Loading...
R-07-01-25-9B1 - 1/25/2007RESOLUTION NO. R-07-01 -25 -9B 1 WHEREAS, the City of Round Rock has duly advertised for bids for the Raw Water Delivery System - Pumps Improvements Project, and WHEREAS, Keystone Construction, Inc. has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of Keystone Construction, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Keystone Construction, Inc. for the Raw Water Delivery System - Pumps Improvements Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 25th day of January, 2007. ST: L, Mayor City of Round Rock, Texas CHRISTINE R. MARTINEZ, City Secreta.:, 0:\wdox\RESOLUTI\R70125B1.WPD/rmc 123574 Rieta Tice Fa Austin, Texas 78737 tel; 512 346-1 /08 tax 512 345-1483 December , 2006 Sssite 210 Mr. Don Rundell, P,E. Chief Utility Engineer City of Round Rock Utility Department 212 Commerce Cove Round Rock, Texas 78664..3227 Subject: Raw Water Delivery System - pumps Recommendation of Award Dear Mr. Rundell; �n November 28, 2006, bids were received for the Raw Water i eCvery System - Pumps project. Three bids were received and are listed below Biddel Keystone Constructon, Inc. Matous Construction Ltd. Austin Engineering Co., Inc. Additive Alternate Total (Base Bid and 'I°otal Bid Item Additive Alternates$3) ,951,954.644 $266362.50 $4,218,317.14 $4,316,473.00 $43,900,00 $4,360,373.00 $4,471,000 $50,370.00 $4,521,370.00 The low bidder for the project is Keystone Construction, Inc. We have investigated previous work by Keystone Construction, Inc. to determine if qualified to complete the work, Keystone Construction, Inc. has successfully completed are numerous water and wastewater treatment plant projects in the Central Texas area. We believe that Keystone Construction, Inc. has the experience and the capacity to complete the Raw Water Delivery System - Pumps project within the timeframe described in the contract. We therefore recommend that the Raw Water Delivery System - Pumps contract be awarded to Keystone Construction, Inc. in the amount of $4,218,317:14. Don Runde11„ P.E. December 1,2006 Page 2 If you have any questions regar tion to award or the project in general, please contact me. Sinfrely, Allen D. Woelke, P.E. Vice President Camp Dresser & McKee Inc. c: Jeff Bell, Qty of Round Rock Bill Reynolds, CDM Greg Swoboda, CDM nn 40t: f• f qF }q� Y V� 3V f7, }wRAW r a CO�.�$ RAW WATER UNE . Al NOT TO SCS PROJEar s -PUWS a z, DATE: January 16, 2007 SUBJECT: City Council Meeting - January 25, 2007 ITEM: 9.B.1. Consider a resolution authorizing the Mayor to execute a construction contract with Keystone Construction, Inc. for the Raw Water Delivery System - Pumps Improvement Project. Department: Water and Wastewater Utilities Staff Person: Michael Thane, Utility Director Justification: On November 28, 2006 the City received three (3) bids for this project with the average bid amount being $4,366,686.71. Keystone Construction, Inc. submitted the low bid in the amount of $4,218,317.14. Staff recommends the award of the project to Keystone Construction, Inc. for $4,218,317.14. Funding: Cost: $4,218,317.14 Source of funds: Capital Project Funds (Self -Financed Utility) Outside Resources: Keystone Construction, Inc. Camp Dresser & McKee, Inc. Background Information: The City Water Treatment Plant (WTP) was expanded to a capacity of 48 million gallons per day (mgd) with the completion of the Phase V plant expansion. The Raw Water Pump Station located on Lake Georgetown currently delivers 39 mgd to the WTP. This contract will authorize the construction of improvements to said Raw Water Pump Station for the delivery of 48 mgd to the WTP, as designed by Camp Dresser & McKee, Inc. A subsequent project for the Raw Water Delivery System - Line Improvements is under design and will be bid in the Spring of 2007, completing the improvement required to deliver 48 mgd of raw water to the WTP. Public Comment: N/A