Loading...
R-04-06-24-17C1 - 6/24/2004RESOLUTION NO. R -04-06-24-17C1 WHEREAS, the City of Round Rock has duly advertised for bids for the Bradford Park Development and South Creek Sidewalk Gap Project (G.O. Project), and WHEREAS, Muniz Concrete & Contracting, Inc. has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of Muniz Concrete & Contracting, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Muniz Concrete & Contracting, Inc. for Bradford Park Development and South Creek Sidewalk Gap Project (G.O. Project) . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 24th day of June, 2004. AT & a41,14/v CHRISTINE R. MARTINEZ, City Secret @PFDesktop\:: ODMA/WORLDOX/O:/ DOX/RESOLCTI/R40624C1.WPD/sc Cit.' of Round Rock, Texas 0 O O tV v1 Gs. O TABULATION b L 0 E ar 1. ea 0.. b '0 0a 0 O H. Deck Construction O 10 0 Oo000 Oet000 00000 O o0 O O N (Nit-- oo ---NNt`i\ 69 69 69 69 N 69 O O 00 6 69 69 0000000000 0000000000 60960960cS 0 0 0 0 9 69699696969609 0 0 O 64 0 0 0 et 0 ti 00 N 69 69 0 0 0 0 0 0 O O 00 O O O E., 4.100c'i00 U 0069 O ON � 0 0 69 x6969 6e. 69669 0 0 0 0 0 0 0 0 0 0 0 0 F00C 000 O OEN00N �aVO t, U'��(4'VN-:oot, 64 ,69 69 ,69 64 N 69 prgn U 69 696696646�9 O 6R O O O O 41 t -- CD CD CD CD v) e. CD N O O 069 69 etMM--• 69 69 64 69 300000 000000 000000 00041410 VD V' N VD N et ^69 69 69 604 e. 69669 O O O O M 69 O O 64 O O O h OOO.o CS CD OE 6q 69 69 69 69 O O O O o0 p0 (-1 4") 00 on en 69 64 : 64 69 Council Chambers C41 O O o 0 00 69 6M9 64 0 O 0 1-4 69 O O An O O v) F. 44 " 8 1/40 �M164 A 0�,691� p� M CT ..i O N M U 0 C 000000 Oo00v,0 0 0 0 +nCD 00 En 00 CD i` 0 O 669' N ww enWI CT 69 6699669 0 DN 411 M NEps 64.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 609 609609 609 60960 0 0 9 6969 609 609 O O 0 0 0 0 0 0 0 0 0 0 0 00 Oo00rr000o00 •-+0 .:000.0000000 ON NOOOet CV e'00000 Ma NO v)OMOOoo00eV v) '.' 0169 646969 �6�964 EA 69 O 0 0 0 0 0 0 0 0 0 0 ooOd:o00000 et O O O M vi v j 0 0 0 0 69 ONO 69'696`300000 69 69 0 0 v) 669 669 69 M 69 69 69 0000000000 O -000 40 N et 0000 et ifi"O O64 4ocS vi000 N 00r,. et b v) 4)00 ? M l� 0 00 0000.-:M ON CCN 'Os 69 69 69 N64 69 69 69 69 69 O 30 00 69 Io Nr --. 64 64 O CD00 64 O 00 N O O O v) 00000 O O O M N 41 00 0000 00 69 Ff3 f- 69 69 O O O et VD 00 N 69 69 O N VD O 69 69 O et N 00 It 69 0141 0 e O V' 00 v 69 r '1'n0000 oov?000 VS O n O O O 69 69 N 41 v) 00 69 69 EAS4 v�0303000000 EN 0 0 0 0 0 0 0 0 0 0 -•000 0;4000v;0 44 O 7 v) 00 .--. v1 '0 O t, v) et„ CV VD, 000TNN C00 e.MMN- -+ N 69 69 69 e. 64 69 69 69 R V aJ O O O O on un 0 0 0 0 o00v)EN0000 000M 4'0000,^ 0 MO (V V1 69 69 69 M O N. rn 64 .-. 64 of a 00 69 69 69 69 e. VO 7 X�0p00 Mit 1000 •-~ •r w 0 N `tT O 00 69 TOTAL BASE BID: TOTAL BASE BID W/ ALTERNATES DATE: June 18, 2004 SUBJECT: City Council Meeting - June 24, 2004 ITEM: 17.C.1. Consider a resolution authorizing the Mayor to execute a contract with Muniz Concrete & Contracting, Inc. for the Bradford Park Development and South Creek Sidewalk Gap Project (G.O. Bond Project), Department: Staff Person: Justification: Parks and Recreation Department M. James Hemenes, Park Development Manager The Bradford Park Development portion of this project will provide a neighborhood level park for the nearby residents. The South Creek Sidewalk Gap portion of the project will increase connectivity via sidewalks through the South Creek neighborhood and along High Country Blvd. Funding: $140,000.00 Cost: $123,493.75 Source of funds: General Capital Improvement Funds Outside Resources: Muniz Background Information: Public Comment: Concrete & Contracting, Inc. The Bradford Park Development Project is a limited park development that will include a playground, walking trail, and various site amenities. The Sidewalk Gap portion of the project is part of the overall Citywide Sidewalk Program that is being administered by the Engineering & Development Services Dept. Numerous meetings with the Bradford Park HOA were held over the past two years. Notices concerning the sidewalk improvements were sent out. No responses have been received.