Loading...
R-07-03-22-10G1 - 3/22/2007 RESOLUTION NO. R-07-03-22-10G1 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Austin Filter Systems, Inc. for the South Creek Channel Improvements Project, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 1 to the Contract with Austin Filter Systems, Inc. for the South Creek Channel Improvements Project, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 22nd day of March, 2007 . 0:\wdox\RESOLTJTI\R70322G1.WPD/rmc LL, Mayor ity of Round Rock, Texas A ST: CHRISTINE R. MARTINEZ, City Seciltary 2 CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER PAGE 1OF1 DEPARTMENT: Public Works DATE: 3/2/2007 PROJECT: South Creek Channel Improvements CHANGE ORDER NO: 1 JUSTIFICATION: ORIGINAL CONTRACT PRICE: $2,519,793.75 Unexpected electric line conflict. PREVIOUS CHANGE ORDERS: $0.00 Adjustment for final excavation quantity. THIS CHANGE ORDER: $36,119.00 Additional Rain Days added. CHANGE ORDERS TO DATE: $36,119.00 CHANGE DATA ADDED DAYS DESCRIPTION OF UNIT CALENDAR/ ITEM 0 CHANGES UNIT QTY. PRICE AMOUNT WORKING Installation of 4"electrical C.O. 1-1 conduit for TXU LS 1 $2,619.00 $2,619.00 Additional Channel C.O. 1-2 Excavation CY 1,250 $26.80 $33,500.00 Additional Contract Time C.O. 1-3 for Inclement Weather Calendar Das 15 15 631 t Do".•,k ,R, pr,a lit:5 . .'u�,�,�p { 4 ,TOTAL: $36,119.00 15 PREPARED BY: "M ,S/5-/0-7 PERCENT OF ORIGINAL CONTRACT PRICE ENGINEER Travis Michel, P.E.(Espy) Date THIS CHANGE ORDER: 1.43% PREVIOUS CHANGE ORDER: 0.00% CONT - ustin Filter Systems,Inc. )Date TOTAL%CHANGE: 1.43% BY: 1 Sf b7 ORIGINAL CONTRACT PRICE PLUS TITL CHANGE ORDERS: $2,555,912.75 APPROVED: CITY OF ROUND ROCK oonstooWonnsSnk EXHIBIT "An LN MM to NJ � � --. C X111\�������� ♦ r IN ME Mw : ■Mfr►�����4,WA so -Sp► m._ 4§F R�W,►r�i► Affo' Ing ME 61 ONWallis �rrrrrrrrr :rl����►.��rr�� ;�;;.r�����■ �� W Ilk go ,INN 10 W1 10111011 ■■rr� �111111:11111�j �%� logo moi'•'%ii% PPO � �. �� �� ���\IIIIIII�I►�►s- _-�� ■Ilii ...� _ � ■ ■ ,. pi's• � XIM PROJECT I ITS 1 111 WWI SIR VNIP WIP Egg PIP 41 Iq ♦♦ fes ♦� � � �r� Southcreek Channel Improvement Attachment I S pu It MUM. DATE: March 15, 2007 SUBJECT: City Council Meeting - March 22, 2007 ITEM: *10.G.I. Consider a resolution authorizing the Mayor to execute Construction Change Order No. 1 with Austin Filter Systems, Inc. for the South Creek Channel Improvements Project. Department: Engineering and Development Services Staff Person: Danny Halden, P.E., City Engineer Justification: Change Order # 1 is required to revise the scope, contract time, and dollar amount of the initial Construction Services Contract with Austin Filter Systems, Inc. This change order provides additional channel excavation, work to facilitate the relocation of our electric line at Greenlawn Boulevard, and additional contract time due to inclement weather to date. Fundina• Cost: $36,119.00 Source of funds: 2001 G.O. Bonds Outside Resources: Espey Consultants, Inc. Austin Filter Systems, Inc. Background Information: The South Creek Channel Improvements project is nearing completion. This change order is to adjust the contract amount to account for unexpected conditions during construction and adjust for actual quantities. The original contract amount was $2, 519,753.75 with Change Order # 1 the contract total will be $2, 555,912.75. Public Comment: N/A EXECUTED DOCUMENT FOLLOWS CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER PAGE 1 OF 1 DEPARTMENT: Public Works DATE: 3/2/2007 PROJECT: South Creek Channel Improvements CHANGE ORDER NO: 1 JUSTIFICATION: ORIGINAL CONTRACT PRICE: $2,519,793.75 Unexpected electric line conflict. PREVIOUS CHANGE ORDERS: $0.00 Adjustment for final excavation quantity. THIS CHANGE ORDER: $36,119.00 Additional Rain Days added. CHANGE ORDERS TO DATE: $36,119.00 CHANGE DATA ADDED DAYS DESCRIPTION OF UNIT CALENDAR! ITEM# CHANGES UNIT QTY. PRICE AMOUNT WORKING Installation of 4"electrical C.O. 1-1 conduit for TXU LS 1 $2,619.00 $2,619.00 Additional Channel C.O. 1-2 Excavation CY 1,250 $26.80 $33,500.00 Additional Contract Time C.O. 1-3 for Inclement Weather Calendar Das 15 15 TOTAL: $36,119.001 15 PREPARED BY: JfilnAA 30—/0 PERCENT OF ORIGINAL CONTRACT PRICE ENGINEER Travis Michel,P.E.(Espe ) Date THIS CHANGE ORDER: 1.43% PREVIOUS CHANGE ORDER: 0.00% CO OR-Austin Filter Systems, Inc. Date TOTAL% CHANGE: 1.43% BY: ORIGINAL CONTRACT PRICE PLUS TITLE: Q CHANGE ORDERS: $2,555,912.75 APPROVED: ND ROCK constcoZlorms6Ak 1.4 yLG YngXwaL, rynAyop.,