R-04-07-08-9F4 - 7/8/2004RESOLUTION NO. R -04-07-08-9F4 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ("Contract") with HDR.Engineering, Inc. for the design of the East Water Transmission Line (Phase II) Improvements, and WHEREAS, HDR Engineering, Inc. has submitted Supplemental Agreement No. 2 to the Contract to extend the contract date, and WHEREAS, the City Council desires to enter into said Supplemental Agreement No. 2 with HDR Engineering, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 2 to the Contract with HDR Engineering, Inc., a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the .public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 8th day of July, 200 K �l 4. AT 4 /ALAPP N ' �� Mayes Cit'. .f Round Rock, Texas CHRISTINE R. MARTINEZ, City SecIetary @PFDesktop\-:CDMA/WORLDOX/O:/WDOX/RESOLUTI/R40708F4.WPD/sc STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. 2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HDR ENGINEERING, INC. ("Engineer") ADDRESS: 2211 South IH -35, Suite 300, Austin, Texas 78741 PROJECT: EAST TRANSMISSION LINE (PHASE II) IMPROVEMENTS This Supplemental Agreement No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and HDR Engineering, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 9th day of August, 2001 for the East Transmission Line (Phase II) Improvements; and WHEREAS, on December 19, 2002, the City and Engineer executed Supplemental Agreement No. 1 to (1) extend the Contract period to August 1, 2004 and (2) change the Engineer's subconsultant "Baker-Aicklen & Associates, Inc." to "Inland Civil Associates, Inc.; and WHEREAS, it has become necessary to amend the Contract to extend the Contract Period; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Agreement is amended as follows: I. Article 2, Scope Of Services To Be Performed By Engineer to reflect a revised Work Schedule which is attached hereto as Addendum to Attachment C, Work Schedule. II. Article 3, Contract Period, shall be amended as set forth below: (1) Term. The Engineer is expected to complete the work in accordance with the above described Work Schedule. If Engineer does not perform the work in accordance with the Work Schedule, then City shall have the right to terminate this Agreement as set forth below in Article 18. So long as the City elects not to terminate this Agreement, it shall continue from day to day until such time as the work is completed. Any work performed or costs incurred after the date of termination shall not be eligible for reimbursement. Engineer shall notify City in writing as soon as possible if he/she/it determines, or reasonably anticipates, that the work will not be completed in accordance with the Work Schedule. Supplemental Agreement 68628 Rev.03/02/04 Page 1 of 2 D a EXHIBIT 4 f ,l i r+tAl 1431 egend Interceptor r' Watewater Line N Not to scale Westinghouse Wastewater - ; ROIJNDROCK.TEXAS Interceptor $ S:\Graphics\Council Agenda ltems\Engineenng\2004\Wa5tewater Utilily\WESTINGHOUSE WW INTERCEPTOR\Westinghouae Interceptor—d! DATE: July 2, 2004 SUBJECT: City Council Meeting - July 8, 2004 ITEM: *9.F.4. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 2 to the Contract for Engineering Services with HDR Engineering, Inc. for the design of the East Water Transmission Line (Phase II) Improvements. Department: Water/Wastewater Utility Department Staff Person: Tom Clark, Director of Utilities Justification: This resolution is required, to extend the contract time. The current contract termination date is August 1, 2004. Due to delays in acquiring easements and coordination with TxDOT on right-of- way issues HDR will not be able to meet the August 1, 2004 completion date. Therefore, with this resolution the contract termination date will be extended to March 1, 2005. This will cover project closeout and delivery of "Record Drawings" to the City. The actual water line is scheduled to be in service by November 2004. Funding: Cost: N/A Source of funds: N/A Outside Resources: HDR Engineering, Inc. Background Information: The East Water Transmission Line (Phase II) Improvements are to construct a 36" waterline from Chandler Road to Old Settlers Boulevard. This line was designed to meet future water demand on the East Side of Round Rock, along with meeting the water demands generated by the HEC. Public Comment: N/A Executed Document Follows STATE OF TEXAS COUNTY OF WILLIAMSON AGREEMENT N0.2 TAL AGRE NG SERVICES SUPPLEMENTAL ENGINEERING TO CONTRA INC. ("Engineer") IBDRENGINEERING Texas 18741 FIRM; Suite 300, Austin, IMPROVEMENT'S ADDRESS: EAST South IH-35� PHASE II) PROJECT: EAST TRANSMISSION LINE pR Engineering Services is made by and Agreement k, No. 2 to Contract for Eng »and HDR Engineering, d This Supplemental Round Rock, Texas, hereinafter called the Ctty between the City ofineer". Inc., hereinafter called the "Eng Engineering Services, hereinafter City and Engineer executed a Contract for Eng g WHEREAS the 9th day of August, 2001 for the East Transmission Line (Phase II) called the "Contract„ , on the Improvements; and lemental Agreement 2002, the City and Engineer exccuted Supp on December 19, ust 1, 2004 and (2) change the Engineer's WHEREAS to Aug No. 1 to (1) extend the Contract period Inc.„ to "Inland Ci9il Associates, Inc.; and subconsultant "Baker-Aicklen & Associates, Contract to extend the Contract Period; and WHEREAS it has become necessary to amend the NOW THEREFORE, premises considered, the City and the Engineer agree that said Agreement is amended as follows: I. Article 2 Sco To Be Performed B En Meer to reflecrevised Work Schedule � e Of Services Work Schedule. which is attached hereto as Addendum to Attachment C, II. Article 3 Contract Period, shall be amended as set forth below: with the above Engineer (1) Term. The is expected to complete the work in accordance Engineer does not perform the work in accordance with the Work described Work Schedule.hhavef te right to terminate this Agreement as set forth below in Article da Schedule, then City shall reement, it shall continue from day Y 18. So long as the City elects not to terminate this Ag leted. Any work performed or costs incurred after the a a e soon of until such the work is comp Ci in writing completed anticipates, that the work will not be termination shall allll not be eligible for reimbursement. Engineer shall notify as possible if he/she/it determines, or reasonably in accordance with the Work Schedule. Rev.03/02/04 Supplemental Agreement 68628 R-04-0748- 9py Page 1 of 2 (2) Work Schedule. Engineer acknowledges that the Work Schedule is of critical importance, and agrees to undertake all necessary efforts to expedite the performance of the work required herein so that construction of the project will be commenced and completed as scheduled. In this regard, and subject to adjustments in the Work Schedule as provided in Article 2 herein, Engineer shall proceed with sufficient qualified personnel and consultants necessary to fully and timely accomplish all work required under this Agreement in a professional manner IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Agreement in duplicate. HDR ENGINEE NG, INC. By:Q/ Date CITY OF R P • ND ' 0 By: Nyle a 1, " ayor Date Supplemental Agreement Rev.03/02/04 Page 2 of 2 CITY OF ROUND ROCK, TEXAS W J m 0 W = 2 W V Q Y 2 ce aO W , Z o J 1- z z _O w cn _ �o i_ g• ~ Q t-0 F- I - co 2 Q m W 0 Z LU 0 0 Q HDR Engineering, Inc. Revised June 9, 2004 X X (1) Y CD Q H Notice to Proceed - August 2001 Route Selection with TxDOT Route Surveying Environmental Surveys & Permitting Easement Preparation Easement Acquisition Engineering Design 50% Review 90% Review 100% Complete Advertise / Bid / Award Construction Asbuilt Drawings and Project Closeout HDR Engineering, Inc. Revised June 9, 2004