R-07-01-11-13D2 - 1/11/2007RESOLUTION NO. R -07-01-11-13D2 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ("Contract") with S.D. Kallman, LP for the Ray Berglund Area Development Project, and WHEREAS, S.D. Kallman, LP has submitted Supplemental Contract No. 1 to the Contract to modify the provisions for the scope of services, and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 1 with S.D. Kallman, LP, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Contract No. 1 to the Contract with S.D. Kallman, LP , a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this llth day of January 00 .otuvib, CHRISTINE R. MARTINEZ, City Secretary WE Mayor City of Round Rock, Texas 0:\wdox\RESOLUTI\R70111D2.WPD/rmc STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: S. D. Kallman, LP ("Engineer") ADDRESS: 1106 S. Mays, Suite 100, Round Rock, TX 78664 PROJECT: Ray Berglund Area Development Project This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and S.D. Kallman, LP, hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 27th day of August, 2004 for the Ray Berglund Area Development Project in the amount of $38,289.98; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $25,000.00 to a total of $63,289.98; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $25,000.00 the lump sum amount payable under the Contract for a total of $63,289.98, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract sdkallman; STO2DBCRK; 00108988 Rev.07/06/06 84275 S.D. KAL MAN, LP By: )6/al - 5fevj D / [lm24,1qt uarta 3 x007 Date CITY OF ROUND ROCK APPROVED AS TO FORM: By: Nyle Maxwell, Mayor Stephan L. Sheets, City Attorney Date Supplemental Contract sdkallman; STO2DBCRK; 00108988 2 Rev.07/06/06 84275 ADDENDUM TO EXHIBIT B Engineering Services The changes to the scope of this project are as follows: The scope of services to be performed by the Engineer is to facilitate the scope of services shown in Exhibit A, by performing the engineering studies & calculation, coordinating surveying, environmental studies & reports, coordinating platting procedure (including providing Original and Updated Abstract Certificates and Taxes Paid Certificate updates as required for platting reviews, and recordings), final design, and support construction services. Described as follows more specifically: GENERAL 1. The work effort and the management for the project included in this contract will be conducted in the Engineer's office in Round Rock, Texas. 2. The engineer will be readily accessible to the City of Round Rock staff and will meet with the City's project manager as necessary. 3. Monthly progress reports will be submitted, which will detail on-going work as well as work accomplished since the previous report. 4. When feasible, the City's standard drawings and specifications of previously approved special provisions/specifications will be utilized. 5. If a special provision or special specification must be developed under this contract, it shall be in the City's format, and to the extent possible, incorporate references to the City's approved test procedures. 6. The plan sheets will adhere in format and content to current City of Round Rock (CORR) standards. 7. The Engineer is fully responsible for any traffic control required from any data collection activities. 8. Survey work for platting shall be performed in accordance with the Texas Board of Professional Surveyors "Manual of Practice for Land Surveying in Texas". Category IA, Condition II. 9. Survey work for design and construction control shall be performed in accordance with the Texas Board of Professional Surveyors "Manual of Practice for Land Surveying in Texas", Category 2, Condition III. Construction staking shall be provided by construction contractor. PHASE I - PLATTING PHASE Engineering Services: 1. Preparation of three (3) final plats. 2. Preparation of three (3) utility schematics. 3. Preparation of three (3) drainage plans. 4. Submittal of three (3) final plats, utility schematics and drainage plans. 5. Representation at City Planning and Zoning Commission. 6. Meet with affected property owners and city staff. 7. Approval of three (3) final plats. 8. File the Plats at the County Court House. 9. Prepare, submit, and present all revised plats 10. Storm water hydrology, hydraulics, and drainage design of channel sections to convey up to the ultimate 100 -year storm through the Ray Berglund Subdivision. 1 PHASE I - PLATTING PHASE Sub -Contract Services: 1. Prepare field notes and exhibits for dedication statements. 2. Define easements of property rights and all rights-of-way. 3. Final plat lot and ROW calculations. 4. Field staking lot pins. 5. Develop a revised Preliminary Plat because of shareholder's changes. 6. Revise Final Plat for Ray Berglund because of shareholder's changes. 7. Revise Legal Descriptions for Ray Berglund Subdivision Plats. 8. Verify and supplement the lot pins for Ray Berglund Subdivision. Reimbursable Costs: 1. Provide updated Title Company Abstract Certificates. PHASE II - WATER, WASTEWATER, STREET AND DRAINAGE DESIGN PLANS AND SPECIFICATIONS PHASE - Engineering Services: 1. Prepare drainage area maps showing existing conditions and proposed improvements and submit for preliminary review. 2. Prepare hydraulic computations for culverts, channels, storm sewers and inlets. 3. Prepare hydraulic data sheets. 4. Develop storm sewer plan and profile and culvert cross-section sheets. 5. Develop miscellaneous drainage details. 6. Prepare Stormwater Pollution Prevention Plan (SW3P). 7. Prepare EPA Notice of Intent (NOI). 8. Prepare a narrative of the construction sequencing and time estimates. 9. Prepare bid quantities. 10. Prepare pre -design estimate after utility locations and determination of scope of work, final design estimate, specifications and general notes. 11. Prepare bidding documents and all copies for the bidding process. 12. Attend pre-bid conference. 13. Attend public bid opening. 14. Review bids received for completeness and accuracy. 15. Prepare detailed bid tabulations. 16. Make recommendation for bid award. 17. Prepare notice of award. 18. Prepare seven sets of final contract documents. 19. Revise Construction Plans for Ray Berglund "Rural Section" Roadway, Channels, and Drainage Culverts. 20. Prepare multiple bid proposals with base and alternative bids. 2 Sub -Contract Services: 1. Locate existing property corners and rights -of -points. 2. Locate and profile existing drainage facilities and cross section natural drainage features. 3. Locate existing marked underground and overhead utilities. 4. Set horizontal and vertical controls. 5. Set one permanent benchmark in each platted section. 6. Collect data using GPS equipment. 7. Additional field surveys to supplement hydrology, hydraulics, and design. PHASE II - WATER, WASTEWATER, STREET AND DRAINAGE SOCIAL, ECONOMIC, AND ENVIRONMENTAL STUDIES PHASE — Engineering Services: 1. Provide two persons to provide technical assistance at the public meetings scheduled by the City. 2. Provide two persons to participate in project meetings and resource agency meetings. 3. Coordinate with Sub -consultant and review historic structures studies. 4. Coordinate with Sub -consultant and review notification letter to the Texas Historical Commission Division of Antiquities. 5. Coordinate with Sub -consultant and review notification letter describing the scope and extent of wetlands on the project to the USCOE (Ecological Investigations). 6. Perform an Environmental Audit for hazardous materials impact in accordance with ASTM 7. Coordinate with Sub -consultant and review environmental documents. Sub -Contract Services: 1. Perform a records search and preliminary field reconnaissance for the presence of potentially eligible structures (Historic Structures Studies). 2. Send notification letter to the Texas Historical Commission Division of Antiquities Protection describing the scope and extent of project, to receive determination as to whether an archeological survey is required. 3. Send notification letter describing the scope and extent of wetlands on the project to the USCOE to receive confirmation that the scope of the proposed project falls within existing nationwide permits for stream crossings (Ecological Investigations). 4. Perform an Environmental Audit for hazardous materials impact in accordance with ASTM. 5. Prepare environmental documents under specified guidelines. PHASE III - CONSTRUCTION ADMINISTRATION Engineering Services: 1. Provide periodic construction inspection services to assure compliance with plans and specifications. 2. Attend construction meetings as requested by City. 3. Review and make recommendations to City on submittals, pay requests and change orders. 4. Punch list the project when contractor requests consideration for acceptance. 5. Sign off on completed punch list. 6. Prepare and submit a Plan of Record for the completed project. 7. Prepare EPA Notice of Termination (NOT). 8. Evaluate and make recommendations on all value -engineering submittals. Sub -Contract Services: 1. Setting controls on benchmarks. 3 ID Task Name Ray Berglund EXHIBIT C - Work Schedule - Addendum No. 1 (Predicated on Council Award — January 11, 2007) Ray Berglund Notice to Proceed (NTP) PLATTING PHASE Preliminary Plat FINAL PLAT Final Plat Iodate Shareholder Driven Mods NTP on Revisions Plat Field Survey Name Research CAD Mods PW Approval Duration 2007 c Jan Feb 1 2 3 21 22 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 71 72 73 74 75 76 77 78 79 80 81 82 83 84 87 92 93 94 95 96 97 98 99 100 101 102 103 104 105 Landowners Signature Abstract Certificates Submit Final Plat to P & Z Submital Planning Review Revision P & Z Agenda Tax Certifications Reproduction File in County Records DESIGN PHASE DESIGN TODATE w/ CURB GUTTER & STORM SEWER REVISION OF PLANS & SPECIFICATIONS NTP on Revisions Revision of D3WS — 90% PW Revision Review 100% D3WS PW 100% Review D3WS Final Corrections Revision of CDTS - 90% PW Revision Review 100% CDTS PW 100% Review CDTS Final Corrections Document Reproduction UTILITY LOCATES UTILITY ADJESTMENTS BIDDING Advertising Bidding S D K Recommendation PW Review & Approval Council Awards Project CORR Signs Contract CONSTRUCTION Setting Controls on Benchmarks Pre -Construction Conference & NT Construction S D K Acceptance Letter Plan of Record WARRANTY 1610 days 0 days 1215 days 438 days 772 days 207 days 25 days 0 days 15 days 5 days 5 days 2 days 470 days 10 days 60 days 0 days 15 days 5 days 40 days 2 days 10 days 5 days 1174 days 651 days 80 days 0 days 45 days 5 days 5 days 5 days 5 days 45 days 5 days 10 days 5 days 5 days 10 days 165 days 50 days 47 days 15 days 0 days 2 days 2 days 15 days 10 days 172 days 20 days 0 days 100 days 5 days 20 days 261 days 1 M 1 Apr 1 Ma 1 Jun 1 Jul 1 Auci 1 Sep J Oct 1 Nov 1 Dec /26 6118 1112 5 2008 Jan 9/19 7/11 �j5128 /18 o.,., a....a�...a n.- n...,,.i..........a An R1 AIT ..,..., %Ai .a 4nm7 ADDENDUM TO EXHIBIT D Fee Schedule HOURLY RATE SCHEDULE CLASSIFICATION SALARY RATE HOURLY RATE* PROFIT @ 10% TOTAL STANDARD RATE Principal and Registered $ 72.11 $ 216.33 $ 21.64 $ 237.97 Professional Engineer $ 156.75 Project Manager $ 95.21 $ 119.01 Senior Engineer $ 38.00 $ 114.00 $ 11.40 $ 125.40 Project Manager $ 28.85 $ 86.55 $ 8.66 $ 95.21 Engineer EIT $ 22.00 $ 66.00 $ 6.60 $ 72.60 Land Planner $ 20.00 $ 60.00 $ 6.00 $ 66.00 Design Technician $ 24.50 $ 73.50 $ 7.35 $ 80.85 Secretary $ 18.55 $ 55.65 $ 5.57 $ 61.22 ourly rates are based on salary costs with a 3.0 multiplier. EXPERT TESTIMONY, IF REQUIRED BY THE CITY MINIMUM 4 HOURS PER DAY CLASSIFICATION TOTAL STANDARD RATE TOTAL EXPERT TESTIMONY RATE* Principal and Registered Professional $ 237.97 $ 297.46 Engineer Senior Engineer $ 125.40 $ 156.75 Project Manager $ 95.21 $ 119.01 * Rates are based on "Total Standard Rate" with a 1.25 multiplier. ADDENDUM TO EXHIBIT D Fee Schedule Basic Services: PROJECT Item 1: Platting Phase • Preliminary Plats (3 Total); Work completed under original Engineering Services Agreement • Final Plats (3 Total) • Field Staking of Lot Pins • Develop a revised Preliminary Plat because of shareholder's changes. • Revise Final Plat for Ray Berglund because of shareholder's changes. • Prepare, submit, and present all revised plats • Storm water hydrology, hydraulics, and drainage design of channel sections to convey up to the ultimate 100 -year storm through the Ray Berglund Subdivision. • Additional field surveys to supplement hydrology, hydraulics, and design. • Provide updated Title Company Abstract Certificates, Williamson County Filing Fee and Miller Blueprint Fee • Revise Legal Descriptions for Ray Berglund Subdivision Plats. • Verify and supplement the lot pins for Ray Berglund Subdivision. Item 2: Design Phase — Water, Wastewater, Street and Drainage • Utility Schematics • Drainage Schematics • Field Design Surveys • Existing Utility Field Locations • Construction Drawings • Contract Documents and Technical Specifications • Revise Construction Plans for Ray Berglund "Rural Section" Roadway, Channels, and Drainage Culverts. • Prepare multiple bid proposals with base and alternative bids. Environmental — Social Economic, Environmental and Public Study • Perform a Records Search and Preliminary Field Reconnaissance for the Presence of Potentially Eligible Structures • Send notification letter to the Texas Historical Commission and USCOE • Perform an Environmental Audit for Hazardous Materials Impact and Prepare Environmental Documents • Bidding of Project • Award of Project and Pre -Construction Conference MILESTONE & ESTIMATED PERCENTAGES 100% Upon Contract Authorization 90% Upon Submission to City 10% Upon City Approval 100% Upon Completion $ 1,000.00 $ 5,000.00 $ 500.00 $ 2,000.00 $ 500.00 $ 2,000.00 90% Upon Submission to City 10% Upon City Approval 90% Upon Submission to City 10% Upon City Approval 100% Upon Completion 100% Upon Completion 50% Upon Submission of Preliminary Drawings to City 40% Upon Submission of Final Drawings to City 10% Upon City Approval 90% Upon Submission of Final Documents to City 10% Upon City Approval $14,000.00 100% Upon Completion 100% Upon Completion 100% Upon Completion 100% Upon Completion 100% Upon Completion ADDENDUM TO EXHIBIT D Fee Schedule PROJECT Item 3: Construction Administration Phase • Setting Controls on Benchmarks • Construction Administration Services MILESTONE & ESTIMATED PERCENTAGES 100% Upon Completion Monthly Based on Effort Required TOTAL COMPENSATION IN ORIGINAL AUTHORIZATION FOR BASIC SERVICES NOT TO EXCEED: SUB TOTAL COMPENSATION FOR ADDENDUM NO. 1 FOR BASIC SERVICES NOT TO EXCEED TOTAL REVISED COMPENSATION FOR BASIC SERVICES NOT TO EXCEED: $ 38,289.98 $ 25,000.00 $ 63,289.98 NOTE: Engineering costs have been estimated for each additional task and reimbursable items included in Addendum No. 1. Costs shall be interchangeable within each item as long as Addendum No. 1 compensation does not exceed $25,000.00. DATE: January 4, 2007 SUBJECT: City Council Meeting - January 11, 2007 ITEM: *13.D.2. Consider a resolution authorizing the Mayor to execute Supplemental Engineering Services Contract No. 1 with S.D. Kallman, LP for the Ray Berglund Area Development Project. Department: Engineering & Development Services Staff Person: Danny Halden, P.E., City Engineer Justification: Because the estimated construction costs associated with the current design exceed the available funds for the project, additional engineering services are required to revise the overall design. Also included in the supplemental contract will be services necessary for the subdivision plat modifications and processing. Funding: Cost: $25,000.00 Source of funds: 1998 G.O. Bond Outside Resources: S.D. Kallman, L.P. Background Information: The area known as the Ray Berglund Development Area was part of a December 13, 1984 City of Round Rock (CORR) annexation. Some time before that date, property within the area was divided and sold, without an official subdivision plat. Because the tracts are not legally platted, generally they do not have frontage on an existing public right-of-way, do not have water and wastewater service, nor are the properties eligible for water and wastewater service or building permits under the City's current code. In a 1998 bond election, voters approved funds to pursue the goal of rectifying this situation. During the ensuing years, the City attempted to get all of the property owners together to plat the entire area. Various property owners in the area hindered these efforts for assorted reasons. Construction costs have steadily increased since the commencement of this project and the available funds are no longer sufficient to proceed with the project that was originally conceived and currently designed. This past fall, the City approached the property owners with the thought of altering the design of the project to include a rural type roadway in lieu of a standard urban residential section, and possibly cutting back on the water, wastewater or drainage systems. While the property owners were not exactly thrilled with the rural section, they thought it would be acceptable but asked the City to try to identify funds to keep the basic water, wastewater and drainage systems improvements in the project. The City has identified some additional funds for the project and staff is ready to continue with the project upon approval of this resolution. Public Comment: N/A EXECUTED DOCUMENT FOLLOWS STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: S. D. Kallman, LP ("Engineer") ADDRESS: 1106 S. Mays, Suite 100, Round Rock, TX 78664 PROJECT: Ray Berglund Area Development Project This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and S.D. Kallman, LP, hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 27th day of August, 2004 for the Ray Berglund Area Development Project in the amount of $38,289.98; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $25,000.00 to a total of $63,289.98; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $25,000.00 the lump sum amount payable under the Contract for a total of $63,289.98, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract sdkallman; STO2DBCRK; 00108988 R -U'7 -0I-11- I3DL, Rev.07/06/06 84275 S.D. KAL MAN, LP By: 'IL—)t) )6(1/ 5fev&+ D. KaInv., ,,,, �C . u.ar 3, 01o07 Date 01-11-07 Date Supplemental Contract sdkallman; STO2DBCRK; 00108988 2 Step .i . Sheets, City ttorney Rev.07/06/06 84275 ADDENDUM TO EXHIBIT B Engineering Services The changes to the scope of this project are as follows: The scope of services to be performed by the Engineer is to facilitate the scope of services shown in Exhibit A, by performing the engineering studies & calculation, coordinating surveying, environmental studies & reports, coordinating platting procedure (including providing Original and Updated Abstract Certificates and Taxes Paid Certificate updates as required for platting reviews, and recordings), final design, and support construction services. Described as follows more specifically: GENERAL 1. The work effort and the management for the project included in this contract will be conducted in the Engineer's office in Round Rock, Texas. 2. The engineer will be readily accessible to the City of Round Rock staff and will meet with the City's project manager as necessary. 3. Monthly progress reports will be submitted, which will detail on-going work as well as work accomplished since the previous report. 4. When feasible, the City's standard drawings and specifications of previously approved special provisions/specifications will be utilized. 5. If a special provision or special specification must be developed under this contract, it shall be in the City's format, and to the extent possible, incorporate references to the City's approved test. procedures. 6. The plan sheets will adhere in format and content to current City of Round Rock (CORR) standards. 7. The Engineer is fully responsible for any traffic control required from any data collection activities. 8. Survey work for platting shall be performed in accordance with the Texas Board of Professional Surveyors "Manual of Practice for Land Surveying in Texas". Category 1A, Condition II. 9. Survey work for design and construction control shall be performed in accordance with the Texas Board of Professional Surveyors "Manual of Practice for Land Surveying in Texas", Category 2, Condition III. Construction staking shall be provided by construction contractor. PHASE I - PLATTING PHASE Engineering Services: 1. Preparation of three (3) final plats. 2. Preparation of three (3) utility schematics. 3. Preparation of three (3) drainage plans. 4. Submittal of three (3) final plats, utility schematics and drainage plans. 5. Representation at City Planning and Zoning Commission. 6. Meet with affected property owners and city staff. 7. Approval of three (3) final plats. 8. File the Plats at the County Court House. 9. Prepare, submit, and present all revised plats 10. Storm water hydrology, hydraulics, and drainage design of channel sections to convey up to the ultimate 100 -year storm through the Ray Berglund Subdivision. 1 PHASE I - PLATTING PHASE Sub -Contract Services: 1. Prepare field notes and exhibits for dedication statements. 2. Define easements of property rights and all rights-of-way. 3. Final plat lot and ROW calculations. 4. Field staking lot pins. 5. Develop a revised Preliminary Plat because of shareholder's changes. 6. Revise Final Plat for Ray Berglund because of shareholder's changes. 7. Revise Legal Descriptions for Ray Berglund Subdivision Plats. 8. Verify and supplement the lot pins for Ray Berglund Subdivision. Reimbursable Costs: 1. Provide updated Title Company Abstract Certificates. PHASE II - WATER, WASTEWATER, STREET AND DRAINAGE DESIGN PLANS AND SPECIFICATIONS PHASE - Engineering Services: 1. Prepare drainage area maps showing existing conditions and proposed improvements and submit for preliminary review. 2. Prepare hydraulic computations for culverts, channels, storm sewers and inlets. 3. Prepare hydraulic data sheets. 4. Develop storm sewer plan and profile and culvert cross-section sheets. 5. Develop miscellaneous drainage details. 6. Prepare Stormwater Pollution Prevention Plan (SW3P). 7. Prepare EPA Notice of Intent (NOI). 8. Prepare a narrative of the construction sequencing and time estimates. 9. Prepare bid quantities. 10. Prepare pre -design estimate after utility locations and determination of scope of work, final design estimate, specifications and general notes. 11. Prepare bidding documents and all copies for the bidding process. 12. Attend pre-bid conference. 13. Attend public bid opening. 14. Review bids received for completeness and accuracy. 15. Prepare detailed bid tabulations. 16. Make recommendation for bid award. 17. Prepare notice of award. 18. Prepare seven sets of final contract documents. 19. Revise Construction Plans for Ray Berglund "Rural Section" Roadway, Channels, and Drainage Culverts. 20. Prepare multiple bid proposals with base and alternative bids. 2 Sub -Contract Services: 1. Locate existing property corners and rights -of -points. 2. Locate and profile existing drainage facilities and cross section natural drainage features. 3. Locate existing marked underground and overhead utilities. 4. Set horizontal and vertical controls. 5. Set one permanent benchmark in each platted section. 6. Collect data using GPS equipment. 7. Additional field surveys to supplement hydrology, hydraulics, and design. PHASE II - WATER, WASTEWATER, STREET AND DRAINAGE SOCIAL, ECONOMIC, AND ENVIRONMENTAL STUDIES PHASE — Engineering Services: 1. Provide two persons to provide technical assistance at the public meetings scheduled by the City. 2. Provide two persons to participate in project meetings and resource agency meetings. 3. Coordinate with Sub -consultant and review historic structures studies. 4. Coordinate with Sub -consultant and review notification letter to the Texas Historical Commission Division of Antiquities. 5. Coordinate with Sub -consultant and review notification letter describing the scope and extent of wetlands on the project to the USCOE (Ecological Investigations). 6. Perform an Environmental Audit for hazardous materials impact in accordance with ASTM 7. Coordinate with Sub -consultant and review environmental documents. Sub -Contract Services: 1. Perform a records search and preliminary field reconnaissance for the presence of potentially eligible structures (Historic Structures Studies). 2. Send notification letter to the Texas Historical Commission Division of Antiquities Protection describing the scope and extent of project, to receive determination as to whether an archeological survey is required. 3. Send notification letter describing the scope and extent of wetlands on the project to the USCOE to receive confirmation that the scope of the proposed project falls within existing nationwide permits for stream crossings (Ecological Investigations). 4. Perform an Environmental Audit for hazardous materials impact in accordance with ASTM. 5. Prepare environmental documents under specified guidelines. PHASE III - CONSTRUCTION ADMINISTRATION Engineering Services: 1. Provide periodic construction inspection services to assure compliance with plans and specifications. 2. Attend construction meetings as requested by City. 3. Review and make recommendations to City on submittals, pay requests and change orders. 4. Punch list the project when contractor requests consideration for acceptance. 5. Sign off on completed punch list. 6. Prepare and submit a Plan of Record for the completed project. 7. Prepare EPA Notice of Termination (NOT). 8. Evaluate and make recommendations on all value -engineering submittals. Sub -Contract Services: 1. Setting controls on benchmarks. 3 Ray Berglund EXHIBIT C - Work Schedule - Addendum No. 1 (Predicated on Council Award — January 11, 2007) ID Task Name Duration 2007 2008 Den Jan I Feb I Mar I Apr I Ma I Jun I Jul I Au q I Sep I Oct I Nov I Dec Jan o Ray Berglund 1610 days Notice to Proceed (NTP) 0 days PLATTING PHASE 1215 days Preliminary Plat 438 days FINAL PLAT 772 days Final Plat Todate 207 days Shareholder Driven Mods 25 days LS NTP on Revisions 0 days n Plat Field Survey 15 days Name Research 5 days CAD Mods 5 days PW Approval 2 days • Landowner's Signature 470 days Abstract Certificates 10 days Submit Final Plat to P & 2 60 days Submital 0 days Planning Review 15 days Revision 5 days P & Z Agenda 40 days Tax Certifications 2 days Reproduction 10 days File in County Records 5 days 21 . rillin. X7112 jir 22 28 29 r _ 31 33 34 35 36 6/18 3f26 37 ♦ 38 39 40 N► 41 42 43 44 DESIGN PHASE 1174 days DESIGN IODATE wl CURB 651 days GUTTER & STORM SEWER REVISION OF PLANS & 80 days SPECIFICATIONS 'a, NTP on Revisions 0 days Revision of D3WS - 90% 45 days PW Revision Review 5 days 100% D3WS 5 days PW 100%Review 5 days D3WS Final Corrections 5 days a Revision of CDTS - 90% 45 days PW Revision Review 5 days 100% CDTS 10 days PW 100% Review 5 days CDTS Final Corrections 5 days Document Reproduction 10 days UTILITY LOCATES 165 days UTILITY ADJESTMENTS 50 days BIDDING 47 days Advertising 15 days Bidding 0 days S D K Recommendation 2 days PW Review & Approval 2 days Council Awards Project 15 days CORR Signs Contract 10 days CONSTRUCTION 172 days Setting Controls on Benchmarks 20 days Pre -Construction Conference & NT 0 days Construction 100 days S D K Acceptance Letter 5 days Plan of Record 20 days WARRANTY 261 days , 45 71 1/12 72 73 .—■ '■ 1 , ■ ; 74 75 76 77 78 ■ L80 ■■ '■ ,■ ■ 79 81 82 83 84 87 9119 92 ■ 5/28 7111 93 94 95 96 97 98 99 100 I I L-1 118 101 102 103 104 105 os., a....a....a nAn SI ? nrro ...,.., 1A/...4 1141,17 ADDENDUM TO EXHIBIT D Fee Schedule HOURLY RATE SCHEDULE CLASSIFICATION SALARY RATE HOURLY RATE* PROFIT @ IO% TOTAL STANDARD RATE Principal and Registered $ 72.11 $ 216.33 $ 21.64 $ 237.97 Professional Engineer Senior Engineer $ 38.00 $ 114.00 $ 11.40 $ 125.40 Project Manager $ 28.85 $ 86.55 $ 8.66 $ 95.21 Engineer EIT $ 22.00 $ 66.00 $ 6.60 $ 72.60 Land Planner $ 20.00 $ 60.00 $ 6.00 $ 66.00 Design Technician $ 24.50 $ 73.50 $ 7.35 $ 80.85 Secretary $ 18.55 $ 55.65 $ 5.57 $ 61.22 * Hourly rates are based on salary costs with a 3.0 multiplier. EXPERT TESTIMONY, IF REQUIRED BY THE CITY MINIMUM 4 HOURS PER DAY CLASSIFICATION TOTAL STANDARD RATE TOTAL EXPERT TESTIMONY RATE* Principal and Registered Professional Engineer Senior Engineer Project Manager $ 237.97 $ 125.40 $ 95.21 $ 297.46 $ 156.75 $ 119.01 * Rates are based on "Total Standard Rate" with a 1.25 multiplier. ADDENDUM TO EXHIBIT D Fee Schedule Basic Services: PROJECT Item 1: Platting Phase • Preliminary Plats (3 Total); Work completed under original Engineering Services Agreement • Final Plats (3 Total) • Field Staking of Lot Pins • Develop a revised Preliminary Plat because of shareholder's changes. • Revise Final Plat for Ray Berglund because of shareholder's changes. • Prepare, submit, and present all revised plats • Storm water hydrology, hydraulics, and drainage design of channel sections to convey up to the ultimate 100 -year storm through the Ray Berglund Subdivision. • Additional field surveys to supplement hydrology, hydraulics, and design. • Provide updated Title Company Abstract Certificates, Williamson County Filing Fee and Miller Blueprint Fee • Revise Legal Descriptions for Ray Berglund Subdivision Plats. • Verify and supplement the lot pins for Ray Berglund Subdivision. Item 2: Design Phase — Water, Wastewater, Street and Drainage • Utility Schematics • Drainage Schematics • Field Design Surveys • Existing Utility Field Locations • Construction Drawings • Contract Documents and Technical Specifications • Revise Construction Plans for Ray Berglund "Rural Section" Roadway, Channels, and Drainage Culverts. • Prepare multiple bid proposals with base and alternative bids. Environmental — Social Economic, Environmental and Public Study • Perform a Records Search and Preliminary Field Reconnaissance for the Presence of Potentially Eligible Structures • Send notification letter to the Texas Historical Commission and USCOE • Perform an Environmental Audit for Hazardous Materials Impact and Prepare Environmental Documents • Bidding of Project • Award of Project and Pre -Construction Conference MILESTONE & ESTIMATED PERCENTAGES 100% Upon Contract Authorization 90% Upon Submission to City 10% Upon City Approval 100% Upon Completion $ 1,000.00 $ 5,000.00 $ 500.00 $ 2,000.00 $ 500.00 $ 2,000.00 90% Upon Submission to City 10% Upon City Approval 90% Upon Submission to City 10% Upon City Approval 100% Upon Completion 100% Upon Completion 50% Upon Submission of Preliminary Drawings to City 40% Upon Submission of Final Drawings to City 10% Upon City Approval 90% Upon Submission of Final Documents to City 10% Upon City Approval $14,000.00 100% Upon Completion 100% Upon Completion 100% Upon Completion 100% Upon Completion 100% Upon Completion ADDENDUM TO EXHIBIT D Fee Schedule PROJECT Item 3: Construction Administration Phase • Setting Controls on Benchmarks • Construction Administration Services MILESTONE & ESTIMATED PERCENTAGES 100% Upon Completion Monthly Based on Effort Required TOTAL COMPENSATION IN ORIGINAL AUTHORIZATION FOR BASIC SERVICES NOT TO EXCEED: $ 38,289.98 SUB TOTAL COMPENSATION FOR ADDENDUM NO. 1 FOR BASIC SERVICES NOT TO EXCEED $ 25,000.00 TOTAL REVISED COMPENSATION FOR BASIC SERVICES NOT TO EXCEED: $ 63,289.98 NOTE: Engineering costs have been estimated for each additional task and reimbursable items included in Addendum No. 1. Costs shall be interchangeable within each item as long as Addendum No. 1 compensation does not exceed $25,000.00.