Loading...
R-2017-4118 - 1/26/2017RESOLUTION NO. R-2017-4118 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Austin Underground, Inc. for the Lake Creek 2 & Lake Creek 3 Wastewater Line Upgrade Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 2 to the Contract with Austin Underground, Inc. for the Lake Creek 2 & Lake Creek 3 Wastewater Line Upgrade Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 26th day of January, 2017. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: 1I Effl-1ME-Iffiffil►SARA L. WHITE, City Clerk 0112.1704;00370850 Contract Quantity Adjustment/ Change Order ev, 06/15 Department Utilities and Environmental Services Project Name: Lake Creek 2 & 3 Wastewater Line Upgrades Project City Project ID Number LI<CK2 / LKCK3 Justification EXHIBIT A„ Date: 12/30/16 Change Order/Quantil:y Adjustment No, 2 Change Order / Quantity Adjustment No. 2 is needed for final quantity adjustments, time extension due to weather delays and fiberglass manhole fabrication, and additional required services unforseen prior to commencement of construction. Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)): Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: 360 0 123 483 Amount 9,182.00 -$2,309.00 -$2,309.00 $2,516,873.001 $80,000.00 $92,105.15 $172,105.15 52,688,978.15 $169,796.15 Change 0.03 0.04 0.07 Signature Printed Name, Title Date Submitted for Approval Prepared B �_� �. ` P Y ,� ,,�, �/jl i Eddie Zapata, Project Manager 12/30/16 Signature ' Printed Name, Title, Company Date / Approvals Contractor: ( /% /�-v Richard Vavro, President, Austin Underground, Inc City Project Signature ,i a �I Printed Name, Title, Company Date Manager. !� _ Eddie Zapata, Project Manager % �f Signature / Printed Name, Title Date Mayor/City Signature Printed Name, Title Date Contract Quantity Adjustment/Change Order rev, OP15 Project Name: Lake Creek 2 & 3 Wastewater Line Upgrades Project Quan, Adj./Change Order No. riinnna (briar nn+n Page 2 of 3 Item a# Item Description Unit Qty. Unit Price Amount Contract Time Adjustment Adjusus(Das CO 2-1 Surveying realingment of proposed 36" wastewaterline at St. 32+76.91 LS 1 $1,564.00 $1,564.00 CO 2-2 Upsize wastewater service lateral from 4" to 6" EA 10 5345.00 $3,450.00 CO 2-3 Cement Stablized base in Lake Creek Circl due to subgrade issues TN 2543 $18.25 $46,109.75 CO 2-4 Additional haul -off, due to cement stablized base displacement CY 1272 $7.50 $9,540.00 CO 2-5 Additional HMAC in Lake Creek Circle due to subgrade issue TN 126.65 $161.00 $20,390.65 CO 2-6 Sprinkler systern repairs LS 1 $3,993.001 $3,993.00 CO 2-7 Concrete encasement for 16" waterline LF 26 $113.60 $2,953.60 CO 2-8 4" PVC LF 7 $510.00 $3,570.00 CO 2-9 JRemove existing 10" wastewater line LF 55 $31.50 $1,732.50 CO 2-10 IRelocate existing 8" waterline LF 60 $89.70 $5,382.00 CO 2-11 IRemove and reset manhole #18 LS 1 $6,034.00 $6,034.00 CO 2-12 Replace damaged boot for manhole #18 LS 1 5577.30 $577.30 CO 2-13 18" PVC & sleeve (material only) LS 1 $1,918.35 $1,918.35 CO 2-14 30" Fernco couplings (material only) LS 1 $1,475.00 51,475.00 CO 2-15 Credit for not installing filter fabric wrap around bedding envelope LS -1 $16,885.00 -$16,885.00 CO 2-16 Time extension for fiberolass manhole fabrication $0.00 90 CO 2-17 Time extension for rain delays $0.00 33 $0.00 $0.00 SOHO $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $92105.15 123 Contract Quantity Adjustment/Change Order rev, Q6/15 Project Name: Lake Creek 2 & 3 Wastewater Line Upgrades Project Quan. Adj./Change Order No. Quantity Adjustment Data Pase 3 oi'3 Contract Time Sid Item # Item Description Unit Qty, Unit Price Amount Adjustment Boring 48 -inch Steel Encasement - 1/2" 3 Thick Wall LF 15 $810.00 $12,150.00 Concrete Encasement for 36 -inch 4 Diameter Pipe LF 100 $220.00 $22,000.00 Remove Existing MH, Replace with 72" 9 Drop Precast Manhole EA -1 $10,000.00 -$10,000.00 11 Trench Safety LF 124 $3.00 $372.00 12 Pipe, 8 -inch Dia. PVC SDR LF 4 $610.00 $2,440.00 14 Pipe, 12 -inch Dia. PVC SDR LF 6 $510.00 $3,060.00 Abandonment of existing 12" wastewater 16 line LF -1272 $21.00 -$26,712.00 Abandonment of existing 15" wastewater 17 line LF -105 $66.00 -$6,930.00 Abandonment of existing 24" wastewater 18 line LF -3064 It 6.00 -$18,384.00 Abandonment of existing 30" wastewater 19 line LF -1673 $6.00 -$10,038.00 23 Remove existing 24" wastewater line LF 598 $34.00 $20,332.00 26 Reconnect service lateral - 4" pipe EA -18 $1,000.00 -$18,000.00 28 Native Seeding for Erosion Control AC —TY -1.98 $4,000.00 -$7,920.00 29 Soil Retention Blank Class 1 Type A 429 $74.00 $31,746.00 30 Protective Fencing Type A Chain Link LF 425 $3.001 1,275,00 Pipe, 30 -inch Dia. SN46 FRPM including 39 excavation and backfill LF 11 $180.00 $1,980,00 Pipe, 36 -inch Dia. SN46 FRPM including 40 excavation and backfill LF 2 5160.00 $320.00 50.00 $0.00 50.00 50.00 $0.00 $0,00 50.00 $0.00 TOTALS: -$2,309.0010