R-07-04-12-11F2 - 4/12/2007 RESOLUTION NO. R-07-04-12-11F2 WHEREAS, the City of Round Rock has duly advertised for bids for the East Water Transmission Line - Phase 3B-2 Improvements Project, and WHEREAS, Lewis Contractor' s Inc. has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of Lewis Contractor' s Inc. , Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Lewis Contractor' s Inc. for the East Water Transmission Line - Phase 3B-2 Improvements Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 12th day of April, 2007 . jef ELL, Ma City of Round Rock, Texas T ST.. CHRISTINE R. MARTINEZ, City Sec tary 0:\Wdox\RESOLUTI\R70412F2.WPD/rmc ------------- March 2,2007 Mr:Don Rundell, P.E. City of Round Rock 212 Commerce Cove Round Rock,TX .78664 Re City of Round Ruck East Water Transmission Line Phase 3B-2 Recommendation to Award Contract Dear Mr. Rundell: On February 28, 200731 HDR Engineering assisted the City of Round Rock in opening bids.for the above-referenced project. A tabulation of the bids,received is attached. The apparent low bidder, was Lewis Contractors, Inc..from Bertram, Texas.' HDR has. reviewed.the bidpropo sal submitted by Lewis Contractor's, Inc. We'recommend that the City of Round Rock accept the bid:of Lewis Contractor°s in the.amount of$ 2,1.16,004'for the Installation of approximately 5,429 linear feet.of 30-inch ductile iron pipe,1185 linear feet of 12-inch ductile iron pipe,and other'related work.- We ork:We have prepared the attached NOTICE OF INTENT TO.AWARD:letter for you to forward to Lewis Contractor's if the City of Round Rock concurs-with this recommendation. If you:have any questions,please call,me at 912-517.0. Sincerely,. HDR.Engineering,Inca Darren C $trozewski, P.E Project Manager 888888 8888888 8 8 8 88888888 8888888888 888888 . 8888 88888 m888888 88 8 888 8. '& .0 g ������� � � 8�8$ �� �S ����5� 1 * � �o og 1..g o - ou� g o 0 am g. g.0 s R^ea^» 9.9. M-, V9 ^9 �R ^ �8 u 888883 e8 .888888 a R 8 .88$99$88 8888888888 asses .8 .8 .888 88888 s8888$s 88 8 8 .8 RV 3 » «««« » »» »»»»« «« ., »«« « 888888 888888888 8 R 88888888 88888 8888 88888 8 8888 88888 8888888 88 8 888 8 $8 $ � Ogg 0B . . . 0119 99909 9 ���w 99 9 99M 39 '899 .9 8 y»-- F »» » «»» « »» «»»» »» » » » 5 888888 888888888 8 g 88888888 8888888888 8888 .888 888 88888 8888888 38. 8 888 8 « s`3^ :R 8888 8 888888888 8 8 88888888 888888 88.8 88888888 8 8 88888 8888888 88 8 888 8 3 8^RR 3gRm� a 3s RRn-i n53S19 9g-R aa>z »» » » »»« »» » » « «»»»»»» » ««» »»»» » » » «« » 888888 8$8888888 8 a 8.8888888 888888MOM 8888 888888888 .888 88888 8888888 88 S 888 8 888888 888888888 8 8 88888888 8888888888 88888888 .8888 88888 51888888 88 8. 888 8 <.8 aa 8`�R�� � r»a k, 888888 �888888R8 8 88888888 8888888888 88811818888888 88858 88888538 R8 8 888 8 # aR`' �R^ s� R $ $�n � "s � �eda$O �g � m � 88888.8 88s88ss8s a 8 88888888 8888888g 99 ON=888 S888s81180R$8 s8888 8888$88 88 8 888 8 88 3sR»- R3E- sasaa^ - �- -s o 888888 8888818$88 a R 88888888 8888888888 8888888888888 88888 88.8.8888 88 8 888 8 « 9 g 99 R e I I-t t -1 t -3�-t t -1 8 A R St 8 iff Ell t'I IMIN i all y r�Y rad � \ t r J, h . - J t ' • N Rp' iii... ��_.._ / I ••5. � � 'tf gg 6 .� C" t., .,',, ®. � ' ...-...._• �� t kid;-::, I y�y ! J.'40 �. � A' • - � a t♦ i DATE: April 5, 2007 SUB7ECT: City Council Meeting - April 12, 2007 ITEM: 11.F.2. Consider a resolution authorizing the Mayor to execute a construction contract with Lewis Contractor's Inc., for the East Water Transmission Line - Phase 3B-2 Improvements Project. Department: Water/Wastewater Utility Staff Person: Michael D. Thane, Director 3ustification: On February 28, 2007, the City received five (5) bids for this project with the average bid amount being $2,536,408.54. Lewis Contractor's, Inc. submitted the low bid in the amount of $2,116,004.00. Staff recommends awarding the project to Lewis Contractor's, Inc. in the amount of $2,116,004.00. Fundina: Cost: $2,116,004.00 Source of funds: Capital Project Funds (Self-Financed Utility) Outside Resources: Lewis Contractor's, Inc. HDR Engineering, Inc. Background Information: The East Water Transmission Line, Phase 3B-2 Improvements is to construct approximately 5,400 feet of 30" water line to be located along County Road 122 from Kiphen Road to Highway 79. This water line is needed to meet current and future water demands in the east and southeast areas of the City and is a part of the City's Water Distribution Master Plan dated August 2004. The estimated construction budget for this project was $2,743,140.00. In addition, this contract also includes the construction of the 12-inch Forest Creek Water Line Improvements. This 12-inch water line is 1,185 linear feet in length. The line will be located along the south side of Forest Creek Drive and extend from Red Bud Lane to St. Andrews Drive. Public Comment: N/A