Loading...
CM-2017-1319 - 2/17/2017SUPPLEMENTAL AGREEMENT NO. 1 TO "CITY OF ROUND ROCK AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES FOR CONSTRUCTION MATERIALS TESTING SERVICES WITH FUGRO CONSULTANTS, INC." CITY OF ROUND ROCK § STATE OF TEXAS § COUNTY OF TRAVIS § COUNTY OF WILLIAMSON § KNOW ALL BY THESE PRESENTS: THIS SUPPLEMENTAL AGREEMENT NO. 1 to "City of Round Rock Agreement for Professional Consulting Services for Construction Materials Testing Services with Fugro Consultants, Inc.," hereinafter called "Supplemental Agreement No. 1," is made by and between the City of Round Rock, Texas, a home -rule municipality, hereinafter called the "City" and Fugro Consultants, Inc., hereinafter called the "Consultant." WHEREAS, the City and Consultant executed the referenced "City of Round Rock Agreement for Professional Consulting Services for Construction Materials Testing Services," hereinafter called the "Agreement," on August 27, 2015 by Resolution No. R-2015-2751; and WHEREAS, the City desires to amend the Scope of Services to add additional services related to construction materials testing for the Creek Bend Extension Project; and WHEREAS, it is necessary to amend the Scope of Services, the Fee and the Term of services provided in the Agreement; NOW THEREFORE, in consideration of the mutual promises and obligations in the Agreement and this Supplemental Agreement No. 1, the City and Consultant agree that said Agreement is amended and supplemented as follows: I. Section 1.01 of the Agreement is hereby amended to read as follows: 1.01 EFFECTIVE DATE, DURATION, AND TERM This Supplemental Agreement No. 1 shall be effective on the date this Agreement has been signed by each party hereto, and shall remain in full force and effect until it expires by operation of the term indicated herein, or is terminated or extended as provided herein. 0372280/ss2 The term of this Agreement shall be until full and satisf ^*^r5, eempletion of the work speeified herein is ehie ,oa expire on March 31, 2017. II. Section 3.01 of the Agreement is hereby amended to read as follows: 3.01 SCOPE OF SERVICES Consultant shall satisfactorily provide all services described herein and as set forth in Exhibit "A" and the Addendum to Exhibit "A," which document is incorporated herein for all purposes. Consultant's undertaking shall be limited to performing services for the City and/or advising City concerning those matters on which Consultant has been specifically engaged. Consultant hall perform services in accordance with this Agreement, in accordance with the appended proposal for services and addendum to proposal for services, and in a professional and workmanlike manner. Section 5.01 of the Agreement is hereby amended to read as follows: 5.01 CONTRACT AMOUNT In consideration for professional consulting services to be performed by Consultant, City agrees to pay Consultant in Accordance with Exhibit "B" entitled "Fee Schedule," and the Addendum to Exhibit "A," which documents }s are attached hereto and incorporated herein for all purposes, in payment for services and the Scope of Services deliverables as delineated in Exhibit "A" and the Addendum to Exhibit "A." Not -to -Exceed Total Payment for Services: Consultant's total compensation for consulting services hereunder shall not exceed Ninety Three Thousand Six Hundred Sixty Two and 10/100 Dollars ($93,662.10) One Hundred Eighteen Thousand Nine Hundred Fifty -One and 35/100 Dollars ($118,951.35). IV. This Supplemental Agreement No. 1 shall amend the original Agreement only as set forth herein with no other changes in terms or conditions of the original Agreement. 2 IN WITNESS WHEREOF, the City and Consultant have executed this Supplemental Agreement to be effective as of the last date of due execution by both parties. CITY OF ROUND ROCK, TEXAS By: Printed Name �'�'s1<'S'- Title: Date Signed: �-) 7,ll ATTEST: By: . Sara L. White, City Clerk FOR CITY, PPROVED AS TO FORM: By: Stephan 1�. Sheets, City Attorney FUGRO CONSULTANTS, INC. By: Printed Name: LA V,),) ./� .-ht,1::(wNi Title: P&iIb Date Signed: FUGRO CONSULTANTS, INC. ADDENDUM TO EXHIBIT "A" City of Round Rock Texas Transportation Department 2008 Enterprise Dr. Round Rock, TX 78664 Attention: Ms. Leah Collier Email: Icollier(o)roundrocktexas.gov Introduction 8613 Cross Park Drive Austin, Texas 78754 Phone: 512-977-1800 Fax: 512-973-9966 Project No. 04.30152018 December 20, 2016 Construction Materials Testing Services -SUPPLEMENTAL Creek Bend Extension Round Rock, Texas We are pleased to submit this proposal for providing on-site construction materials testing services for the above referenced project. Project plans and specifications were available for our review. In addition, Fugro provided geotechnical design services on this project (refer to Fugro Report No. 04.30111086, dated July 14, 2014). In general, the project includes construction of a bridge over Brushy Creek (463 ft long), an extension of Creek Bend Blvd (3,838 ft long), new retaining walls, utilities and associated appurtenances. The project is located between the south end of the existing Creek Bend Blvd and the intersection of existing Brightwater Dr. and Wyoming Springs Dr. in Round Rock, Texas. In this proposal we present a scope of services, a fee estimate and unit price schedules. Scope of Services Based upon our knowledge of the project, and our past experience with similar projects, we present our proposed scope of services in the following paragraphs. We anticipate that our scope of services will consist of: ■ Earthwork Testing; ■ Drilled Pier Observation; ■ Concrete Reinforcing Steel Observation; ■ Anchor Bolt Inspection; ■ Concrete Testing; A member of the Fugro group of companies with offices throughout the world. City of Round Rock, Texas ADDENDUM TO December 20, 2016 Ms. Leah Collier Page 2 of 6 EXHIBIT "A" Asphalt Testing. For placement and compaction of fill, backfill, natural subgrade, and pavement base material, we will provide a soil technician when requested to perform required field density tests to monitor the contractor's compliance with specifications. Laboratory tests will consist of Atterberg limits, gradation analyses, and moisture density relationships. For drilled pier or foundation construction, our technician will verify that the piers or footings have been installed to the required penetration of the proper bearing stratum. He will also verify that the excavation(s) has been properly cleaned, that piers are within plumbness requirements, and that casing is used, if required. When requested, we will observe the concrete reinforcement prior to structural concrete placements. Bar size, spacing, splicing, cleanliness, and cover will be examined for compliance with the approved structural drawings. Post tension strand location, spacing, drape, and anchorage will also be inspected if applicable. When requested, we will observe the placement of embedded bolts in concrete. For bolts that are drilled and epoxied in place, we will inspect the drilled holes for length, diameter, and cleanliness in accordance with the manufacturer's requirements. If requested, we are also available to perform pull tests on completed bolts. When requested, our duties for cast -in-place concrete monitoring will be slump testing, molding compression test cylinders, and concrete compression testing. Concrete will be observed for slump at the point of placement, and one set of concrete cylinders will be cast at the specified frequency. Air content will be tested for concrete exposed to weather. Our fees do not include control or documentation of the initial field -curing environment of the compressive strength test cylinders. When requested, our technicians will also perform laboratory testing on the hot mix asphaltic concrete (HMAC). We will cut cores for determining field density and in-place thickness. Laboratory testing will include molding of test specimens, laboratory densities, voids in mineral aggregate, determination of maximum theoretical density, asphalt content, and gradation. City of Round Rock, Texas ADDENDUM TO December 20, 2016 Ms. Leah Collier Page 3 of 6 EXHIBIT "A" Our Project Manager will attend the preconstruction meeting, be available for review of geotechnical and construction materials related submittals, provide consultation regarding any observed non -conformances, provide technical oversight of our services, and prepare the Special Inspection letter(s) at the conclusion of the project. Our field technician(s) will immediately report results of field observations directly to the on-site job superintendent and owner's representative. We will assist the superintendent in identification and correction of any observed non -compliances with project specifications. In no case will our technician direct the contractor's operations, waive specifications, or make final acceptance of the contractor's work. Written reports will be transmitted electronically. The scope of services and estimated fee proposed herein does not include: ■ Environmental or geologic oversight, including mitigation of any exposed voids, caves, karst features, groundwater, or cave invertebrate habitat; • Inspection of any items at off-site suppliers and fabrication plants; it is assumed that suppliers and fabrication plants employed by the contractor have their own QA/QC program to satisfy the project requirements. • Standby time, trips to site for cancellations without notice, retesting, reinspection, or testing services for the contractor's convenience or internal Quality Control. • Identification, investigation, or mitigation of any hazardous materials, buried waste, buried structures, or other unknown substances or appurtenances found during construction. • Overtime (see footnotes of Schedule CMT -2014 for definition). Terms and Conditions Our general conditions for materials engineering and technical services are presented on Schedule 40.01. Construction materials testing fees are included on Fee Schedule CMT -2014. Both schedules are attached. The project will be billed monthly on the basis of this fee schedule. Materials testing services are for quality control purposes only. In no way are our personnel responsible for the job site safety of others, nor do they have stop -work authority. However, our personnel will conduct their work in a safe, workman -like manner, and will observe work -site safety requirements. City of Round Rock, Texas ADDENDUM TO December 20, 2016 Ms. Leah Collier Page 4 of 6 EXHIBIT "A" The following statement is required by Fugro's Insurance Company. Fugro's scope of work does not include the investigation, detection, or design related to the presence of any Biological Pollutants. The term "Biological Pollutants" includes, but is not limited to, mold, fungi, spores, bacteria, and viruses, and the byproducts of any such biological organisms. Proposed Fees Testing costs will vary depending on the construction schedule, project sequencing, overlapping of work, weather, and other factors. Our services will be provided on a call -out basis and will be billed in accordance with the attached fee schedule. For budgeting purposes, we estimate that our fees will be approximately as detailed in the attached breakdown. Upon request, other services may be provided that are shown on the fee schedule but are not itemized on the estimate and will be invoiced accordingly. This cost estimate is based on the acceptance of our terms and conditions without modification, and the use of this proposal as our sole agreement. City of Round Rock, Texas ADDENDUM TO December 20, 2016 Ms. Leah Collier Page 5 of 6 EXHIBIT "A" To indicate acceptance of our proposal, please have the signature block below signed by a duly authorized person in the spaces provided and return the attached copy to us for our files. We appreciate the opportunity to submit this proposal and look forward to working with you on this project. If you have any questions, please call. FUGRO CONSULTANTS, INC. TBPE Firm Registration No. F-299 i David R. Mason, P.G. Manager, Materials Engineering and Testing MACMT\PROJECT FILES\2015\04.30152018 Creek Bend Extension\04.30152018 Creek Bend Extension Contract\Supplemental\PO4.30152018 Creek Bend Extension_Supplemental.doc Attachments CLIENT: Authorizing Signature Name & Title Company Date City of Round Rock, Texas ADDENDUM TO December 20, 2016 Ms. Leah Collier Page 6 of 6 EXHIBIT "A" Document Distribution Please indicate the addresses that you wish to have test reports distributed to. Owner: Tele: Address: Fax: Cell: Attn: E -Mail: Contractor: Tele: Address: Fax: Cell: Attn: E -Mail: Architect: Tele: Address: Fax: Cell: Attn: E -Mail: Engineer: Tele: Address: Fax: Cell: Attn: E -Mail: Other: Tele: Address: Fax: Cell: Attn: E -Mail: PO4.30152018 Creek Bend Extension—Supplemental I- City of Round Rock ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Agreement No. 1 with Fugro Consultants, Inc. for construction materials testing services for the Creek Bend Extension Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 2/17/2017 Dept Director: Gary D. Hudder, Transportation Director Cost: $25,289.25 Indexes: 2014 Transportation Certificates of Obligation Attachments: Executed Supplemental_Fugro-Creek Bend Department: Transportation Department Text of Legislative File CM -2017-1319 Consider executing Supplemental Agreement No. 1 with Fugro Consultants, Inc. for construction materials testing services for the Creek Bend Extension Project. The City awarded a construction contract to Capital Excavation Company on February 26, 2015. As part of the project, the City is contracting for construction materials testing services for the Creek Bend Blvd Project with Fugro Consultants, Inc. The scope of services consists of earthwork testing, drilled pier consultations, concrete reinforcing steel observation, anchor bolt inspection, concrete testing and asphalt testing. Supplemental # 1 is for additional Asphalt testing in the field, at the plant, and in the lab for a total of $25,289.25. The original contract total was $93,662.10. The new amended contract total will be $118,951.35. Cost: $25,289.25 Source of Funds: 2014 Transportation Certificates of Obligation City of Round Rock Page 1 Printed on 211612017