R-04-06-24-17C1 - 6/24/2004RESOLUTION NO. R -04-06-24-17C1
WHEREAS, the City of Round Rock has duly advertised for bids for
the Bradford Park Development and South Creek Sidewalk Gap Project
(G.O. Project), and
WHEREAS, Muniz Concrete & Contracting, Inc. has submitted the
lowest responsible bid, and
WHEREAS, the City Council wishes to accept the bid of Muniz
Concrete & Contracting, Inc., Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City a contract with Muniz Concrete & Contracting, Inc.
for Bradford Park Development and South Creek Sidewalk Gap Project
(G.O. Project) .
The City Council hereby finds and declares that written notice of
the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and
the subject matter hereof were discussed, considered and formally acted
upon, all as required by the Open Meetings Act, Chapter 551, Texas
Government Code, as amended.
RESOLVED this 24th day of June, 2004.
AT &
a41,14/v
CHRISTINE R. MARTINEZ, City Secret
@PFDesktop\:: ODMA/WORLDOX/O:/
DOX/RESOLCTI/R40624C1.WPD/sc
Cit.' of Round Rock, Texas
0
O
O
tV
v1
Gs.
O
TABULATION
b
L
0
E
ar
1.
ea
0..
b
'0
0a
0
O
H. Deck Construction
O
10
0
Oo000
Oet000
00000
O o0 O O N
(Nit-- oo
---NNt`i\
69 69 69 69 N
69
O O
00
6 69
69
0000000000
0000000000
60960960cS 0 0 0 0
9 69699696969609
0
0
O
64
0 0
0 et
0 ti
00 N
69 69
0 0 0 0 0 0
O O 00 O O O
E.,
4.100c'i00
U 0069 O ON
� 0 0 69
x6969 6e. 69669
0 0 0 0 0 0
0 0 0 0 0 0
F00C 000
O OEN00N
�aVO t,
U'��(4'VN-:oot,
64 ,69 69 ,69 64 N
69
prgn
U 69 696696646�9
O
6R
O O O O 41 t --
CD CD CD CD v) e.
CD N O O 069 69
etMM--•
69 69 64 69
300000
000000
000000
00041410
VD V' N VD N et
^69 69 69
604 e.
69669
O
O
O
O
M
69
O
O
64
O O O h
OOO.o
CS CD
OE 6q 69
69 69
69
O O
O O
o0 p0 (-1 4")
00 on en
69 64 : 64
69
Council Chambers
C41
O O
o 0
00
69 6M9 64
0
O
0
1-4
69
O O An O O v)
F.
44
" 8 1/40
�M164
A 0�,691� p�
M
CT
..i
O
N
M
U
0
C
000000
Oo00v,0
0 0 0 +nCD 00 En 00 CD
i` 0
O
669'
N
ww
enWI CT
69 6699669
0
DN
411
M NEps 64.1
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
609 609609 609 60960 0 0
9 6969 609 609
O O 0 0 0 0 0 0 0 0 0 0 0
00 Oo00rr000o00
•-+0 .:000.0000000
ON NOOOet CV e'00000
Ma NO v)OMOOoo00eV v)
'.' 0169 646969 �6�964 EA 69
O 0 0 0 0 0 0 0 0 0 0
ooOd:o00000
et O O O M vi v j 0 0 0 0
69 ONO
69'696`300000
69 69 0 0 v)
669 669 69 M
69 69 69
0000000000
O -000 40 N et 0000
et ifi"O O64 4ocS vi000
N 00r,. et b v) 4)00
? M l� 0 00
0000.-:M ON CCN 'Os
69 69 69 N64 69 69 69 69 69
O
30
00
69
Io
Nr
--.
64 64
O
CD00
64
O
00
N
O O O v)
00000
O O O M
N 41 00 0000
00 69
Ff3 f-
69 69
O
O
O
et
VD
00
N
69
69
O
N
VD
O
69
69
O
et
N
00
It
69
0141
0
e
O
V'
00
v
69
r
'1'n0000
oov?000
VS O n O O O
69 69 N 41 v) 00
69
69
EAS4
v�0303000000
EN 0 0 0 0 0 0 0 0 0 0
-•000 0;4000v;0
44 O 7 v) 00 .--. v1 '0 O t, v)
et„ CV VD, 000TNN C00
e.MMN-
-+
N 69 69 69 e. 64 69 69 69
R
V
aJ
O O O O on un 0 0 0 0
o00v)EN0000
000M 4'0000,^ 0
MO (V V1 69 69 69 M O N.
rn
64 .-. 64 of a 00
69 69 69 69
e. VO 7 X�0p00
Mit 1000 •-~ •r
w
0
N
`tT
O
00
69
TOTAL BASE BID:
TOTAL BASE BID W/ ALTERNATES
DATE: June 18, 2004
SUBJECT: City Council Meeting - June 24, 2004
ITEM: 17.C.1. Consider a resolution authorizing the Mayor to execute a contract with
Muniz Concrete & Contracting, Inc. for the Bradford Park Development
and South Creek Sidewalk Gap Project (G.O. Bond Project),
Department:
Staff Person:
Justification:
Parks and Recreation Department
M. James Hemenes, Park Development Manager
The Bradford Park Development portion of this project will provide a
neighborhood level park for the nearby residents. The South Creek
Sidewalk Gap portion of the project will increase connectivity via sidewalks
through the South Creek neighborhood and along High Country Blvd.
Funding: $140,000.00
Cost: $123,493.75
Source of funds: General Capital Improvement Funds
Outside Resources: Muniz
Background Information:
Public Comment:
Concrete & Contracting, Inc.
The Bradford Park Development Project is a limited park
development that will include a playground, walking trail, and
various site amenities. The Sidewalk Gap portion of the
project is part of the overall Citywide Sidewalk Program that is
being administered by the Engineering & Development
Services Dept.
Numerous meetings with the Bradford Park HOA were held over the past
two years. Notices concerning the sidewalk improvements were sent
out. No responses have been received.