Loading...
R-05-10-13-10F2 - 10/13/2005 t . RESOLUTION NO. R-05-10-13-10F2 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ( "Contract" ) with WHM Transportation Engineering Consultants, Inc. for design work on traffic signals at the intersection of RM 620 and the Round Rock Medical Center entrance, and WHEREAS, WHM Transportation Engineering Consultants, Inc. has .submitted Supplemental Contract No. 1 to the Contract for Engineering Services for a change in the scope of services, and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 1 with WHM Transportation Engineering Consultants, Inc. , Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Contract No. 1 to the Contract for Engineering Services with WHM Transportation Engineering Consultants, Inc. , a copy of same being attached hereto as Exhibit "A" and incorporated herein. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally-acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 13th day of October, 200 NYLE EL , ayor Cit o A E T: Round Rock, Texas CHRISTINE R. MARTINEZ, City Sec tary WPFDesktOp\::ODMA/WORLDOX/O:/WDOX/RESOLUTZ/R51013F2.WPD/SC STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: WHM Transportation Engineering("Engineer") ADDRESS: 504 Lavaca Street#1175,Austin,TX 78701 PROJECT: RM 620/R6und Rock Medical Center Signal Design This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and WHIM Transportation Engineering,hereinafter called the"Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 9th day of September, 2004 for the RM 620/Round Rock Medical Center Signal Design for the sum of$14,500.00;and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by$5,500.00 to a total of$20,000.00, and NOW THEREFORE,premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2. Engineering Services and Exhibit B. En ineering'Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C. Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. R. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $5,500.00 the lump sum amount payable under the Contract for a total of$20,000.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract Rev.03/02/04 Whm-=2620-amc;TX05TMIG;90785 EXHIBIT 84275 1E-- "An R'HM SPOR ON ENGINEERING By: - alo- Date CITY OF ROUND ROCK APP D AS TO ORM: By: Nyle Maxwell,Mayor Steph L.Sheets,City Attorney Date Supplemental Contract Rev.03/02/04 Whm-nn620-mac;TXOSTRFSIG,90785 84275 2 ADDENDUM TO EXHIBIT B Engineering Services The changes to the scope of this project are as follows: 1. Conduct periodic site inspections for purpose of checking contractor's pay items and provision of sign-offs to Client. Five site visits have been assumed for this purpose. 2. Attend meeting with the contractor during start of signal operations to confirm appropriate operation. One meeting has been assumed for this purpose. WHM will not perform daily construction inspection or monitoring. ADDENDUM TO EXHIBIT C Work Schedule The changes to the scope of this project are as follows: EXHIBIT C WORK SCHEDULE tember October November December January ID Task Name Duration Start 9/4 9/11 9/18 9/25 10/2 10/9 10/16 10/23 10/30 11/6 11/13 11/20111/27112/4 12/11 112/18112/251 1/1 1/8 1 Pre-Construction Meeting 1 day: Fri 9/16/05 2 Periodic Site Inspections 64 days Mon 9/19/05 3 Prepare As-Built Plans to City 15 days Fri 12/16/05 4 Submit As-Built Plans to the City 0 days Thu 1/5/06 ♦ 1/5 Task Milestone ♦ External Tasks Project:CoR,RM 620&Hosp.Dwy. Date:Wed 8/31/05 Split Summary External Milestone Progress Project Summary �* Deadline ` > Page 1 ADDENDUM TO EXHIBIT D Fee Schedule The changes to the fee schedule for this project are as follows: The lump amount payable under this Supplemental Contract without modification of the Contract is increased by$5,500 for a total of$20,000. 11111Yiiiii � 1 i • g , a .t �r .i- ,e LL r. A � t a IL ,.= . DATE: October 7, 2005 SUBJECT: City Council Meeting - October 13, 2005 ITEM: *10.F.2. Consider a resolution authorizing the Mayor to execute Supplemental Contract No. 1 to the Contract for Engineering Services with WHM Transportation Engineering Consultants, Inc. for design work on traffic signals at the intersection of RM 620 and the Round Rock Medical Center Entrance. Deuartment: Transportation Services Staff Person: Tom Martin, Director of Transportation Services Justification: This contract will allow for the inspection, review of invoicing associated with this project. Funding: Cost: $5,500.00 Source of funds: 1998 G. O. Bonds Outside Resources: WHM Transportation Inc. Background Information: The RM 620 and the Round Rock Hospital Medical Center entrance signal installation was awarded to Austin Traffic Signal Construction Company July 28, 2005. Construction began on September 21, 2005. Public Comment: N/A EXECUTED DOCUMENT FOLLOWS STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: WHM Transportation Engineering("Engineer") ADDRESS: 504 Lavaca Street#1175,Austin,TX 78701 PROJECT: RM 620/Round Rock Medical Center Signal Design This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and WHM Transportation Engineering,hereinafter called the"Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 9th day of September, 2004 for the RM 620/Round Rock Medical Center Signal Design for the sum of$14,500.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by$5,500.00 to a total of$20,000.00, and NOW THEREFORE,premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2. Engineering Services and Exhibit B. En ' eering'Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C. Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4. Compensation and Exhibit D. Fee Schedule shall be amended by increasing by $5,500.00 the lump sum amount payable under the Contract for a total of$20,000.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract Whm-rm620-rrmc;TX05TRFSIG;90785 Rev.03/02/04 R-o5-1C?-13-fOF�. 84275 1 WEM jTPf4NSPORMON ENGINEERING By:—)U6-k Date CITY OF R = 4AVED AS TO FORM:By: N ell, yor Sheets,City Attorney E5 Date Date Supplemental Contract Whm-rm620-mnc;TX05T"SIG;90785 Rev.03/02/04 84275 2 ADDENDUM TO EXHIBIT B Engineering Services The changes to the scope of this project are as follows: 1. Conduct periodic site inspections for purpose of checking contractor's pay items and provision of sign-offs to Client. Five site visits have been assumed for this purpose. 2. Attend meeting with the contractor during start of signal operations to confirm appropriate operation. One meeting has been assumed for this purpose. WHM will not perform daily construction inspection or monitoring. ADDENDUM TO EXHIBIT C Work Schedule The changes to the scope of this project are as follows: EXHIBIT C WORK SCHEDULE ID Task Name Duration Start ptember October November December January I 9/4 9/11 9/18 9/25 10/2 10/9 110/16110M110/30 11/6111/13111/20111/27112/4 12/11 12/18 12/25 1/1 1/ 9 1 day Fri g/16/058 --- -- 1 Pre-Construction Meeting - -- --- - — -- - --- ---- - ---- —J 2 Periodic Site Inspections 64 days Mon 9/19/05 3 Prepare As-Built Plans to City 15 days Fri 12/16/05 4 Submit As-Built Plans to the City 0 days Thu 1/5/06 ♦ 1/5 i i Task — Milestone ♦ External Tasks �— Project:CoR,RM 620 8 Hosp.Dwy. Split Date:Wed 8/31/05 Summary External Milestone Progress Project Summary Deadline Page 1 ADDENDUM TO EXHIBIT D Fee Schedule The changes to the fee schedule for this project are as follows: The lump amount payable under this Supplemental Contract without modification of the Contract is increased by$5,500 for a total of$20,000.