During the construction process it was determined that a retaining wall and an area of additional sidewalk was necessary to the projects completion. Supplemental #2 is for additional engineering fees associated with the design of a retaining wall and additional sidewalk. The additional engineering fee to be paid to Seiler Lankes Group is $5,315.52. $5,315.52 General Self -Financed Construction Staff recommends approval. City of Round Rock Page 1 Printed on 111412016