R-86-803 - 1/9/1986RESOLUTION NO. 803R
WHEREAS, engineering services are necessary in order to design
the necessary facilities for flouride treatment to the City of Round
Rock's water system; and
WHEREAS, the engineering firm of Haynie & Kallman, Inc. has submitted
a proposal to provide the needed engineering services; and
WHEREAS, the City Council wishes to
Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS
That the Mayor is hereby authorized and directed to execute on
accept said proposal, Now
behalf
of the City, a letter agreement submitted by Haynie & Kallman, Inc., to
submit the necessary land survey, a copy of said letter agreement being
attached hereto and incorporated herein far all purposes.
th
RESOLVED this day of , 1986.
ATTEST:
Ja,n,nL)
JO NE LAND, Ci y Secretary
MIKE ROBINSON, Mayor
City of Round Rock, Texas
Haynie & Kallman, Inc.
CONSULTING ENGINEERS
Mr. Jim Nuse
Director of Public Works
City of Round Rock
214 E. Main Street
Round Rock, Texas 78664
Re:
Dear Jim:
1106 South Mays • Round Rock, Texas 78664 • (512) 255-7861
December 18, 1985
Design of Fluoride Facilities
for the Surface Water Plant &
Lake Creek Well Sites
This letter will serve as a Letter of Authorization for
the design of the necessary facilities for fluoride treatment
to the City of Round Rock's water system.
As you know, the State of Texas will reimburse the City
for the expense for design and construction as long as these
costs can be justified.
We will proceed with the design upon the Mayor's appro-
val of this letter. Fees shall be based on our hourly wage
scale as shown on the attached sheet but shall not exceed a
sum of $2,000 without further authorization from you.
Sincerely,
HAYNIE & KALLMAN, INC.
Scott Linden, P.E.
WVL/cla
Enclosure
AUTHORIZED BY THE CITY OF ROUND ROCK
/-9-I'
Mike Robinson, Mayor Date
CIVIL ENGINEERING • CONSULTANTS • MUNICIPAL ENGINEERING • LAND PLANNING • SURVEYING
HAYNIE & KALLMAN, INC.
HOURLY RATE SCHEDULE
CLASSIFICATION HOURLY RATE
1. Corporate Officer $100
2. Registered Professional Engineer $ 75
3. Registered Public Surveyor $ 60
4. Project Manager/Hydrologist $ 55
5. Engineer -in -Training (E.I.T.) $ 45
6. Land Planner $ 50
7. Survey Crew Coordinator $ 40
8. Project Representative (includes Vehicle and Equipment) $ 40
9. Design Technician $ 35
10. Dr after $ 30
11. Survey Calculation Technician $ 40
12. Technical Support Personnel $ 30
13. Secretarial Personnel $ 25
14. Four Man Survey Crew (includes Vehicle and Equipment) $ 80
15. Three Man Survey Crew (includes Vehicle and Equipment) $ 75
16. Two Man Survey Crew (includes Vehicle and Equipment) $ 65
17. Reimbursement for Direct Non -Labor Expense and Sub -
Contract Expense - Cost Plus 20%
Revised 8-1-85