R-04-04-08-10F1 - 4/8/2004RESOLUTION NO. R -04-04-08-10F1 WHEREAS, the City of Round Rock has duly advertised for bids for the Downtown Streets, Phase I, Street Reconstruction Project, and WHEREAS, Chasco Contracting, Inc. has submitted the lowest and best bid, and WHEREAS, the City Council wishes to accept the bid of Chasco Contracting, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Chasco Contracting, Inc. for the Downtown Streets, Phase I, Street Reconstruction Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 8th day of April, 2004. T$T : AatItu• E. j)1 CHRISTINE R. MARTINEZ, City Secre ELL, Mayor City of Round Rock, Texas @PFDesktop\:: ODMA/WORLDOX/O:/WDOX/RESOLUTI/R40408F1.WPD/Sc Joe Bland Construction, L.P. Austin. TX Bid Bond Yes Addendums Yes 00 U C P.1 0 o0 O wt 69 69 O V 69 0 0 O -Ni 69 0 7 69 coo O W 69 0 p 7 69 0 V1 0.1 00 69 0 - 69 co v.-. ••-•rn oo" (n b N 69 $ 100.00 $ 39,700.00 ut v 0 0�o 64 $ 230.00 $ 8,050.00 $ 620.00 $ 1,240.00 $ 780.00 $ 1,560.00 O O 00 09 T 69 $ 1,306.00 $ 1,306.00 0 O 00 sv 0 N .- 69 0 O 00 v9 00 M d9 0 0 u9 O O N 69 0 0 M. en 69 0 0 O 69 0 0O rt 69 0 0 o 69 0 0 '01- 69 0 0 p N 69 C.C. Carlton Industries. Ltd. Austin, TX Bid Bond Yes Addendums Yes Unit Price Cost O 00 OO 69 O 69 0 0 Hi O O011 69o $ 200.00 $ 400.00 0 01 ^ Ni O y9 $ 4.00 $ 27,872.00 00 h O M y9 O r yl 0 0 0 N 0 N yg O 04 y $ 100.00 $ 3,500.00 $ 600.00 $ 1,200.00 $ 900.00 $ 1,800.00 $ 1,000.00 $ 14,000.00 100'008`1 $ 00008`1 $ 00 h 03 Vi 0 O 00N 69 $ 2,910.00 $ 2,910.00 $ 3,700.00 $ 25,900.00 $ 1,000.00 $ 3,000.00 $ 2,000.00 $ 6,000.00 $ 2,500.00 $ 5,000.00 Cash Construction Co. Pflugerville, TX Bid Bond Yes Addendums Yes 00 U L • C a 0 N OV1 b O 0 M 69 $ 150.00 $ 450.00 $ 100.00 $ 200.00 O 0 O -- 69 00 O 69 7 1 D 0w N N 69 O en M 69 $ 60.00 $ 23,820.00 O O V1 N_ 69 O6 71- y9 $ 200.00 $ 7,000.00 I $ 400.00 $ 800.00 $ 600.00 $ 1,200.00 $ 800.00 $ 11,200.00 $ 1,200.00 $ 1,200.00 $ 1,200.00 $ 40,800.00 $ 1,400.00 $ 1,400.00 00'009`LI $ 00005`Z $ 0 O 0 N 69 O O . 69 0 O O v .4 69 O O O h 69 $ 2,000.00 $ 4,000.00 Chasco Contracting Round Rock, TX Bid Bond Yes Addeo dums Yes Unit Price Cost oN U N 69 O 00 --. 69 00 0 0 63 0 0 0 69 0 0 69 0 0 O 69 $ 11.00 $ 385.00 00 ON '1 69 p V1 N 69 $ 58.00 $ 23,026.00 $ 39.00 $ 112,827.00 $ 143.00 $ 5,005.00 $ 376.00 $ 752.00 0 0 O O •9 0 0 0 V�1 69 0 O O N N 69 0 00 0 69 $ 1,400.00 $ 1,400.00 $ 770.00 $ 26,180.00 0 p p H9 p 0 O O 69 $ 2,500.00 $ 17,500.00 0 O 0 69 0 O p O 69 $ 1,000.00 $ 3,000.00 18 10" wet connection, complete in place I 2 EA I $ 1,200.00 $ 2,400.00 0.1nrin1-2-OR S-77 2,534 LF 3 EA W N 35 LF 0 00 00 00 a a N a w w w w w w w 3 EA 3 EA bc'o o z O . O W— . in ., N o C6 N U o 8 (0.. aq G m °' Pi 7 tl00 d 5 5 5 d 5 °' o .' E 0 o U V1 .5p O x F4 j u .5 -0 r — w °a b g a o �° b K y 00 10 OA O z -. °wa0.5 ox o.0 g 5 0 K o- 'O g V 78-b 0a 40a bo g v K 4'e, h0. 2 o o a N .5 A oo 5 OV 0 > 7 A m N Q. 1 00 . lu b" gate valve, with valve casing, complete in place 11 8" gate valve, with valve casing, complete in place 12 10" gate valve, with valve casing, complete in place 13 1" water services, all depths, including excavation and backfill, meter boxes and all appurtenances, complete in place 14 1-1/2" water services (dual), all depths, including excavation and backfill, meter boxes and all appurtenances, complete in 15 5-1/4" fire hydrant assembly including D.I. Lead, 6" gate valve with casing and all appurtenances, complete in place 10 2" wet connection, complete in place 17 6" wet connection, complete in place Joe Bland Construction, L.P. Austin TX Bid Bond Yes Addendums Yes (J N a O O 0 co M 49 0 0 O M 69 O 0 nco Vl 0 69 $ 4,700.00 $ 56,400.00 O vi O; 69 O vl $ 100.00 $ 115,000.00 $ 1,200.00 $ 3,600.00 $ 1,000.00 $ 32,000.00 00'005`l $ 00'005`1 $ 0 vi Vi O �/1 vl $ 65.00 $ 50,310.00 0 o N Vf O co vi 0 0 N Vi O vi Vl 0 0 01 Vi O O O— 6v 0 0 O Vi O O ^M' 69 0 O M Vf 0 O o M 68 0 o �D 69 0 O o M Vl 0 O M Vi 0 O o Vl Vl 0 0 O 68 0 O o Vt vl 0 0 I� N- 68 0 O O r 68 C.C. Carlton Industries, Ltd. Austin, TX Bid Bond Yes Addendums Yes Unit Price Cost $ 3,000.00 $ 3,000.00 0 0 co O 0 68 $ 4,800.00 $ 57,600.00 $ 111.00 $ 106,893.00 $ 128.00 $ 147,200.00 $ 2,500.00 $ 7,500.00 $ 4,470.00 $ 143,040.00 00'591`S $ 00'591`S $ O .M. N Vf O Vf O O 00 V ✓1 Vi 0 $ 80.00 $ 26,000.00 O O N vt N Vf 0 00 Vi $ 120.00 $ 23,520.00 $ 160.00 $ 13,280.00 $ 2,800.00 $ 2,800.00 $ 2,000.00 $ 4,000.00 $ 3,200.00 $ 22,400.001 0 0 0 co Vi 0 0 O V Vi O 0 O M Vi O 0 69 f+1 69 Cash Construction Co. Pflugerville, TX Bid Bond Yes Addendums Yes Unit Price Cost $ 3,000.00 $ 3,000.00 O Ory Vf $ 3,500.00 $ 42,000.00 O p Vl 0 V Vl O 00 V v 0 69 Vi O 0 h .-. Vl 0 O Vi $ 1,300.00 $ 41,600.00 00'00S`1 $ 00'00S1 $ O .M. •-,N N » 0 .-. Vi O 'O 7 vl 0 cf 69 Vi O yj N N .n 0 b Vf O b 0 N vl 0 ro di $ 110.00 $ 21,560.00 0 O b .. 69 0 pp Q Vl 0 O 0 68 0 O 01 69 $ 1,500.00 $ 3,000.00 $ 3,000.00 $ 21,000.00 $ 4,000.00 $ 8,000.00 00'000`S $ 00'000`S $ Chasco Contracting Round Rock, TX Bid Bond Yes Addendums Yes Unit Price Cost $ 2,200.00 $ 2,200.00 O �O NNN Vi 69 O Vi $ 2,300.00 $ 27,600.00 0 O Obi d' co 00 '0 69 0 b O OO h Vf $ 1,200.00 $ 3,600.00 $ 800.00 $ 25,600.00 0 O� Vi O fel N m Vt '"" Vf r O Vf 0 N 00i0 Vl O oh 0 Vf O O N M Vi O 'O 0 69 $ 130.00 $ 34,580.00 0 b oho — 69 0 0D W Vf $ 116.00 $ 9,628.00 0 O O .-. Vl 0 O Vf 0 O O .-. 68 0 O b Vf $ 2,400.00 $ 16,800.00 $ 3,600.00 $ 7,200.00 $ 3,600.00 $ 3,600.00 w "" a a w 0 N N M a M CT W a .-. w w a N a a a a a 1 EA w N 7 EA w N 37 15' curb inlet, complete in place I 1 EA CI. Ga C .. w � i0 x 0o 0 o T v ct a F 0 N O E W r3 I aJ -' '5 p .� c{ N 1 o U✓ i3 1 b ... N,.,S Pi CC Q — 4.3 <13 'a•A81 O 3 a oo .S .S N W o i•`C MI N 124 Q C si 4 E gi500 0 0 •O O o% .S N o F4 i 1 1.1 0.1 b b S .5 5 4� b0 N V R O .-. R Ifo ". .S ki 0 0 R 0 S e.(3`>'• KJ a S m a �¢ ° '3 v A N N 26 Wastewater services (Dual), all depths, inlcuding excavation and backfill, and all appurtenances, complete in place 27 Trench safety systems, all depths, complete in place FpI_, C7 i 28 18" RCP Class III, all depths, including excavation and backfill, complete in place 29 24" RCP Class III, all depths, including excavation and backfill, complete in place 30 30" RCP Class III, all depths, including excavation and backfill, complete in place 31 36" RCP Class III, all depths, including excavation and backfill, complete in place 32 42" RCP Class III, all depths, including excavation and backfill, complete in place 33 3' x 3' grate inlet, complete in place 34 Salvage & relocate existing grate inlets, including all appurtenances, complete in place 35 10' curb inlet, complete in place 36 10' curb inlet (Special), complete in place Joe Bland Construction, L.P. Austin. TX Bid Bond Yes Addendums Yes b Q C N $ 3,500.00 $ 3,500.00 $ 1,100.00 $ 1,100.00 $ 2,400.00 $ 2,400.00 Oo Do 69 o 0 N 69 $ 2,200.00 $ 2,200.00 O o N a7 69 O vl 63 $ 330.00 $ 3,960.00 o p .-. 69 O 0 O '. 69 o O N 69 0 0 O 69 0� 09° b N 69 O M 00 69 O b b 69 O 10 .-. 69 09- N b H 01 10 O 69 O b - 69 0 O 09 69 $ 4.60 $ 62,514.00 N 09 N 00 69 h 19 .-. 69 O o vl N 69 00 O 09 69 O 0 00 M N 69 0 N H1 69 O 0 09 N 0 69 0 O ,,nb 69 00 00 G 69 0 N 69 0 00 b '"' 69 0 N V9 0 0 00 o00 69 0 O b 69 C.C. Carlton Industries, Ltd. Austin, TX Bid Bond Yes Addendums Yes Unit Price Cost $ 4,000.00 $ 4,000.00 $ 1,800.00 $ 1,800.00 $ 2,400.00 $ 2,400.00 0 O N 69 O O M 69 00'000`9 $ 00'000`9 $ O 6V b .-. 69 O• " 69 O O N 69 O O N 69 0 O N 69 0 O .1. 69 on M [.. 69 b 69 O O 0 O N 69 0 O 69 0 O 0 O a 69 ,C'' ,.. 69 pp N (. A N 00 69 $ 15.00 $ 48,015.00 O O T 69 O 61 69 O O v0i 69 O O 69o O O V 00 69 O v1 69 0O 0 O 7 (A v0j 00 Vi $ 6.00 $ 12,330.00 O 'O '0 69 O 69 O 0 O 69 O O (A O O 00 00 69 O O 69 Cash Construction Co. Pflugerville, TX Bid Bond Yes Addendums Yes Unit Price Cost O O M 69 O o M 69 O O •-• 69 69 O ut •-• 69 O 69 $ 2,000.00 $ 8,000.00 O 0 O 69 O 69 M 69 6A O qq V N 69 Vi $ 1,000.00 $ 1,000.00 VOj O co 68 69 M N 69 OO b 69 0 000 V 69 00 69 $ 8.90 $ 52,848.20 000 0000 M 69 N OOO .- 69 0 Cr v) 00 69 69 0 O Nl N 69 OO 69 00 o0 01 M 69 M 69 $ 3.60 $ 2,682.00 O M 00 69 O 6A p 0 T N 61 69 O O EA 100 0 .-. 69 ON .. 69 O 00 69 O 00 69 Chasco Contracting Round Rock, TX Bid Bond Yes Addendums Yes Unit Price Cost $ 2,400.00 $ 2,400.00 $ 700.00 $ 700.00 $ 900.00 $ 900.00 0 O O 10 U 69 O O N 69 1 $ 3,000.00 $ 3,000.00 0 ul M N .. 6A r p 69 $ 180.00 $ 2,160.00 0 0 001 690 O 00 69 00 00 69 O 00 Vi 0 10 vMl 69 V 10 fA $ 8.10 $ 48,600.00 0 N en 69 Ooi 07 69 $ 12.20 $ 39,052.20 O U 69 O 01 69 O 00 6'1 "1.. 69 O 07 69 100 '10 00 cn 69 OM M 69 O 000 b N 69 b M 69 'nO N D\ 69 o v 7 69 $ 7.80 $ 40,146.60 O W b 69 0 O 10 69 N 00 O 69 V1 69 • uantit Unit 1 EA w w w w a .-. a w b N 69 N M 6,000 SY I >0 h CA vl 3,201 SY C 0 VIN 001 69 69 000 10 0\ '0 09 69 h O N a ti v1 a O 58 P.C. concrete ribbon curb 18", (fine 1,868 LF grading), complete in place . V 2 to d b U We na ... 00 ,D —e,i g ro ' cL o �• M Ri -. O U m. GL ami .5 a v o p+ N .r o 01 W 8 a _N 3 o b U xi pi 7 (1 .5 N R O "0 m � ro C] ' (]j 7 6s G 69 6 A o.5 °t GL o 0 o b V .. ,N 2 n. b y �, v u w a., F .5 V o g N a S. y CO 0 ' . a5i' 9 CL ts .5 c'pi 0 C Ev N 8 V a F. E. " Ap, O 0 ° ��+. U 6 $ 5 N .:4' t� U '°'� a ° g b �o 15 a 8 a '� ° ° ° N p G a fi3 y 4 47 12" flexible base, complete in place 48 15" flexible base, complete in place 49 16" flexible base, complete in place 50 20" flexible base, complete in place 51 Hot mix asphaltic concrete pavement, 2", Type D, complete in place 52 Melling 2", (Liberty St. Q Nelson), complete in place 53 P.C. concrete driveways (residential), complete in place 54 P.C. concrete driveways (commercial), complete in place 55 P.C. concrete valley gutter, complete in 56 P.C. concrete curb and gutter, (fine grading), complete in place 51 P.C. concrete laydown curb (fine grading), complete in place 0 O M Cq W a:10601-2-085-27 Joe Bland Construction, L.P. Austin. TX Bid Bond Yes Addendums Yes d 0.; o N 69 o M VI Vi 0 v , 69 N M 69 $ 4.10 $ 4,264.00 $ 120.00 $ 30,240.00 00005`LI $ 00'00L $ I o o O 49 0 O O 69 0 vi M 69 0 M ,r - 69 $ 175.00 $ 525.00 0 o V 69 0 0 400 N 69 $ 250.00 $ 3,250.00 0 0 69 0 O .-: Vi 0 0 69 0 O M 69 $ 285.00 $ 570.00 $ 650.00 $ 650.00 $211,000.00 $ 211,000.001 0 m 69 4 N Vi 0 O 69 4, a 69 $ 875.00 $ 875.00 $ 47.25 $ 756.00 $ 3,000.00 $ 3,000.00 $ 11.25 $ 1,991.25 C.C. Carlton Industries, Ltd. Austin, TX Bid Bond Yes Addendums Yes Unit Price Cost O 69 O M 69 O 69 O 0' 69 $ 4.00 $ 4,160.00 O 69 0 69 00'005`ZZ $ 00'006 $ l l$ 20,000.00 $ 20,000.00 00'005`L $ 00.005`L $ O O vl 49 0 (A $ 1,000.00 $ 2,000.00 $ 550.00 $ 7,150.00 O O O 69 Ov 69 00'0017`Z $ 00'009 $ $ 1,500.00 $. 3,000.00 $ 750.00 $ 750.00 $ 5,200.00 $ 5,200.00 $ 1,000.00 $ 7,000.00 O 0 O N 49 0 69 $ 500.00 $ 500.00 O so as 49 0 O st) 69 $ 2,000.00 $ 2,000.00 $ 20.00 $ 3,540.00 Cash Construction Co. Pflugerville, TX Bid Bond Yes Addendums Yes Unit Price Cost ,O 69 O h fJ 69 O et ON b 69 O p of 69 O O m fA O V M 69 O O 69 O o7 7 69 $ 620.00 $ 15,500.00 $15,000.00 $ 15,000.00 $ 4,000.00 $ 4,000.00 $ 200.00 $ 600.00 O (A p y $ 300.00 $ 3,900.00 $ 400.00 $ 2,000.00 $ 300.00 $ 1,200.00 $ 200.00 $ 400.00 $ 350.00 $ 350.00 00'000`95 $ 00'000`95$ 00'005`£ $ 00'005 $ $ 8.00 $ 4,320.00 $ 900.00 $ 900.00 $ 50.00 $ 800.00 O 0 M 69 O O O vl M Vf O M 69 O O N 69 Chasco Contracting Round Rock, TX Bid Bond Yes Addendums Yes Unit Price Cost O N O, 69 N M 69 O v 69 O vi 69 O O O 69 O 7 69 O p d 69 0 M V1 69 $ 480.00 $ 12,000.00 $17,800.00 $ 17,800.00 $ 4,600.00 $ 4,600.00 O di p po 69 $ 300.00 $ 600.00 $ 260.00 $ 3,380.00 $ 600.00 $ 3,000.00 $ 120.00 $ 480.00 $ 240.00 $ 480.00 $ 120.00 $ 120.00 O 69 O O 0 O 69 $ 280.00 $ 1,960.00 O V3 O vl v1 69 O 69 O O O o, O Vi O O O b9 $ 1,800.00 $ 1,800.00 O 69 O oo 69 Quantity Unit oc t N w a 1 LS 3 EA w N w w Ut w w N w .-. 1 LS w r- a a a 1 LS a Y A ° a p as 4, N r g E .- .c G .. 4^ ;n 13 Py g).1-'4AU ] U fi 4 3 o '0 7,3 A o, 'e t Y a y Sa t 1 S .5 7 .'' '0 U 0.S o 2 U 3 a: o0 O S 5 b U 3S e Y S YYQi� ' ' � a .S w V. . LI . N o • 0 U v w H.1 o a S �.B o' ... 4 $�U G mR. 'C4 x4 a 4, 4, 67 Stop sign 30" x 30", complete in place 68 Salvage & relocate traffic sign, complete it place 69 Adjustment of existing manhole ring & cover to finish grade, complete in place 70 Adjustment of existing valve casing to finish grade, complete in place 71 Adjustment of existing water meter to finish grde, complete in place 72 Adjustment of existing clean-out to finish grade, complete in place MISCELLANEOUS 73 Mobilization, complete in place 74 Capital Improvements Project sign, as shown on Sheet 2 of the construction plans, complete in place 75 Wood bollards with 3/8" cable, including all appurtenances, complete in place 76 2 - 6" steel pipe bollards, including chain, reflectorized safety yellow sign, lock, & all appurtenances, complete in place 77 Sch 40 galvanized steel handrail, including all appurenances, complete in place 78 Concrete steps, complete in place 79 4' chain linkfence, including all appurtenances, complete in place Joe Bland Construction, L.P. Austin, TX j/ d 5 b b b Unit Price Cost o o 0 49 O 43 $ 15.75 $ 1,370.25 $ 300.00 $ 300.00 O 0 0 S co 4f O 4, $ 17.05 $ 54,713.45 $ 18.50 $ 220,853.00 $ 22.29 $ 71,350.29 $ 2,123,285.05 $ 2,269,114.39 C.C. Carlton Industries, Ltd. Austin, TX Bid Bond Yes Addendums Yes V Yj Cm $ 750.00 $ 750.00 O O oo o Noc 4) O O 4) $ 25,000.00 $ 25,000.00 $ 7.00 $ 200,319.00 $ 19.00 $ 60,971.00 o O O N 69 0 .0 Vi O 00 4-1 O °' 49 0 N di h r 4 C V tz vi a .-0 ON - N 69 69 Cash Construction Co. Pflugerville, TX Bid Bond Yes Addendums Yes Unit Price Cost $ 785.00 $ 785.00 O ~ 4i O O N 4> $ 6,000.70 $ 6,000.70 46 69 O 41 4i O 000 '0 91 49 O 00 4i 0 v) .1- N 69 0 C6 O N 43 N so N OT 4i 0 N 0) N 49 $1,418,748.00 $1,627,312.00 Chasco Contracting Round Rock, TX Bid Bond Yes Addendums Yes Unit Price Cost o 00 43 o 0 4i 0 09 .- 43 0 0 00 $ 530.00 $ 530.00 O E6 m o o 69 0 0 09 49 O T m O 'o 69 000 00 N9 $ 20.40 $ 243,535.20 O 7 00 09 4f 0 7 N 49 $ 1,388,761.90 $ 1,579,964.95 Quantity Unit Cil '^ W r-� 09 N 3,209 SY 4) 00 61 .-. 3,201 SY TOTAL BASE BID (Items 1- 82): TOTAL ALTERNATE BID (Item 1 thru 45 & 51 thru 86 ): b 80 Gate for 4' chain link fence, including all appurtenances, complete in place 81 6' wood fence, including all appurtenances, complete in place 82 Basketball court chain link fence fabric, 2 — gates, including all appurenances, complete in place ALTERNATIVE BID 83 Unclasdified street excavation, including subgrade prep., grading —R.O.W., L.O.C., & temporary construction easements (Plan Quantity), complete in place 84 8" HMAC Base, Type A, complete in place 85 9" HMAC Base, Type A, complete in place 86 11" HMAC Base, Type A, complete in o:10601-2-085-27 �a1111111Min Not to Scale Downtown Streets Phase 1 Street Reconstruction ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. DATE: April 2, 2004 SUBJECT: City Council Meeting - April 8, 2004 ITEM: 10.F.1. Department: Staff Person: Justification: Consider a resolution authorizing the Mayor to execute a contract with Chasco Contracting for the Downtown Streets, Phase I, Street Reconstruction Project. (G.O. Bond Project) Engineering and Development Services Tom Word, Chief of Public Works Operations This project includes street reconstruction of Pecan Ave., Circle Ave, Parkway Ave., Black Street (from Circle Ave. to Austin Ave.), Lewis Street (from Pecan Ave. to Fannin Ave.), and Nelson St. (From Austin Ave. to Main St.). The Street reconstruction includes new roads with curb & gutters or ribbon curbs, new storm drainage system, new waterlines, and new wastewater lines. In addition, a new asphalt parking lot will be constructed at Veterans Park. Funding: Cost: $1,579,964.95 Source of funds: Capital Project Funds (G.O. Bond 2001) Outside Resources: Engineer : Baker Aicklen Contractor: Chasco Construction Background Information: On March 23, 2004, the City received four bids for the project, Chasco Construction is the low and the best bidder. City staff and the Engineer have reviewed the bids. Staff recommends the approval of the contract. Public Comment: N/A These streets were identified for reconstruction and were recommended by the Bond Task Force to be included in the Bond election approved by the citizens of Round Rock in November, 2001.