O-88-2319 - 2/11/1988ORDINANCE NO. 2319
AN ORDINANCE AMENDING CHAPTER 3, SECTION 9, CODE OF
ORDINANCES, CITY OF ROUND ROCK, TEXAS BY DELETING SECTION 9
AND SUBSTITUTING REVISED FLOOD DAMAGE PREVENTION
REGULATIONS; PROVIDING A SAVINGS CLAUSE AND REPEALING
CONFLICTING ORDINANCES.
BE IT ORDAINED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS:
I.
That Chapter 3, Code of Ordinances, City of Round Rock, Texas,
is hereby amended by deleting Section 9 and substituting the
following:
SECTION 9: FLOOD DAMAGE PREVENTION REGULATIONS
A. STATUTORY AUTHORIZATION
The Legislature of the State of Texas has in Section 16.315,
Texas Water Code delegated the responsibility to local
governmental units to adopt regulations designed to minimize
flood losses. Therefore, City Council of the City of Round Rock,
Williamson County, Texas, does ordain as follows:
B. FINDINGS OF FACT
(1) The flood hazard areas of the City of Round Rock, Texas are
subject to periodic inundation which results in loss of
life and property, health and safety hazards, disruption of
commerce and governmental services, and extraordinary
public expenditures for flood protection and relief, all of
which adversely affect the public health, safety and
general welfare.
(2) These flood losses are created by the cumulative effect of
obstructions in floodplains which cause an increase in
flood heights and velocities, and by the occupancy of flood
hazard areas by uses vulnerable to floods and hazardous to
other lands because they are inadequately elevated,
floodproofed or otherwise protected from flood damage.
C. STATEMENT OF PURPOSE
It is the purpose of this section to promote the public health,
safety and general welfare and to minimize public and private
losses due to flood conditions in specific areas by provisions
designed to:
(1) Protect human life and health;
(2) Minimize expenditure of public money for costly flood
control projects;
(3) Minimize the need for rescue and relief efforts associated
with flooding and generally undertaken at the expense of
the general public;
(4) Minimize prolonged business interruptions;
(5) Minimize damage to public facilities and utilities such as
water and gas mains, electric, telephone and sewer lines,
streets and bridges located in floodplains;
C2OFLOODDA2
Help maintain a stable tax base by providing for the sound
use and development of flood -prone areas in such a manner
as to minimize future flood blight areas; and
Assist potential buyers in determining
property is located within a flood area.
D. METHODS OF REDUCING FLOOD LOSSES
whether or not
In order to accomplish its purposes, this section uses the
following methods:
Restrict or prohibit uses that are dangerous to health,
safety or property in times of flood, or cause excessive
increases in flood heights or velocities;
Require that uses vulnerable to floods, including
facilities which serve such uses, be protected against
flood damage at the time of initial construction;
Control the alteration of natural
channels, and natural protective
involved in the accommodation of flood
Control filling, grading, dredging
which may increase flood damage;
floodplains, stream
barriers, which are
waters;
and other development
Prevent or regulate the construction of flood barriers
which will unnaturally divert flood waters or which may
increase flood hazards to other lands.
E. DEFINITIONS
Unless specifically defined below, words or phrases used in this
section shall be interpreted to give them the meaning they have
in common usage and to give this section its most reasonable
application.
(5)
Appeal means a request for a review of the Flood Plain
Administrator's interpretation of any provision of this
section or a request for a variance.
Area of Special Flood Hazard means the land in the
floodplain within a community subject to a one percent or
greater chance of flooding in any given year. The area may
be designated as Zone A on the Flood Hazard Boundary Map
(FHBM), or on other maps that are adopted from time to time
by the City of Round Rock. After detailed ratemaking has
been completed in preparation for publication of the FIRM,
Zone A usually is refined into Zones A, AE, AH, AO, A1-99,
VO, V1-30, VE or V.
Base Flood means the flood having a one percent chance of
being equalled or exceeded in any given year.
Critical Feature means an integral and readily identifiable
part of a flood protection system, without which the flood
protection provided by the entire system would be
compromised.
Development means any man-made change in improved and
unimproved real estate, including but not limited to
buildings or other structures, mining, dredging, filling,
grading, paving, excavation or drilling operations.
(6) Elevated Building means a nonbasement building (i) built,
in the case of a building in Zones A1-30, AE, A, A99, AO,
AH, B, C, X, and D, to have the top of the elevated floor,
2.
(7)
(8)
(9)
or in the case of a building in Zones V1-30, VE, or V, to
have the bottom of the lowest horizontal structure member
of the elevated floor elevated above the ground level by
means of pilings, columns (posts and piers), or shear walls
parallel to the floor of the water and (ii) adequately
anchored so as not to impair the structural integrity of
the building during a flood of up to the magnitude of the
base flood. In the case of Zones A1-30, AE, A, A99, AO, AH,
B, C, X, D, "elevated building" also includes a building
elevated by means of fill or solid foundation perimeter
walls with openings sufficient to facilitate the unimpeded
movement of flood waters. In the case of Zones V1-30, VE,
or V, "elevated building" also includes a building
otherwise meeting the definition of "elevated building",
even though the lower area is enclosed by means of
breakaway walls if the breakaway walls meet the standards
of Section 60.3(e)(5) of the National Flood Insurance
Program regulations.
Existing Construction means for the purposes of determining
rates, structures for which the "start of construction"
commenced before the effective date of the FIRM or before
January 1, 1975, for FIRMs effective before that date.
"Existing construction" may also be referred to as
"existing structures."
Flood or Flooding means a general and temporary condition
of partial or complete inundation of normally dry land
areas from:
(a) the overflow of inland or tidal waters.
(b) the unusual and rapid accumulation or runoff of
surface waters from any source.
Flood Hazard Boundary Map (FHBM) means an official map of a
community on which the Federal Emergency Management Agency
has delineated the boundaries of the flood, mudslide (i.e.,
mudflow) related erosion areas having special hazards have
been designated as Zone A, M, and/or E.
(10) Floodplain or Flood -Prone Area means any land area
susceptible to being inundated by water from any source
(see definition of flooding).
(11) Flood Protection System means those physical structural
works for which funds have been authorized, appropriated,
and expended and which have been constructed specifically
to modify flooding in order to reduce the extent of the
areas within a community subject to a "special flood
hazard" and the extent of the depths of associated
flooding. Such a system typically includes hurricane tidal
barriers, dams, reservoirs, levees or dikes. These
specialized flood modifying works are those constructed in
conformance with sound engineering standards.
(12) Levee means a man-made structure, usually an earthen
embankment, designed and constructed in accordance with
sound engineering practices to contain, control, or divert
the flow of water so as to provide protection from
temporary flooding.
(13) Levee System means a flood protection system which consists
of a levee, or levees, and associated structures, such as
closure and drainage devices, which are constructed and
operated in accordance with sound engineering practices.
(14) Lowest Floor means the lowest floor of the lowest enclosed
ares (including basement). An unfinished or flood resistant
enclosure, usable solely for parking of vehicles, building
access or storage in an area other than a basement area is
not considered a building's lowest floor; provided that
3.
such enclosure is not built so as to render the structure
in violation of the applicable non -elevation design
requirement of Section 60.3 of the National Flood Insurance
Program regulations.
(15) Manufactured Home means a structure transportable in one or
more sections, which is built on a permanent chassis and is
designed for use with or without a permanent foundation
when connected to the required utilities. For flood plain
management purposes the term "manufactured home" also
includes park trailers, travel trailers, and other similar
vehicles placed on a site for greater than 180 consecutive
days. For insurance purposes the term "manufactured home"
does not include park trailers, travel trailers, and other
similar vehicles.
(16) Mean Sea Level means, for purposes of the National Flood
Insurance Program, the National Geodetic Vertical Datum
(NGVD) of 1929 or other datum, to which base flood
elevations shown on a community's Flood Insurance Rate Map
are referenced.
(17) New Construction means, for flood plain management
purposes, structures for which the "start of construction"
commenced on or after the effective date of a flood plain
management regulation adopted by a community.
(18) Start of Construction (for other than new construction or
substantial improvements under the Coastal Barrier
Resources Act (Pub. L. 97-348)), includes substantial
improvement and means the date the building permit was
issued, provided the actual start of construction, repair,
reconstruction, placement, or other improvement was within
180 days of the permit date. The actual start means either
the first placement of permanent construction of a
structure on a site, such as the pouring of slab or
footings, the installation of piles, the construction of
columns, or any work beyond the stage of excavation; or the
placement of a manufactured home on a foundation. Permanent
construction does not include land preparation, such as
clearing, grading and filling; nor does it include the
installation of streets and/or walkways; nor does it
include excavation for basement, footings, piers or
foundations or the erection of temporary forms; nor does it
include the installation on the property of accessory
buildings, such as garages or sheds not occupied as
dwelling units or not part of the main structure.
(19) Structure means a walled and roofed building, including a
gas or liquid storage tank, that is principally above
ground, as well as a manufactured home.
(20) Substantial Improvement means any repair, reconstruction,
or improvement of a structure, the cost of which equals or
exceeds 50% of the market value of the structure either,
(1) before the improvement or repair is started, or (2) if
the structure has been damaged and is being restored,
before the damage occurred. For the purpose of this
definition "substantial improvement" is considered to occur
when the first alteration of any wall, ceiling, floor, or
other structural part of the building commences, whether or
not that alteration affects the external dimensions of the
structure. The term does not, however, include either (1)
any project for improvement of a structure to comply with
existing state or local health, sanitary, or safety code
specifications which are solely necessary to assure safe
living conditions, or (2) any alteration of a structure
listed on the National Register of Historic Places or a
State Inventory of Historic Places.
4.
(21) Variance is a grant of relief to a person from the
requirements of this section when specific enforcement
would result in unnecessary hardship. A variance,
therefore, permits construction or development in a manner
otherwise prohibited by this section. (For full
requirements see Section 60.6 of the National Flood
Insurance Program regulations.)
(22) Violation means the failure of a structure or other
development to be fully compliant with the community's
flood plain management regulations. A structure or other
development without the elevation certificate, other
certifications, or other evidence of compliance required in
Section 60.3(b) (5) , (c) (4) , (c) (10) , (d) (3) , (e) (2) ,
(e)(4), or (e)(5) is presumed to be in violation until such
time as that documentation is provided.
(23) Water Surface Elevation means the height, in relation to
the National Geodetic Vertical Datum (NGVD) of 1929 (or
other datum, where specified), of floods of various
magnitudes and frequencies in the flood plains of coastal
or riverine areas.
F. LANDS TO WHICH THIS SECTION APPLIES
The section shall apply to all areas of special flood hazard
within the jurisdiction of the City of Round Rock, Texas.
G. BASIS FOR ESTABLISHING THE AREAS OF SPECIAL FLOOD HAZARD
The areas of special flood hazard identified by the Federal
Emergency Management Agency on its Flood Hazard Boundary Map
(FHBM), Community No. 481084, dated September 21, 1982, and any
revisions thereto are hereby adopted by reference and declared
to be a part of this section.
H. ESTABLISHMENT OF DEVELOPMENT PERMIT
A Development Permit shall be required to ensure conformance
with the provisions of this section.
I. COMPLIANCE
No structure or land shall hereafter be located, altered, or
have its use changed without full compliance with the terms of
this section and other applicable regulations.
J. ABROGATION AND GREATER RESTRICTIONS
This section is not intended to repeal, abrogate, or impair any
existing easements, covenants, or deed restrictions. However,
where this ordinance and another conflict or overlap, whichever
imposes the more stringent restrictions shall prevail.
K. INTERPRETATION
In the interpretation and application of this section, all
provisions shall be; (1) considered as minimum requirements; (2)
5.
liberally construed in favor of the governing body; and (3)
deemed neither to limit nor repeal any other powers granted
under State statutes.
L. WARNING AND DISCLAIMER OF LIABILITY
The degree of flood protection required by this section is
considered reasonable for regulatory purposes and is based on
scientific and engineering considerations. On rare occasions
greater floods can and will occur and flood heights may be
increased by man-made or natural causes. This section does not
imply that land outside the areas of special flood hazards or
uses permitted within such areas will be free from flooding or
flood damages. This section shall not create liability on the
part of the community or any official or employee thereof for
any flood damages that result from reliance on this ordinance or
any administrative decision lawfully made thereunder.
M. ADDITIONAL ENGINEERING STUDIES
The FHBM map described in Section B meets the minimum flood
plain requirements for the City of Round Rock and is primarily
for flood insurance purposes. The City of Round Rock reserves
the right to increase the areas of special flood hazard based on
other engineering studies or site specific studies.
N. DESIGNATION OF THE FLOODPLAIN ADMINISTRATOR
The Director of Public Works is hereby appointed the Floodplain
Administrator to administer and implement the provisions of this
section and other appropriate sections of 44 CFR (National Flood
Insurance Program Regulations) pertaining to flood plain
management.
O. DUTIES & RESPONSIBILITIES OF THE FLOODPLAIN ADMINISTRATOR
Duties and responsibilities of the Floodplain Administrator
shall include, but not be limited to, the following:
(1) Maintain and hold open for public inspection all records
pertaining to the provisions of this section.
(2) Review permit application to determine whether proposed
building site will be reasonably safe from flooding.
(3) Review, approve or deny all applications for development
permits required by adoption of this section.
(4) Review permits for proposed development to assure that all
necessary permtis have been obtained from those Federal,
State or local governmental agencies (including Section 404
of the Federal Water Pollution Control Act Amendments of
1972, 33 U.S.C. 1334) from which prior approval is
required.
(5)
Where interpretation is needed as to the exact location of
the boundaries of the areas of special flood hazards (for
example, where there appears to be a conflict between a
mapped boundary and actual field conditions) the Floodplain
Administrator shall make the necessary interpretation.
(6) Notify, in riverine situations, adjacent communites and the
State Coordinating Agency which is the Texas Water
6.
Commission, prior to any alteration or relocation of a
watercourse, and submit evidence os fuch notification to
the Federal Emergency Management Agency.
(7) Assure that the flood carrying capacity within the altered
or relocated portion of any watercourse is maintained.
(8) When base flood elevation data has not been provided in
accordance with Article 3, Section B, the Floodplain
Administrator shall obtain, review and reasonable utilize
any base flood elevation data and floodway data available
from a Federal, State or other source, in order to
administer the provisions of Article 5.
P. PERMIT PROCEDURES.
(1) Application for a Development Permit shall be presented to
the Floodplain Administrator on forms furnished by him/her
and may include, but not be limited to, plans in duplicate
drawn to scale showing the location, dimensions, and
elevation of proposed landscape alterations, existing and
proposed structures, and the location of the foregoing in
relation to areas of special flood hazard. Additionally,
the following information is required:
(a) Elevation (in relation to mean sea level), of the
lowest floor (including basement) of all new and
substantially improved structures;
(b) Elevation in relation to mean sea level to which any
nonresidential structure shall be floodproofed;
(c) A certificate from a registered professional engineer
or architect that the nonresidential floodproofed
structure shall meet the floodproofing criteria of
Article 5, Section B(2);
(d) Description of the extent to which any watercourse or
natural drainage will be altered or relocated as a
result of proposed development.
(e) Maintain a record of all such information in
accordance with Article 4, Section (B)B1).
(2) Approval or denial of a Development Permit by the
Floodplain Administrator shall be based on all of the
provisions of this section and the following relevant
factors:
(a) The danger to life and property due to flooding or
erosion damage;
(b) The susceptibility of the proposed facility and its
contents to flood damage and the effect of such damage
on the individual owner;
(c) The danger that materials may be swept onto other
lands to the injury of others;
(d) The compatibility of the proposed use with existing
and anticipated development;
(e) The safety of access to the property in times of flood
for ordinary and emergency vehicles:
(f) The costs of providing governmental services during
and after flood conditions including maintenance and
repair of streets and bridges, and public utilities
and facilities such as sewer, gas, electrical and
water systmes;
7.
(g)
The expected heights, velocity, duration, rate of rise
and sediment transport of the flood waters and the
effects of wave action, if applicable, expected at the
site;
(h) The necessity to the facility of a waterfront
location, where applicable;
(i)
(j)
The availability of alternative locations, not subject
to flooding or erosion damage, for the proposed use;
The relationship of the proposed use to the
comprehensive plan for that area.
Q. VARIANCE PROCEDURES
(1) The Development Review Board as established by the
community shall hear and render judgement on requests for
variances from the requirements of this section.
(2) The Development Review Board shall hear and render
judgement on an appeal only when it is alleged there is an
error in any requirement, decision, or determination made
by the Floodplain Administrator in the enforcement or
administration of this section.
Any person or persons aggrieved by the decision of the
Development Review Board may appeal such decision in the
courts of competent jurisdiction.
The Floodplain Administrator shall maintain a record of all
actions involving an appeal and shall report variances to
the Federal Emergency Management Agency upon request.
Variances may be issued for the reconstruction,
rehabilitation or restoration of structures listed on the
National Register of Historic Places or the State Inventory
of Historic Places, without regard to the procedures set
forth in the remainder of this section.
(6) Variances may be issued for new construction and
substantial improvements to be erected on a lot of one-half
acre or less in size contiguous to and surrounded by lots
with existing structures constructed below the base flood
level, providing the relevant factors in Section C(2) of
this Article have been fully considered. As the lot size
increases beyond the one-half acre, the technical
justification required for issuing the variance increases.
Upon consideration of the factors noted above and the
intent of this section, the Development Review Board may
attach such conditions to the granting of variances as it
deems necessary to further the purpose and objectives of
this section (Article 1, Section C).
(8) Variances shall not be issued within any designated
floodway if any increase in flood levels during the base
flood discharge would result.
(7)
(9) Prerequisites for granting variances:
(a) Variances shall only be issued upon a determination
that the variance is the minimum necessary,
considering the flood hazard, to afford relief.
(b) Variances shall only be issued upon, (i) showing a
good and sufficient cause; (ii) a determination that
failure to grant the variance would result in
exceptional hardship to the applicant, and (iii) a
determination that the granting of a variance will not
8.
result in increased flood heights, additional threats
to public safety, extraordinary public expense, create
nuisances, cause fraud on or victimization of the
public, or conflict with existing local laws or
ordinances.
(c) Any application to whom a variance is granted shall be
given written notice that the structure will be
permitted to be built with the lowest floor elevation
below the base flood elevation, and that the cost of
flood insurance will be commensurate with the
increased risk resulting from the reduced lowest floor
elevation.
(10) Variances may be issued by a community for new construction
and substantial improvements and for other development
necessary for the conduct of a functionally dependent use
provided that (i) the criteria outlined in Article 4,
Section D(1)-(9) are met, and (ii) the structure or other
development is protected by methods that minimize flood
damages during the base flood and create no additional
threats to public safety.
R. GENERAL STANDARDS
In all areas of special flood hazards the following provisions
are required for all new construction and substantial
improvements;
(1) All new construction or substantial improvements shall be
designed (or modified) and adequately anchored to prevent
flotation, collapse or lateral movement of the structure
resulting from hydrodynamic and hydrostatic loads,
including the effects of buoyancy;
(2) All new construction or substantial improvements shall be
constructed by methods and practices that minimize flood
damage;
(3) All new construction or substantial improvements shall be
constructed with materials resistant to flood damage;
(4) All new construction or substantial improvements shall be
constructed with electrical, heating, ventilation,
plumbing, and air conditioning equipment and other service
facilities that are designed andor located so as to prevent
water from entering or accumulating within the components
during conditions of flooding.
(5) All new and replacement water supply systems shall be
designed to minimize or eliminate infiltration of flood
waters into the system;
(6) New and replacement sanitary sewage systems shall be
designed to minimize or eliminate infiltration of flood
waters into the system and discharge from the systems into
flood waters; and,
On-site waste disposal systems shall be located to avoid
impairment to them or contamination from them during
flooding.
(7)
S. SPECIFIC STANDARDS
In all areas of special flood hazards where base flood elevation
data has been provided as set forth in (i) Article 3, Section B,
(ii) Article 4, Section B(8), or (iii) Article 5, Section C(4),
the following provisions are required:
9.
(1) RESIDENTIAL CONSTRUCTION - new construction and substantial
improvement of any residential structure shall have the
lowest floor (including basement), elevated to or above the
base flood elevation. A registered professional engineer,
architect, or land surveyor shall submit a certification to
the Floodplain Administrator that the standard of this
subsection as proposed in Article 4, Section C(1)a., is
satisfied.
(2) NONRESIDENTIAL CONSTRUCTION - new construction and
substantial improvements of any commercial, industrial or
other nonresidential structure shall either have the lowest
floor (including basement) elevated to or above the base
flood level or, together with attendent utility and
sanitary facilities, be designed so that below the base
flood level the structure is watertight with walls
substantially impermeable to the passage of water and with
structural components having the capability of resisting
hydrostatic and hydrodynamic loads and effects of byoyancy.
A registered professional engineer or architect shall
develop and/or review structural design, specifications,
and plans for the construction, and shall certify that the
design and methods of construction are in accordance with
accepted standards of practice as outlined in this
subsection. A record of such certification which includes
the specific elevation (in relation to mean sea level) to
which such structures are floodproofed shall be maintained
by the Floodplain Administrator.
(3)
MANUFACTURED HOMES
(a) Require that all manufactured homes to be placed
within Zone A, shall be installed using methods and
practices which minimize flood damage. For the purpose
of this requirement, manufactured homes must be
elevated and anchored to resist flotation, collapse,
or lateral movement. Methods of anchoring may include,
but are not limited to, use of over -the -top or frame
ties to ground anchors. This requirement is in
addition to applicable State and local anchoring
requirements for resisting wind forces.
(b) All manufactured homes shall be in compliance with
Article 5, Section B(1).
T. STANDARDS FOR SUBDIVISION PROPOSALS
(1) All subdivision proposals including manufactured home parks
and subdivisions shall be consistent with Article 1,
Sections B, C, and D of this section.
(2) All proposals for the development of subdivisions including
manufactured home parks and subdivisions shall meet
Development Permit requirements of Article 3, Section C;
Article 4, Section C; and the provisions or Article 5 of
this section.
(3)
Base flood elevation data shall be generated for
subdivision proposals and other proposed development
including manufactured home parks and subdivisions which is
greater than 30 lots or 3 acres, whichever is lesser, if
not otherwise provided pursuant to Article 3, Section B or
Article 4, Section B(8) of this section.
(4) All subdivision proposals including manufactured home parks
and subdivisions shall have adequate drainage provided to
reduce exposure to flood hazards.
10.
(5)
All subdivision proposals including manufactured home parks
and subdivisions shall have public utilities and facilities
such as sewer, gas, electrical and water systems located
and constructed to minimize or eliminate flood damage.
II.
A. All ordinances, parts of ordinances, or resolutions in
conflict herewith are expressly repealed.
B. The invalidity of any section or provision of this
ordinance shall not invalidate other section or provisions thereof
EAD and
of ✓ APPROVED on first reading this the �da
�.., 191'4 . Y
;READ, APPROVED and ADOPTED on second reading this the it
day
of , 19.
ATTEST:
A'ZJYL £/klJt
J7ANNE LAND, City Secretary
MIKE ROBIVNSON, Mayor
City of Round Rock, Texas
DATE: February 8, 1988
SUBJECT: Council Agenda, February 11, 1988
ITEM: 10A - Consider an ordinance amending the current
flood plain regulations. (Second Reading)
STAFF RESOURCE PERSON: Jim Nuse
STAFF RECOMMENDATION:
ECONOMIC IMPACT:
In order to remain in the FEMA Flood
Insurance Program, certain ordinance
adoptions must be made by Round Rock.
If the flood prone property is insurable,
then property values are generally increased
therefore a stronger tax base.