R-07-06-28-11C1 - 6/28/2007 RESOLUTION NO. R-07-06-28-11 C 1 WHEREAS, the City of Round Rock has duly advertised for bids for the Greater Lake Creek Park Improvement Project, and WHEREAS,Westar Construction has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of Westar Construction, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Westar Construction for the Greater Lake Creek Park Improvement Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject. of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 28th day of June, 20 WELL, Mayor City of Round Rock, Texas A STt -"-.MIJ R- CHRISTINE R. MARTINEZ, City Sec etary 0:\wdox\RES0LVPI\R70628C1.WPD/imC THE CITY OF ROUND ROCK PARKS&RECREATION DEPARTMENT BIDS EXTENDED AND CHECKED IWed Bagdad BY: AFD Round Rock,Tens. 78664 DATE: 5/167AG7 512)218-5540 BID TABULATION SHEET 1 OF I CONTRACT: Greater Lake Creek Park GR;Ww aeeN Pr%%d LOCATION:Council Cbaaben Westar Construction G Creek Construction Myers Concrete Construction DATE: 10 May 2007 Bid Bond?Yes Bid Boad?Yes Bid Bond? APPROX UNIT UNIT UNIT ITEM UNIT ow. PRICE COST PRICE COST PRICEt14 1-Site Demolition L.S. 1 $78,099.50 $78,099.50 $37,050.00 $37,050.00 $4,888.00 2-Silt Fence L.F. 10025 $2.50 $25,062.50 $1.75 $17,543.75 $4.00 3-Parking Lot Striping L.S. 1 $2,700.00 52,700.00 $2,600.00 $2,600.00 $3,345.00 4-Parking Stops E.A. 2 $50.00 $100.00 $130.00 $260.00 $100.505-Ball Field Backstop EA. 1 $7,500.00 $7,500.00 $9,750.00 $9,750.00 $15,172.00l6'x 16'Pavilion,including slab,columns EA. 0 547,000.00 50.00 $32,500.00 $0.00 $51,899.00 CORR 10 Construct 7-Concrete Sidewalk,including grading, carthwork S.Y. 15001 $59.12 588 680.00 $58.50 587,750.00 $54.00 $81,000.00 ORR to Construct In Area 6&7 8-Decomposed Granite Trail w/ribbon curb L.F. 6896 $4920 S53.30 $367,556.80 $55.00 5379,280.00 Tall stone veneer column E.A. 2 $1,500.00 $3000.00 $3,250.00 56,500.00 54,599.00 $9,198.00 10-Short stone veneer column E.A. 4 $1,100.00 $4400.00 $2,340.00 $9,360.00 $2,834.00 $1036.00 1 l-Playground Curb,including earthwork L.F. 380 524.00 $9,120.00 526.00 $9,880.00 $18.00 $6,840.00 12-Playground Drainage system,including earthwork L.S. 1 $5,200.00 $5,200.00 $13,000.00 $13,000.00 $4,368.00 $4368.00 13-Interpretive Signage,including columns, sign base,sign frame E.A. 1 $7,000.00 $7,000.00 $5,200.00 $5,200.00 $8,904.00 $8,904.00 14-Interpretive sign placard,including attachment,faateners,text E.A. l 51,000.00 $1,000.00 $1,300.00 $1,300.00 $3,318.00 $3,318.00 15-Wayfinding Signage,including columns, sign base,steel,earthwork,sign frame EA. 6 $2,200.00 $13,200.00 $2,405.00 $14,430.00 $3,113.00 $18,678.00 16-Wayfinding Sign Placards,including attachment to frames E.A. 12 $325.00 $3,900.00 $650.00 $7,800.00 $1,248.00 $14,976.00 17-Park Dedication Plaque,including attachment to column,fasteners E.A. 1 52,700.00 $270000 $4,550.00 $4,550.00 $1,673.00 $1,673.00 18-Hydroseeding S.Y. 10894 50.55 $2.60 $28,324.40 $1.00 $10,894.00 19-Volleyball Court,including sand,net,net posts,concrete curbum boudaty rope E.A. 0 $47,000.00 $0.00 $39,000.00 SO.00 S77 01.00 $0.00 CORR to Caarlract 20-Basketball Court,including backstops, Posts.concrete,steel,paint striping,earthwork E.A. I $99,000.00 $99,000.00 $179,400.00 $179,400.00 $237,487.00 $237,487.00 21-Dog Park chain link fence and gates, including fabric,fens,gate posts L.F 0 $12.00 $0.00 515.60 $0.00 $56.94 $0.00 con M Construes TOTAL MSEAW ff9S,l3[fN fg0?.?St95 fg51,6Sd10 ow EA' 3' 547013000' S4i 00 `539004.011 S39OlID.00' `$77 01.00 577 1.00 oodurt 11 ess Deduct item#20-Basketball Court EA 1 $99,000.00 $99,000.00 $179,400.00 $179.400.00 $237,487.00 $237,487.00 Deduct item#21-Dog Pak Fence 1LJF. 720 $12.00 $$,610000 S1 SAO $11,232.00 SS6.94 $40,996.80 . law TOTAL BID(1-21): 172,1795 $851,6suo Unit Price and/or Cat Do Not Mat Actual Cakaladon Cast DATE: June 21, 2007 SUBJECT: City Council Meeting - June 28, 2007 ITEM: 11C1. Consider a resolution authorizing the Mayor to execute a contract with Westar Construction for construction of the Greater Lake Creek Park Improvement Project. Department: Parks and Recreation Staff Person: Rick Atkins,Parks and Recreation Director Justification The Greater Lake Creek Park Improvement Project was competitively bid in May. Westar Construction is the low bidder. The construction contract is based on a revision of scope that was necessary to get the project under the established budget. Funding: $1,352,993.24 Cost: $695,936.90 Source of funds: LCRA Grant, TPWD Grant, 2002 GO Bonds Outside Resources: Westar Construction Backaround Information: The Greater Lake Creek Park Project involves three existing park properties and several parcels of land that the City already has or will acquire through the platting process of new neighborhoods. Clay Madsen Park, Greeniawn Park, and Lake Creek Park will all receive improvements in the form of new development and/or renovations. These three parks will also be connected with a hike & bike trail. Also included in this project will be the City's first dog park and inline hockey facility. This project is partially funded by a Texas Parks and Wildlife Dept. (TPWD) Grant and a LCRA Partnership in Parks Grant. Public Comment: N/A