O-79-713 - 9/13/1979ORDINANCE NO. 713
AN ORDINANCE ADOPTING THE URBAN SERVICES PLAN.
BE IT ORDAINED BY THE COUNCIL OF THE CITY OF ROUND ROCK,
TEXAS, THAT
Pursuant to Chapter 3, Section 5.D. of the Code of Ordinances,
City of Round Rock, there is hereby adopted the Urban Services
Plan, a copy of which is attached hereto as an Exhibit and incorpor-
ated herein for all purposes,
II,
A copy of the herein adopted Urban Services Plan is to be
on file with the Public Works Department and available for public
inspection.
(Markthroughthe following alternative that is not applicable)
Alternative 1,
By motion duly made, seconded and passed with. an affirm-
ative vote of all the Council members present, the requirement
for reading this ordinance on two separate days was dispensed
with,
READ, PASSED, and ADOPTED on first reading this !3 day
Alternative: 2.
READ an
READ, APPROVE
ATTESTf
1979.
on first reading this the
1979.
and ADOPTED on
, 1979,
ay of
S� NNS LAND, Cit Secretary
second
reading this the
LARRY L. TONN,IMayor
City of Round Rock, Texas
DEPARTMENT OF PLANNING
AND COMMUNITY DEVELOPMENT
URBAN SERVICES PLAN
WATER AND SEWER NEEDS
CITY OF ROUND ROCK, TEXAS
AUGUST, 1979
ROUND ROCK 1983:.WATER AND SEWER
Assuming adequate water supply and bonding capacity and the present
growth trend, the following generalizations can be made about Round Rock
1983:
The population may be 24,000.
Water demand could reach a peak of 11 million gallons per day. An
additional '3 million gallons per day will be required to meet the
Brushy Bend contract.
Sewer demand would be 2.4 million gallons per day.
Following the Urban Services approach as outlined here, the quality
of life as it relates to water and sewer would have increased.
REPORT ORGANIZATION
Water and sewer needs and costs have been broken down to specific
years in specific service levels over the next five years. The next page
depicts the water service levels for Round Rock. Following pages address
individual water service level needs and costs. Sewer needs and costs
immediately follow the water section.
Zdirverz.s !foie # r
WATER SERVICE LEVEL IA
PROSPECTUS
YEAR:
1979
1980
1981
1982
1983
PROJECTED POPULATION:
3129
3863
4597
5330
6064
COMBINED STORAGE
POPULATION CAPABILITY:
3823
7690
8080
8080
8080
WATER SERVICE THRESHOLDS
LIMITATION:
SOLUTION:
COST:
EXPENDITURE YEAR:
ELEVATED STORAGE
(3790)2
. .5 MG STDPE & LINES1
(8550)3
$374,475
1981
GROUND STORAGE
(3850)
ONE MG GST4
(7690)
$162,500
1980
BOOSTER PUMPS5
TWO 1500 GPM PUMPS
$62,500
1980
1.5 million gallon standpipe.
?Population that can be currently served.
3Population served after improvement.
40ne million gallon ground storage tank located at main well field on Lake
Creek. One-half this storage is credited for Service Level 1B.
5Sizing of booster pumps based on serving Service Levels 1A, 1B, 2, and 4
rather than sizing based on Service Level lA population.
AcR 3cRV I Uc LEVEL 1$
PROSPECTUS
YEAR:
1979
1980
1981
1982
1983
1984
POPULATION:
4866
5735
6604
7473
8342
9310
COMBINED STORAGE:
5320
7450
7450
9576
9576
11,700
WATER SERVICE THRESHOLDS
LIMITATION:
SOLUTION:
COST:
EXPENDITURE YEAR:
GROUND STORAGE*
(3850)
.5 MG GST, BOOSTER
PUMPS WITH LINES
(11,540)
$265,727
1984
ELEVATED STORAGE
(7150)
.5 MG STDPE WITH LINES
(11,900)
$329,422
1982
BOOSTER PUMPS
(12,800)
COMPLETED
--
--
•
*One-half of one MG
GST scheduled for
1980 at Lake Creek
water plant is
credited for Service
Level 1B. Results.
in 7690 person
capacity for 1B.
WATER SERVICE LEVEL 2
PROSPECTUS
YEAR:
1979
1980
1981
1982
1983
POPULATION:
4618
5452
6286
7120
7955
COMBINED STORAGE:
5319
7447
9574
9574
9574
WATER SERVICE THRESHOLDS
LIMITATION:
SOLUTION:
COST:
EXPENDITURE YEAR:
ELEVATED STORAGE
(4762)
.5 MG STDPE & 12" LINE
(9500)
$285,000
1980
GROUND STORAGE
(5769)
.5 MG GST
(9600)
$199,650
1981
BOOSTER PUMPS
(11,200)
COMPLETED
--
--
WATER SERVICE LEVEL 4
PROSPECTUS
YEAR:
1979
1980
1981
1982
1983
POPULATION:
887
1048
1207
1367
1527
COMBINED STORAGE:
2816
2816
2816
2816
2816
WATER SERVICE THRESHOLD
LIMITATION:
SOLUTION:
COST:
EXPENDITURE YEAR:
GROUND STORAGE
(1246)
COMPLETED
--
--
BOOSTER PUMPS
(2400)
COMPLETED
--
--
ELEVATED STORAGE
(4762)
COMPLETED
--
-
ADDITIONAL WATER NEEDS THROUGH 1983
Misc. Unscheduled Waterlines for
Service Levels 1A, 1B, 2 &.4
1980 $500,000
1981 $ 20,000
1982 $ 20,000
1983 $ 20,000
1984 $ 20,000
TOTAL: $580,000
WATER SUPPLY PROGRESS REPORT
Surface: Northfork Reservoir: $7.5 to $8 million for 30" waterline (18 mgd
capacity). Waterline route is from Northfork to IH 35 and Westinghouse
Road. Cost includes 6 mgd water treatment plant (first phase).
Ground: Current Program: 3 new wells located .in northwest part of city at
a cost of $350,000 (1980).
WATER SERVICECOST
YEARS
WATER SERVICE LEVEL ,
UNSCHEDULED
WATER MAINS
TOTAL
1A
1B .
2
4
1980
$143,750
$ 81,250
$285,000
--
*$850,000
$1,360,000
1981
374,475
--
199,650
--
20,000
594,125
1982
--
329,422
--
--
.20,000..
349,422
1983
--
. --
--
--
..20,000
. 20,000
1984
--
265,727
-
--
20,000
285,727
TOTAL
$518,225
$676,399
$484,650
0
$930,000
$2,609,274
NOTE: North Fork set-aside funds not included in above items.
*Includes development of new well field.
SEWER SERVICE COST
YEARS
WASTEWATER LINES
IN DRAINAGE BASINS
SEWAGE TREATMENT
PLANT PROJECTS
UNSCHEDULED
SEWER MAINS
TOTAL
BRUSHY CREEK
LAKE CREEK
1980
$40,000
$213,000
*$1,125,000
$ 20,000
$1,398,000
1981
51,000
--
*** 317,500
20,000
388,500
1982
--
24,000
--
20,000
44,000
1983
--" --
--
*** 887,500
20,000
907,500
1984
--
--
*** 887,500
20,000
907,500.
TOTAL
$91,000
$237,000
$3,217,500
$100,000
$3,645;500
**1 to 1.4 MGD STP Expansion.
***Local matching funds for EPA Regional STP project.
COMBINED WATER & SEWER COST
YEARS
WATER
SEWER
COMBINED
1980
$1,360,000
$1,398,000
$2,758,000
1981
594,125
388,500
982,625
1982
349,422
44,000
393,422
1983
20,000
907,500
927,500
1984
285,727
907,500
1,193,227
TOTAL
$2,609,274
$3,645,500
$6,254,774
NOTE: North Fork set-aside funds not included in items shown for
Urban Services Plan.
6,0 y.