Loading...
CM-2016-1254 - 12/9/2016Page I of 5 It— Contract Quantity Adjustment/Change Order aouc rows rev, 01/16 Department: Utilities and Environmental Services Project Name: 2014 Wastewater Collection System Rehabilitation Date: 11/18/16 City Project Change Order/Quantity ID Number RHB14 Adjustment No. 1 Vendor IPR South Central LLC 7600 S. Sante Dr. Bldg. E - Houston, TX 77061 (832) 252-4804 Company Name Address Phone No. Justification :hange Order / Quantity Adjustment #1 is need for final bid items quantities adjustment and to increase contract time by 55 days due to veather delays and 1,200 LF of additional pipe bursting. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Submitted for Approval - Prepared 31ynaulre Contractor: City Project Manager: Mayor/City '- Manager ` J Approvals Ro�t2T �✓ior✓R!H /rho✓cCi /i'1G/L 1 Printed Narue,,Title, Company auk. — Printed N Name, Title Amount % Change $3,947,750.00 -$314,089.33 -$314,089.33 $3,633,660.68111 0% $0.00 0% $0.00 0% $3,633,660.68 -$314,089.33 300 55 355 Date " Contract Quantity Adjustment/ Change Order ��lry � �/ ROl1N� ROCK TI KA, rev, lf 01/16 Project Name: 2014 Wastewater Collection System Rehabilitation Quan. Adj./Change Order No.: Change Order Data Page 2 of 5 Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Days) $0.00 55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $0.00 55 ,_ Contract Quantity Adjustment/Change Order ROUND ROCK TFX>> rev, 01/16 Project Name: 2014 Wastewater Collection System Rehabilitation Quan. Adj./Change Order No. Ouantitv Adiustment Data Page 3 of 5 Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment 1 6" CIPP Liner LF 475 $50.00 $23,750.00 2 6" Dia. HDPE DR -11, IPS Sewer Pipe LF 278 $95.00 $26,410.00 3 8" Dia. PVC SDR 26 Sewer Pipe, 0'-8' Deep by open cut LF 357 $68.00 $24,276.00 4 8" Dia. PVC SDR 26 Pressure Rated Sewer Pipe, 0'-8' Deep by open cut LF -80 $76.50 -$6,120.00 5 8" Dia. PVC SDR 26 Sewer Pipe, 8'-12' Deep by open cut LF -70 $117.00 -$8,190.00 6 8" Dia. HDPE DR -11, IPS Sewer Pipe LF 1 -600 $105.00 -$63,000.00 7 8" Dia. HDPE DR -17, IPS Sewer Pipe LF 2833 $95.00 $269,135.00 8 8" CIPP Liner LF -582 $37.00 -$21,534.00 9 10"Dia. PVC SDR 26 Sewer Pipe, 0'-8' Deep by open cut LF -380 $112.00 -$42,560.00 10 10" Dia. HDPE DR -17, IPS Sewer Pipe LF 1 -9 $115.00 -$1,035.00 11 10" CIPP Liner LF -193.6 $55.00 -$10,648.00 12 18" Dia. HDPE DR -17, IPS Sewer Pipe LF -85 $165.00 -$14,025.00 13 15" CIPP Liner LF -16.6 $95.00 -$1,577.00 14 24" CIPP Liner LF -1613 $140.00 -$225,820.00 15 6" PVC Sewer Service Line (Main to Property Line) with service cleanout EA -27 $1,875.00 -$50,625.00 16 Service Line Extension LF -25 $118.00 -$2,950.00 17 Construct 48" Dia. Manhole 0'-6' Deep, Biotech Armor Additive EA 1 $6,500.00 $6,500.00 18 Construct Wastewater Access Device 0'-6' Deep EA 1 $4,450.00 $4,450.00 19 Remove and Replace 48" Dia. Manhole, 0'- 6' Deep Biotech Armor Additive EA -9 $6,800.00 -$61,200.00 20 Remove cleanout and replace with 48" Dia. Manhole, 0'-6' Deep Biotech Armor Additive EA 2 $6,850.00 $13,700.00 21 Remove cleanout and replace with Wastewate Access Device, 0'-6' Deep EA -4 $4,500.00 -$18,000.00 22 Remove and Replace 48" Dia. Manhole, Extra depth VF -29 $615.00 -$17,835.00 23 Remove and replace 48" Dia. Drop manhole, 0'-6' Deep EA -2 $7,100.00 -$14,200.00 24 Remove and replace 48" Dia. Drop manhole, Extra Depth VF -20 $695.00 -$13,900.00 25 lConnect to existing manhole EA 10 1 $2,825.001 $28,250.00 Page 4 of 5 Contract Quantity Adjustment/ Change Order - ROUND ROCK TC;(AS rev, 01116 26 Asphalt Street Pavement TN 18.44 $480.00 $8,851.20 27 Concrete Street Pavement SY -1000 $130.00 -$130,000.00 28 3,600 PSI Concrete Base SY -1000 $106.00 -$106,000.00 29 Remove and replace concrete curb and gutter repair LF -11 $117.00 -$1,287.00 30 Remove and replace concrete paving SF 897.5 $17.75 $15,930.63 31 Flowable Fill CY 600.5 $355.00 $213,177.50 32 Seeding/Sodding to match existing SY -540 $14.75 -$7,965.00 34 Tree removal EA -1 $765.00 -$765.00 35 Light Post Replacement EA -1 $2,950.00 -$2,950.00 36 Fence Repair, Remove and Replace to match existing LF -350 $47.00 -$16,450.00 37 Trench Safety LF 1992 $2.40 $4,780.80 38 Pre -Construction Video Documentation LF -112 $3.90 -$436.80 40 Waterline lowering EA 1 -$8,800.00 -$8,800.00 41 Traffic Control LS -0.05 $40,000.00 -$2,000.00 42 Point Repair prior to pipe bursting IF -50 $295.00 -$14,750.00 43 Point Repair to remove obstruction prior to Pipe Bursting EA 11 $5,400.00 $59,400.00 44 Erosion Control LS -0.05 $17,000.00 -$850.00 45 Replace manhole frame and cover - 24" non -bolted EA -5 $1,000.00 -$5,000.00 46 Replace manhole frame and cover - 32" non -bolted EA -2 $1,075.00 -$2,150.00 47 Replace cleanout frame and cover - Non - bolted paved 8" EA -2 $4,100.00 -$8,200.00 48 Replace cleanout frame and cover - Non - bolted paved 6" EA -2 $1,000.00 -$2,000.00 49 Replace manhole frame and cover - bolted 24" EA -1 $1,175.00 -$1,175.00 50 Replace manhole frame and cover - bolted 32" EA -2 $1,175.00 -$2,350.00 51 Replace cleanout frame and cover - bolted, non -paved, 6" EA -2 $4,100.00 -$8,200.00 52 Replace cleanout frame and cover - bolted, non -paved, 8" EA -1 $4,100.00 -$4,100.00 53 Install bolts & gaskets for bolt down covers EA -5 $295.00 -$1,475.00 54 Paved frame and grade adjustment EA -11 $765.00 -$8,415.00 55 Non -paved frame and grade adjustment EA -11 $650.00 -$7,150.00 56 Concrete manhole grade adjustments VF -10 $710.00 -$7,100.00 57 Pressure grout manhole JT -72 $325.00 -$23,400.00 58 Pressure grout pipe seal, bench, and trough and lower 18" of manhole VF -48 $645.00 -$30,960.00 59 Cementitious Manhole Chimney Seal VF -19 $112.00 -$2,128.00 60 Apply Cementitious Coating to Manhole VF -129.31 $115.00 -$14,870.65 61 Apply Epoxy Coating to Entire Manhole VF 97 $142.00 $13,774.00 62 Bench and trough reshaping to manhole EA -5 $710.00 -$3,550.00 63 Install cleanout plug EA 1 -3 1 $2,350.00 -$7,050.00 Page 5 of 5 Contract Quantity Adjustment/ Change Order ROUND ROCK TEKAS rev, 01/16 72 Job 1011: open cut and replace 10 LF of 6" PVC with 6" SDR 26 and 1 connection EA 1 $9,700.00 $9,700.00 73 Job 1012: open cut and replace 10 LF of 6" PVC with 6" SDR 26 and 1 connection EA 1 $9,700.00 $9,700.00 74 Additional pipe installed varying in diameter from 6" to 27" LF -40 $590.00 -$23,600.00 75 Bypass pumping for entire project LS -0.05 $125,000.00 -$6,250.00 78 Apply Cementitious Coating to 6" Dia. Manhole VF -14 $177.00 -$2,478.00 79 Remove and replace storm inlet and reconnect storm piping EA -1 $8,800.00 -$8,800.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 FOTAL5:1 -$314,089.331 0 1 N m r ch N U 0 c M - r�i N v U m N N O N N 00 O �t N pxw,gegai sAs loj MM gLoy\geyai sAs lob MM gLoz\l!ounoo\gLOnSdVW\aoedsWom se!liign+\SIE)—saoeds�poM\:0 :filed luawnoop Z 16 c d) w N 'o a CD 2)c � o = � U RS y L N 7 25� Q N 'O C° 3 i N W QJ City of Round Rock ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with IPR South Central, LLC for the 2014 Wastewater Collection System Rehabilitation Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 12/9/2016 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $314,089.33 Indexes: Self -Financed Wastewater Construction Attachments: LAF_CO-QANo.1_IPR_2013-2014VWVRehab_CM12.9.16.pdf, CO-QANo.1_IPR _2013-2014VWVRehab_CM12.9.16.pdf, Map_2014WWColISysRehab_CM12.9.16.pdf Department: Utilities and Environmental Services Text of Legislative File CM -2016-1254 Consider executing Quantity Adjustment/Change Order No. 1 with IPR South Central, LLC for the 2014 Wastewater Collection System Rehabilitation Project. The City is required to continue our Wastewater Collection System Rehabilitation program in order to comply with the TCEQ's Edwards Aquifer Recharge Zone Protection Program which requires that wastewater collection systems located over the Edwards Aquifer be inspected and rehabilitated every 5 years. The elimination of defects will not only help to protect the Edwards Aquifer, but will also reduce inflow and infiltration entering the City's wastewater collection system, thereby reducing the City's treatment cost. The City completed the inspection of 10 sub -basins to determine areas that required rehabilitation for this project. The work was performed in sub -basins BC21-Z, BC22-Z, BC23-Z, EW01-Z, OC27-Z, OC28-Z, OC29-Z, OC30-Z, OC31-Z, & OC46-Z. The project included 4,404 LF of new 8 -inch through 18 -inch pipe installed by pipe bursting, 3,273 LF of new 8 -inch through 10 -inch pipe installed by open excavation, 10 wastewater pipe point repairs, 10,617 LF of 6 -inch through 24 -inch CIPP liner, rehabilitation of 371 manholes and construction of eight manholes. IPR South Central LCC was awarded the contract in the amount of $3,947,750. This change order is required for final bid item quantity adjustments as well as to increase the contract time by 55 days due to weather delays. This CO/AQ No. 1 is for a reduction in contract price by $314,089.33. City of Round Rock Page 1 Printed on 1 21812 01 6