Loading...
R-07-05-10-8B1 - 5/10/2007 RESOLUTION NO. R-07-05-10-01 WHEREAS, the City of Round Rock has duly advertised for bids for the Police Facility Tower at 3001 Tellabs Drive, and WHEREAS, while only one bid was received from Capstar Wireless, Inc. , the City Council has determined that the bid is acceptable, and WHEREAS, the City Council wishes to accept the bid of Capstar Wireless, Inc. , Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Capstar Wireless, Inc. for the Police Facility Tower at 3001 Tellabs Drive. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 10th day of May, 2007 . - -Z- I— (- — LL, City of Round Rock, Texas A T STS CHRISTINE R. MARTINEZ, City Se etary 0:\Wdox\RESOLUTI\R7051081.WPD/xmC C FAULKNER ENGINEERING 907 West 5h Street,Suite 250 Austin,Texas 78703 PO Box 1528 Austin,Texas 78767-1528 P: 512.495.9470 F:512.495.9473 April 11,2007 Larry Madsen Construction Manager Building Constriction&Facility Maintenance City of Round Rock Ofd. (512)218-5552 Fax(512)218-5563 Letter of Reference Capstar Wreless Services, Inc. Whom it may concern: C Faun Engineering, LP has had the good fortune to work with Capstar Wireless Services, Inc. (formerly JNC) for over 5 years. Additionally, I have personally worked with Capstar Wireless Services PrinWals Justin Jones and Eric Chase for over 10 years. Capstar Wireless Services has constructed numerous emergency wireless facilities under contract to us and for major cellular carriers throughout the southwest United States. My experience with Capstar Wireless Services is that they possess good character and exhibit competency,ability,and character in all there work. Sincerely, Dale Shumaker, PE Principal r DATE: May 2, 2007 SUBJECT: City Council Meeting - May 10, 2007 ITEM: 8.B.1. Consider a resolution authorizing the Mayor to execute a construction contract with Capstar Wireless, Inc. for the Round Rock Police Facility Tower. Department: Engineering and Development Services Staff Person: Tom Word, Chief of Public Works Operations Larry Madsen, Construction Manager Justification: The 130 foot tower will provide support of antennas/microwaves required for dispatch and 911 radio systems at the New Police Facility. Three companies picked up plans for review but only Capstar Wireless Inc. provided a bid at the bid opening April 10th, 2007. The engineer's original estimate was $100,000.00 and the actual bid is $116,000.00. Funding is available in the overall budget for the project and the Police Department and Building Construction staff is recommending approval resolution. Funding: Cost: $116,000.00 Source of funds: 2002 GO Bonds and General Self Finance Construction Outside Resources: C. Faulkner Engineering (tower design consultant) Background Information: N/A Public Comment: N/A