Loading...
CM-2016-1264 - 12/19/2016 Agent Authorization Form For Required Signature Edwards Aquifer Protection Program Relating to 30 TAC Chapter 213 Effective June 1, 1999 I AAf �Aill Print Name LI n01 Title - Owner/Presiders Other of CA4 Corporation/Partnership/Entity Name have authorized Nichoias G. Keir; Print Name of Agent/Engineer of Walker Partners Enaineers I Survev,)rs Print Name of Firm to represent and act on the behalf of the above named Corporation, Partnership, or Entity for the purpose of preparing and submittingthis Ian application to the Texas Commission on Environmental Quality (TCEQ) for threview and pa approval consideration of regulated activities. PP 9 I also understand that: 1. The applicant is responsible for compliance with 30 Texas Administrative Code Chapter 213 and any condition of the TCEQ's approval letter. The TCEQ is authorized to assess administrative penalties of up to $10,000 per day per violation. 2. For those submitting an application who are not the property owner, but who have the right to control and possess the property, additional authorization is required from the owner. 3. Application fees are due and payable at the time the application is submitted. The application fee must be sent to the TCEQ cashier or to the appropriate regional office. The application will not be considered until the correct fee is received by the commission. 4. A notarized copy of the Agent Authorization Form must be provided for the person preparing the application, and this form must accompany the completed application. 5. No person shall commence any regulated activity on the Edwards Aquifer Recharge q 9 Zone, Contributing Zone or Transition Zone until the appropriate application for the activity has been filed with and approved by the Executive Director. W-1 20[b. I2b4 TCEQ-0599(Rev.04/01/2010) Page 1 of 2 SIGNATURE PAGE: "Aaa,V��, /C �I h _ Applicant's Signature Date THE STATE OF f' 5 § County of 'O-Mso § BEFORE ME, the undersigned authority, on this day personally appeared known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that (s)he executed same for the purpose and consideration therein expressed. GIVEN under my hand and seal of office on this LC[4day of lewtber, o (�, \\0\u,IIIIIII/,////// ,,��/ \\\��``Gp N M: Ai, NOTARY BLIC SPRY Pie �2%,= MEA(AN A. SpiN kS Typed or Printed Name of Notary �0 F OF +A.'.?ao.... MY COMMISSION EXPIRES: 09- 0912\\���\� TCEQ-0599(Rev.04/01/2010) Page 2 of 2 City of Round Rock ROUND ROCK Agenda Item Summary Agenda Number: Title: Consider executing TCEQ "Agent Authorization Form For Required Signature Edwards Aquifer Protection Program RElating to 30 TAC Chapter 213" authorizing Nicholas G. Kehl to represent and act on behald of the City Reagrding the�ushy Creek Wastewater Line Upgrade Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 12/16/2016 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $650.00 Indexes: Self-Financed Wastewater Construction Attachments: TCEQ Agent Authorization Form.pdf, LAF_TCEQ_AgentAuthorization_CM 12.16.16.pdf Department: Utilities and Environmental Services Text of Legislative File CM-2016-1264 Consider executing TCEQ "Agent Authorization Form For Required Signature Edwards Aquifer Protection Program RElating to 30 TAC Chapter 213" authorizing Nicholas G. Kehl to represent and act on behald of the City Reagrding the Vrushy Creek Wastewater Line Upgrade Project. This contract will provide for the engineering design, bidding and construction phase services for the Brushy Creek Phase 5 Wastewater Improvements project. The wastewater line improvements consist of construction of approximately 600 linear feet of new 8-inch diameter wastewater main beginning just east of the intersection of Sunset Drive and Chisholm Trail Road heading west across Chisholm Trail Road into city-owned property. The line then turns south and runs through the city-owned property and joining an existing 8-inch wastewater line. This new line will replace a portion of an existing 6-inch clay tile wastewater line which runs north and south parallel to Chisholm Trail Road. This new line will not only be upsized and provide newer pipe materials for the area, but it will also reduce the likelihood of future road closures along Chisholm Trail Road by routing the flow away from the street. The portion of 6-inch line will be properly abandoned along Chisholm Trail Road. The City of Round Rock is required by the Texas Commission on Environmental Quality (TCEQ) to obtain an Organized Sewer Collection System (SCS) approval from City of Round Rock Page 1 Printed on 1211312016 Agenda Item Summary Continued(CM-2016-1264) TCEQ prior to conducting work over the Edwards Aquifer Recharge Zone (EARZ). The Brushy Creek Phase 5 Wastewater Improvements Project is located over the EARZ and as a result, the City must address the EARZ requirements. By the City executing the Agent Authorization form, this will authorize the City's consultant, Nichols Kehl of Walker Partners, LLC, to act as an agent to the City and submit the application for approval of the SCS for this project. Staff Recommends Approval. City of Round Rock Page 2 Printed on 1211312016