Loading...
Contract - Underground, inc. - 1/26/2017 Pagel of 3 Contract Quantity Adjustment/Change Order � ROlJNO ROCK rE%A, rev,06/15 Department: Utilities and Environmental Services Project Name: Lake Creek 2&3 Wastewater Line Upgrades Project Date: 12/30/16 City Project Change Order/Quantity ID Number LKCK2/ LKCK3 Adjustment No. 2 Justification Change Order/Quantity Adjustment No. 2 is needed for final quantity adjustments,time extension due to weather delays and fiberglass manhole fabrication, and additional required services unforseen prior to commencement of construction. SUMMARY Amount %Change Original Contract Price: $2,519,182.00 Previous Quantity Adjustment(s): This Quantity Adjustment: -$2,309.00 Total Quantity Adjustment(s): -$2,309.00 Total Contract Price with Quantity Adjustment(s): r $2,516,873.00 Previous Change Order(s): $80,000.00 0.03 This Change Order: $92,105.15 0.04 Total Change Order(s)To Date: $172,105.15 0.07 Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: $2,688,978.15 Difference between Original and Adjusted Contract Prices: $169,796.15 Original Contract Time: 360 Time Adjustment by previous Quan.Adj./Change Order: 0 Time Adjustment by this Quan.Adj./Change Order: 123 New Contract Time: 483 Submitted for Approval Prepared By: Eddie Zapata, Project Manager 12/30/16 Signature Printed Name,Title, Company Date Approvals Contractor: Richard Vavro, President,Austin Underground, Inc. G v/ Signaturiet , Printed Name,Title, Company D to City Project Manager: Eddie Zapata, Project Manager / 11c-) Signature Printed Name,Title D to Mayor/City V, Manager Y1 w Q ' ��– Signature Printed Name,Title Date 1,'W(�+— ((2) Page 2 of 3 Contract Quantity Adjustment/Change Order ROUND ROCK rLXAS rev,06/15 Project Name: Lake Creek 2&3 Wastewater Line Upgrades Project Quan. Adj./Change Order No.: 2 Change Order Data Contract Time Adjustment Item # Item Description Unit Qty. Unit Price Amount (Days) Surveying realingment of proposed 36" CO 2-1 wastewaterline at St. 32+76.91 LS 1 $1,564.00 $1,564.00 Upsize wastewater service lateral from 4" CO 2-2 to 6" EA 10 $345.00 $3,450.00 Cement Stablized base in Lake Creek Circl CO 2-3 due to subgrade issues TN 2543 $18.25 $46,409.75 Additional haul-off due to cement CO 2-4 stablized base displacement CY 1272 $7.50 $9,540.00 Additional HMAC in Lake Creek Circle due CO 2-5 to subgrade issue TN 126.65 $161.00 $20,390.65 CO 2-6 Sprinkler system repairs LS 1 $3,993.00 $3,993.00 CO 2-7 Concrete encasement for 16"waterline LF 26 $113.60 $2,953.60 CO 2-8 4" PVC LF 7 $510.00 $3,570.00 CO 2-9 Remove existing 10"wastewater line LF 55 $31.50 $1,732.50 CO 2-10 Relocate existing 8"waterline LF 60 $89.70 $5,382.00 CO 2-11 Remove and reset manhole#18 LS 1 $6,034.00 $6,034.00 CO 2-12 Replace damaged boot for manhole #18 LS 1 $577.30 $577.30 CO 2-13 18" PVC&sleeve(material only) LS 1 $1,918.35 $1,918.35 CO 2-14 30" Fernco couplings(material only) LS 1 $1,475.00 $1,475.00 Credit for not installing filter fabric wrap CO 2-15 around bedding envelope LS -1 $16,885.00 -$16,885.00 Time extension for fiberglass manhole CO 2-16 fabrication $0.00 90 CO 2-17 Time extension for rain delays $0.00 33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $92105.15 123 Page 3 of 3 Contract Quantity Adjustment/Change Order ROUND ROCH UXAs rev,06/15 Project Name: Lake Creek 2&3 Wastewater Line Upgrades Project Quan.Adj./Change Order No.: 2 Quantity Adjustment Data Contract Time Adjustment Bid Item # Item Description Unit Qty. Unit Price Amount Boring 48-inch Steel Encasement- 1/2" 3 Thick Wall LF 15 $810.00 $12,150.00 Concrete Encasement for 36-inch 4 Diameter Pipe LF 100 $220.00 $22,000.00 Remove Existing MH, Replace with 72" 9 Drop Precast Manhole EA -1 $10,000.00 -$10,000.00 11 Trench Safety LF 124 $3.00 $372.00 12 Pipe, 8-inch Dia. PVC SDR LF 4 $610.00 $2,440.00 14 Pipe, 12-inch Dia. PVC SDR LF 6 $510.00 $3,060.00 Abandonment of existing 12"wastewater 16 line LF -1272 $21.00 -$26,712.00 Abandonment of existing 15"wastewater 17 line LF -105 $66.00 -$6,930.00 Abandonment of existing 24"wastewater 18 line LF -3064 $6.00 -$18,384.00 Abandonment of existing 30"wastewater 19 line LF -1673 $6.00 -$10,038.00 23 Remove existing 24"wastewater line LF 598 $34.00 $20,332.00 26 Reconnect service lateral -4" pipe EA -18 $1,000.00 -$18,000.00 28 Native Seeding for Erosion Control AC -1.98 $4,000.00 -$7,920.00 29 Soil Retention Blank Class 1 Type A SY 429 $74.00 $311746.00 30 Protective Fencing Type A Chain Link LF 425 $3.00 $1,275.00 Pipe, 30-inch Dia. SN46 FRPM including 39 excavation and backfill LF 11 $180.00 $1,980.00 Pipe, 36-inch Dia. SN46 FRPM including 40 excavation and backfill LF 2 $160.00 $320.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: -$2,309.001 0 CERTIFICATE OF INTERESTED PARTIES FORM 1295 loll Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2017-151429 Austin Underground Inc Jonestown,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 0 110 612 0 1 7 being filed. The City Of Round Rock Date Acknowledged: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. Lake Creek 2&3 WW Upgrade 36"and smaller Wastewater Line upgrade in lake creek Nature of interest 4 Name of Interested Party City,State,Country(place of business) (check applicable) Controlling I Intermediary - 5 Check only if there is NO Interested Party. ❑ X 6 AFFIDAVIT I swear,or affirm,under enalty ury,that the above disclosure is true and correct. E'� � AARON STEVENS Notary Public STATE OF TEXAS Signature of authorized agent of contracting business entity �' My Comm.Exp.Oct.22,2019 AFFIX NOTARY STAMP/SEAL ABOVE Sworn to and subscribed before me,by the said this the lY day of 20 17 ,to certify which,witness my hand and seal of office. ze�A= A�w �w,5wSAeciuk-M-pr Signature of officer 6dministering oath Printed name of officer administering oath Title of officer administering oath Forms provided by Texas Ethics Commission wmrw.ethics.state.tx.us Version V1.0.277 CERTIFICATE OF INTERESTED PARTIES FORM 1295 1 of 1 7-7 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2017-151429 Austin Underground Inc Jonestown,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 01/06/2017 being filed. The City Of Round Rock Date Acknowledged: 01/10/2017 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. Lake Creek 2&3 WW Upgrade 36"and smaller Wastewater Line upgrade in lake creek Nature of interest 4 Name of Interested Party City,State,Country(place of business) (check applicable) Controlling I Intermediary 5 Check only if there is NO Interested Party. X 6 AFFIDAVIT I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct. Signature of authorized agent of contracting business entity AFFIX NOTARY STAMP/SEAL ABOVE Sworn to and subscribed before me,by the said this the day of 20 ,to certify which,witness my hand and seal of office. Signature of officer administering oath Printed name of officer administering oath Title of officer administering oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.277