Contract - HDR Engineering, Inc. - 4/27/2017 STATE OF TEXAS §
COUNTY OF WILLIAMSON §
SUPPLEMENTAL CONTRACT NO. 1
TO CONTRACT FOR ENGINEERING SERVICES
FIRM: HDR ENGINEERING, INC. ("Engineer")
ADDRESS: 810 Hesters CrossinLy, Suite 120,Round Rock,TX 78681
PROJECT: Transportation Master Plan Update
This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between
the City of Round Rock, Texas, hereinafter called the "City" and HDR Engineering, Inc.,
hereinafter called the "Engineer".
WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter
called the "Contract", on the 11th day of February, 2016 for the Transportation Master Plan
Update Project in the amount of$500,000.00; and
WHEREAS, it has become necessary to amend the Contract to modify the provisions for the
scope of services and to decrease the compensation by$120,000.00 to a total of$380,000.00;
NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract
is amended as follows:
1.
Article 1, City Services and Exhibit A, City Services shall be amended as set forth in the
attached Addendum To Exhibit A.
II.
Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set
forth in the attached Addendum to Exhibit B. Exhibit C, Work Schedule shall be amended as set
forth in the attached Addendum to Exhibit C.
III.
Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by decreasing by
$120,000.00 the lump sum amount payable under the Contract for a total of $380,000.00, as
shown by the attached Addendum to Exhibit D.
IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental
Contract in duplicate.
Supplemental Contract Rev.06/16
0199.1559;00375139 84275
HDR ENGINEERING, INC.
By: Et".4i:;,
r c.r--- r
Date
Supplemental Contract Rev.06/16
0199.1559;00375139 84275
2
CITY OF Ry D ROCK APP VED AST FORM:
By: , L
Alan McGraw,Mayor Steph L. Sheets,City Attorney
Date
Supplemental Contract Rev.06/16
0199.1559;00375139 84275
3
ADDENDUM TO EXHIBIT A
City Services
Attached Behind This Page
EXHIBIT A
City Services
The City of Round Rock will furnish to the Engineer the following information and/or perform the following
tasks:
1. Provide the following existing data the Owner has on file concerning the project, if available.
• Available existing "as-built" information, interface data, and construction documents for
projects adjacent to,crossing,and/or within study limits;
• Assistance obtaining required data and information from other local, regional, State and
federal agencies;
• Available Accident Data, Crash Records Information System (CRIS);
■ Travel Demand Models used as part of the previous Transportation Master Plan;
• Population and employment projections for base,five,ten,and twenty-five year horizons;
■ 2010 Census population data from the US Census Bureau;
• Available database (with name, address, email and phone number) of stakeholders,
neighborhoods and elected officials;
• Most recent aerial photography of the City of Round Rock;
■ Available 24-hour traffic volume counts for the last 5-10 years;
■ Most recent Geographical Information System (GIS)files from the City and other databases,
including Elerial mapping and associated data files that show the location of property lines,
street curbs, street names, trails, MPO boundary, topography (2' contours), known
environmental features, land use, zoning and other features that will be used to develop the
Thoroughfare Plan;
• Maps and or shape files illustrating location of existing shared-use trails and on-street bicycle
facilities and sidewalks;
• Site plans and details of proposed development projects;
• Round Rock land use and zoning map;
• Round Rock future water and waste water map showing future development;
■ Right-of-way map along major arterials;
• Utility maps along major arterials, upon request;
• Programmed transportation infrastructure improvement projects list;
• Round Rock Thoroughfare Plan;
■ Available stakeholder and neighborhood contact list;
• Other previous studies relevant to the project.
2. Provide the following documents to the Engineer for review:
• 2020 General Plan;
■ All adopted and ongoing City Master Plans;
■ Neighborhood Plans;
■ City Design Manuals;
• Downtown Parking Initiative;
• Complete Streets Initiative;
• Round Rock Bicycle Plan;
■ Round Rock Sidewalk and Trails Plan;
• Transit Master Plan;
• Context Sensitive Design Manual;
• Land Development Code;
■ Zoning and Subdivision Ordinances;
• Any Master Development Agreements for large infill projects;and
• Agreements regarding TxDOT roadways.
3. Assist with the coordination of any required public involvement, attend ane-on-one meetings with
officials, neighborhood groups, and local businesses and attend an open house, if necessary. For
public meetings,schedule and reserve the meeting location and place the required advertisements.
1
EXHIBIT A
City Services
4. Assist the Engineer, as necessary, in obtaining any required data and information from the State,
County, neighboring Cities and/or other franchise utility companies.
5. Give prompt written notice to Engineer whenever the Owner observes or otherwise becomes aware
of any development that affects the scope or timing of Engineer's services.
6. Meet on an as needed basis to answer questions, provide guidance and offer comment.
7. Assist the Engineer with timely review of draft reports and memorandums.
8. Form a technical advisory committee to direct the TMP update process.
9. Meet with HDR at milestones established in the attached 'Project Schedule" to review data and
solicit comments.
2
ADDENDUM TO EXHIBIT B
Engineering Services
Attached Behind This Page
Revised Exhibit B
City of Round Rock Transportation Master Plan update
Scope of Services
EXiSti }-62Ri tiOR re 11�,�d- �. .� ...v f ,�9i4paFiS9:�fnff j}u;"@a;�alternatives. Tr
uffi6
operatiens--at-GGngested-IGGatieps will b evaluated },. .aeteFm:ne shGFt term vera- rt Iu ienssthat
-ncz:T^v,vuccv-:o-vv-ccrz,z ^r9vc,n,-rrSvr
will be inflN p }
tag-the-iaventery-of-ex+st eg-data newly-Gellested--data and-tb"tiMate-resuRs-of4be--eahbr-atter-asfl
va-lidated Travel-Del-pride lat+eR-rnedels using
SynGhre far nne build and I)U44--Ge is
Gbtained fFem the travel demapd mode is-Y ill-tae-adjusted-as-nesessaPy-tG-aGGOufit-fer-altematn-rGutes-and
s will be ideflti#+cz—as—part- of
sarr�dartintersastian analysis-Anticipated-mabitity-aril-aGGess impFe ernants-will be identifed•-a
mGdeled to de}termine-their iMpaet-i;-,-iFAPraving4he4otore-traf4-spGrtat+Gn-systeni-. dway-segmeats
to deteAe }-;tee tease awe
defaGieRGy and a reGemmeRdafien-to alleviate this sed--prajeats(alterr at+ves
de„pin^oma ;^ Ta-sk a will ; Glude all des of tfanspGrtation�nsit>ding veh,,Gular-pedestriantra;Git,and
So he dF ment
(-T-SM}-andTrave-',pmand-Management* --9M�meas
a nJiTreTtcsted
for rMl-lit-ability duFinq the G-Arri or Analysis- 1=9R9 teFM Feadw-, vdil hp (AR-RI---A f,-updated travel demand FAG-d-R-1-9e
duel-Demand-Medel fa ies far r-s4nGkK4eg-Galsulations-forvG e4o
Gap2Gity{aties.
2) /_IC shape fila of the,updated FGadway networks;
3) All updated travel demand medel files; ap.4
Vit) All traffic a.,alysis files
5) A teGhn+ ndun4--surnn4arizing, at a minimum;the resultant-improvements ident#ed-by
the updated travel nd models and GGrridG,-analysis. The memo slaeuld-include-pr$jeGt
desGFipfieris arid GeSt estimates and will be FefeeF19RGed to the plated FnGdel
TASK 6 — Development and Evaluation of Multimodal Transportation System
Alternatives
All improvements to the transportation system will include multimodal aspects and will be developed in
conjunction with complete street principles. Multimodal alternatives will be developed based on the
following considerations:
s
■ Context sensitive design;
■ Complete streets elements;
■ Green streets;
—t-edeS#Fian-faGitities:
Task 6.1 - Identification of Alternatives - HDR and McCann Adams Studio (MAS) will collectively
develop a series of alternatives to be carried forward for evaluation.Alternatives will address all modes of
transportation as appropriate. The alternatives identification will be based on the items listed above and
based on the roadways identified as congested. Alternatives development will incorporate innovative
ideas and best practices. Below is a summary of the process to develop alternative improvements for
each of the categories listed above:
City of Round Rock Transportation Master Plan Update 6
Revised Exhibit B
City of Round Rock Transportation Master Plan update
Scope of Services
6.1.1—tri _�� i�Tc� una fl iavestiga#e{Ta ir�f�3str�+s-'.moo sG;�r�t}
mailable to-the Gi4yF-a ep-pGtentiaf ITS
ist .a+� .r.�htit—tel--demand-rnaragement but GaR alse-prev4de
effeGtive4rav44Rforaaati , make their Ge Mute GheiGes:
6.1.2 Cofitex"ensitive-Design�-he =IDR zan--.mil+-develop-corridor-specific Fessmmendations.
stakehGldeF tinncn,.,ss that presepi a--the
GlaarteF Gf the res R9 capacity-in add+ti^.„ the-14D 3 TeaFn-will--identify
pel+GY -Fesorr♦mendatiens-##gat-GaR-be--corisider-ed-ter- city wide-iMptentatien-threugh--ether
� -f-p— g the e tal
:Denis-aesthetic, histeFis, and-„ 1
and--efdsie
6.1.3-Complete Streets-Complete Streets allow for safe travel by those walking, bicycling, driving
automobiles, riding public transportation, or delivering goods. The HDR Team will analyze current
rights-of-way (ROW) along the congested corridors identified in the updated travel demand models
and develop recommendations aimed at achieving an appropriate balance between all modes.
Particular attention will be given to the potential for enhanced transit, pedestrian and/or bicycle
facilities that reduce forecasted travel demand without the need for street widening or ROW
acquisition.Alternate routes will be considered to reduce travel demands to protect corridor character
and to avoid the need for roadway widening. The HDR Team will also provide recommendations on
corridors that were not identified to be congested on how to integrate multimodal aspects within
available ROW to implement the"complete streets"elements. In addition, the HDR Team will identify
policy recommendations and best practices that can be considered for city-wide implementation
through other transportation/infrastructure projects. Such policies could include revisions to the
Transportation Criteria Manuals, the City's subdivision ordinance, and/or to the Land Development
Code.
6.1.4-Green Streets-The HDR Team will identify potential green solutions along major corridors
that create aesthetically pleasing locations but also compliment corridor drainage and water quality
issues. Possible recommendations could include:the introduction of rain gardens or bio-swales within
public ROW to intercept urban run-off and to reduce downstream flooding; landscape and streetscape
standards to create a more comfortable and aesthetically pleasing pedestrian environment; and the
use of native plantings to reduce the need for irrigation and water consumption. The HDR Team will
also identify green solutions and policy recommendations that can be considered for public and
private development projects including Low Impact Development strategies that reduce urban run-off,
and landscape standards that contribute to street beautification.
6.4.6 improved GolleGter Network HDR Will We* Glesely with Gity staff and the Rei@hbeFh0GdG_
to ideritify an irripFeved and GerineGted GelleGtei:netwG*for the City. The improved R8(WGFk will better
mand-tt{FBFigtie,.t the nefie,r._ rather t an GR slRQle-rGadways FeGWItiRg iR h11he.
vehiGles-mfles traveled The GelleG F PIaR will be develeped Ina Fnanner that p e,cs ge i unity
e PTSefheGds.
6.4.6 Pedestrian FaGilities The HDR'T-_ea'm',.4iI the GUFFerit sidewalk plari arid develGp
FeGGrnFR6RdafiA__AG that e-gaps-within .. istiRg-syster-P,and-pr-mide-sentinuity-.--Standards
that meet the Griteria Of WRiVPFS2I R99196s arid enhaRGe pedestrian safety arid ease of FnGverrierit at
iRterseGtieris, key aGtiVity areas arid aleng neighbeFheed streets and G91FIFFlunity aGtiVity areas (SUGh
as-sc;^,9e4 Rded-T4*-prepese 4-e mance the
it vehi
644 -8 syrsle-Faas+#+#les - T-- he team will review the Round RGGk BiGyGle PlaA tG PFOVide
t , ad
eppertunitie "piRg--tG-gaiR-en-street-bike- Res-wfthia-existing-readways-without
o knewn as"Gyele-
redusiflg-ve#'
Rr gh..Fe,.d use paths in parts ef the Gity that have the hig st potentialfar biey6{e-Fidership-
and-tk�e expaRsie t of eff street-tr-ails-;;et^:eeri--ipajar destiRatieRs andlor-t#Fough
City of Round Rock Transportation Master Plan Update 7
Revised Exhibit B
City of Round Rock Transportation Master Plan update
Scope of Services
P"bk-Gpt�=r sF'n Th �rn�n d d +' II h + +
mm 201,
- Rk3bti6� a Sig nip, ria&GFPGF-ate-the4r-a;4s4-4asteF-1p!aRRiRg GffeFt GUR:entl_ L FfdeRNay
SMP.�wi14-4dep&y—,ef4derc that Gan pre id bett , thFGugh MoVeMent with-traast
sePAGG-G.ti F_SQV—LG' catiea and-feata,tis 9f-4fa;4sit-eRhaRGeFneRts—suss �s-t aFrsit-se,�teFs-step
irnpFeverAeRts aad slarif+satiAR ofp0'iGies-;ecar�+Rg fie iRstaltatieFFe€bis b^R,�-pas-shelters aad bes
Shtinc.csm2Rhjes will be reviewed R3endatteRs.
T;;i;k v 2—;-uuJuati8J��'F Altprnatt.mg Thn MDR T� FRBtiveB-ie
dove veFtatieR—f
reutes/GeRReGtieRs-will be analyzed in ti4d-as-pa+#-of4he Gonider-analysis. ssumptiens-ugzed
..l dernand fereGaSts---based on these Tuffirnedal alteMatiVeS Will be d eRted.
Ir}Ravati-ve--sakAoRs#e traditienat sapasity4ssues-wil4-a1sa-a ideRt„;ed-fGr-s r;sideFatien.-€valaatien-wiil
iRseFpa•ate the eals and pGIiGiGS Gf the GeReFal
safety aspeets.
Deliverables-( w-d ert iR&IFIdIRq, at le faGilities;
peliGies;-aAd f41nding-ep4eF3 4iAGI ding iFAPaGt faces as well as iRRe,,.,t +• F alternatives tta
TASK 7—Capital Improvements Plan
The HDR Team will develop a Capital Improvements Plan, identifying improvements the City will need
over the next 25+ years. This task includes a review of current plans and policies relevant to
transportation to develop an initial list of roadway improvement projects and transportation related issues
of concern to local citizens and staff. The HDR Team will compare already proposed improvements in
these documents to existing conditions, and against the projected conditions from the travel demand and
corridor analysis models. HDR will also identify issues on an intersection and corridor basis, considering
the following: pedestrian access, bike lanes, transit facilities/routes, economic vitality, protection of the
environment and city beautification. Using City staff and public input, and the results of all data collection,
travel demand model results and corridor analysis results, the HDR Team will develop recommendations
for policies to be incorporated into the City's TMP. All travel modes will be addressed, ensuring that the
Plan will address the needs of all citizens and visitors to Round Rock. A thoroughfare map illustrating the
proposed improvements and timeframe for implementing improvements will be prepared as part of this
task.
Task 7.1 -CIP Project List-Based on the analysis and evaluation described in Tasks 5 and 6,the HDR
Team will develop a list of recommended CIP projects on an intersection and corridor level.
Task 7.2- Cost Estimates -The HDR Team will develop probable construction cost estimates for the
proposed multimodal improvements identified in Tasks 5 and 6. All assumptions utilized to develop these
planning level cost estimates will be documented.
Task 7.3-Project Ranking Criteria-The HDR Team, in conjunction with City staff, will develop project
ranking criteria to evaluate the improvements and to prioritize them based on implementation timeframe.
The systematic and detailed analysis used to evaluate potential transportation improvements in Tasks 5
and 6 will provide important information regarding the prioritization of proposed improvements. The
analysis will provide policies,a clear systematic evaluation of each scenario, and a recommended ranking
order for the alternative scenarios which will be included in the report. This ranking order will be used to
prioritize implementation in the short-term (present to year 2020), intermediate range(2020 to 2030)and
build-out conditions, based on demand and feasibility. The prioritization will also include identification of
the agency or agencies responsible for implementation.
City of Round Rock Transportation Master Plan Update 8
Revised Exhibit B
City of Round Rock Transportation Master Plan update
Scope of Services
Task 7.4— Funding Plan —HDR and Prime Strategies will develop a funding strategy to implement the
proposed improvements to meet the multimodal mobility challenges for the next 25 years.The HDR Team
will evaluate existing funding sources and identify potential new and innovative funding mechanisms to
implement the improvements.
Deliverables(Hard copy and electronic formats):
1) Table of proposed projects/alternatives including ranking, cost estimate and year of completion.
Key maps of projects will be prepared.
2) Matrix summarizing available funding sources, project costs and potential new innovative funding
source.
TASK 8—Transportation Master Plan Document
The findings and recommendations of Tasks 1 through 7 will be summarized and documented in a draft
and final City of Round Rock Transportation Master Plan Report. Findings, assumptions, and
methodology used in the TMP development will be explained and documented in a Draft and Final
Transportation Master Plan. The main document will be designed to be user friendly with clear and
concise text supported by high quality graphics and maps that the general public can easily understand.
Recommendations will be explained with the minimal use of technical jargon and in ways that clearly
explain their intent and value to the community, and their relationship with the General Plan goals.
Appendices will provide detailed information and technical back-up to support the recommendations.
All study activity will be documented throughout the duration of the project so as to maintain accurate and
consistent records of all data collection, forecast activities, alternative assessments and recommendation
development. The HDR Team will address all transportation modes in the Master Plan including autos,
bicycles,pedestrians,and transit. This task will be completed with the following subtasks:
Task 8.1 — Summary of Goats and Objectives —HDR will summarize the vision, goals, and objectives
for the City of Round Rock TMP for the build-out condition. This task will be accomplished with the
extensive input of the Technical Advisory Committee and City staff. The City's commitment to multimodal
transportation solutions and their inter-relationship with other community values expressed in the General
Plan (e.g., improved mobility, economic development, health, environmental sustainability, livability, etc.)
will be clearly explained and illustrated.
Task 8.2 — Summary of CIP Projects — HDR will summarize the proposed projects for the CIP. Brief
information sheets will be prepared for each project and will be included in the Appendix of the report.
Task 8.3 — Summary of Mobility Improvements — HDR will include a summary of the alternatives
evaluation process in this section and include a list of improvements that were identified for the TMP.
Task 8.4— Bicycle and Pedestrian Plan — HDR will include bicycle and pedestrian elements into the
roadway cross-sections as needed to guide the future allocation of local resources to address the needs
of bicyclists and pedestrians for mobility and safety within the community.
Task 8.5 — Prioritization of Improvements — HDR will include a summary of the prioritization process
conducted as part of Task 7 in this section. Tasks 5 and 6 will provide systematic and detailed analysis to
evaluate the potential transportation improvements.
Task 8.6 — Draft and Final Reports — A draft report documenting the methodology findings, and
recommendations for the study effort, will be prepared and presented for approval. After receiving
comments from the City of Round Rock, Appointed Committee, City Council, and Planning and Zoning
Commission,a Final Transportation Master Plan Report will be prepared.
City of Round Rock Transportation Master Plan Update 9
Revised Exhibit B
City of Round Rock Transportation Master Plan update
Scope of Services
Deliverables (Hard copy and electronically in PDF and MS Word format): Draft versions of sections of
the TMP will be submitted to the Project Manager electronically in PDF and MS Word format throughout
the project as they are completed. These interim reports correspond with final report chapters,which will
be organized following consultation with the Project Managers. The final document may be prepared in
InDesign to allow for a well structured document with a pleasing and clear visual aesthetic with high
quality graphics. The organization for the final Transportation Master Plan Report will be developed in
close coordination with the City staff.
A one page document will be prepared to include goals and vision of the transportation master plan and a
prioritized project list for distribution to the public.
City of Round Rock Transportation Master Plan Update 10
ADDENDUM TO EXHIBIT C
Work Schedule
Attached Behind This Page
No Text
ADDENDUM TO EXHIBIT D
Fee Schedule
Attached Behind This Page
SUPPLEMENTAL#1: EXHIBIT D-FEE SCHEDULE
CITY OF ROUND ROCK TRANSPORTATION MASTER PLAN UPDATE
PRIME PROVIDER NAME:HDR ENGINEERING,INC
PROJECT NAME: CITY OF ROUND ROCK TRANSPORTATION MASTER PLAN UPDATE
Provider Name TASK 1 TASK 2 TASK 3 TASK 4 TASK 5 TASK 6 TASK 7 TASK 8 Direct TOTAL COST
Expenses
HDR Engineering,Inc. $19,200.00 $43,080.00 $11,160.00 $39,320.00 $68,400.00 $2,200.00 $29,280.00 $36,280.00 $4,080.00 $253,000.00
Rifeline $2,200.00 $17,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $300.00 $20,000.00
Prime Strategies,Inc. $5,896.00 $3,420.00 $0.00 $0.00 $0.00 $0.00 $12,250.00 $320.00 $114.00 $22,000.00
McCann Adams Studio $10,080.00 $10,320.00 $25,000.00 $0.00 $0.00 $18,420.00 $840.00 $10,340.00 $0.00 $75,000.00
Gram Traffic Counting,Inc. $0.00 $0.00 $0.00 $440.00 $0.00 $0.00 $0,00 $0.00 $9,560.00 $10,000.00
UTCTR $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Lump Sum Fee $37,376.00 $74,320.00 $36,160.00 $39,760.00 $68,400.00 $20,620.00 $42,370,00 $46,940.00 $14,054.00 $380,000.00
ORIGINAL FEE $ 500,000.00
REDUCED AMOUNT $ 120,000.00
REVISED FEE $380,000.00
SUPPLEMENTAL-EMM IT O-FEE eCHEDULE
FUME PPOVIOEN MAME:MOR ENOINE[Mq INL.
CITY OF ROUND ROCK TRANSPORTATION MASTER PLAN UPDATE
eENgR eE.- fEMOR ISE eepR TOTAL TOTAL
TASK PROJECT PR04ECT TNAFFIL ROAUWAI DEVON GRAPHICS IAUOR LA_It
TALK pFeCR'PrIDN PRVCMAL MANAGER ENGINEER EWINFER NCv9EER IT pEeIGNER CTPRICAL NRe. COeT
RaM Wn
I J nnI vinr; t t/
1] Pmarl M 1 m
a yl )OA m
0
a Laeran,llen.�a wMln v.Nl�I IIw;
2
mlb.nw le Bao
Iw
J wRavl,w aM EwNrlen nl E,I♦Iln CI O_22—
:ermnl♦am Pdicl♦.v.:IHPceinmMa
e
12 29 WjW
J] Pm Ilw wmnrLq♦I a e
rvu CnM A
pM.CMI♦cllon aM pre
�A
6 Trawl O♦nurW Llobl CoalOarAm1 I,.nCTr.wl Burv,
0♦w1 m♦n1aM Ev.luMlan a/MWilrmbl Trm♦ one.♦m Nl.tnMlw♦
n
La II I,Plan
M
ih r t l
a _
Trm Itllm YaM♦r Fan Oecum.rl
Aul M
I M,,
a mF' arum
e.
r1pURS eULL101A1e 0 2411 i64 ]8 tl0 ase saN 9X100
tOTN NlOil tl?4te spm seanmm Ta aOpm llmm 3m amm 1A1m ca J '. fnpm 3aa1.9N C0
eUDTOTAL
lab.9fi 00
Olr.clGwt Cw•Ilcl poll Ou.nllly Anwml
etrNSU Vw O E'.
so III
nbnN lL'atwo6auGl Sa Q00
]M
r Fa
n1 1
P
tT MN p � r4]
TI
�f M
MM1u 1 NIS PU IAAu 'A15000
Wl4TOTAL ORf cT Cpei
f]�.vtaoo
MOM,cOBT� T-TA�\UMPSUA( EE 'OU6bo
IIUPPLEMENTAL}t:ENIOR 0•FEE IICNEME
ROME PIANpER NAPE:-FLINE
CITY OF ROUND ROCK TRANSPORTATION MASTER PLAN UPDATE
ACCIXIMT TOTAL TOTAL
VILE AIIIIIbTANT LOORpiNATO ApNIMlTR LAOOH LAOOR
AIIK OFIif:RwTNIN PR1l;IPAI PREMEW ORELTOH WFIECTOH R A IMi IMB. LOIIT
K Ro act wro em.
Al ioNPA.
7.
0 nm
} Coordrollon aM Pudlc Particl I
aN PYn
}mom
f
! La rManalw P.NawaMEvaluNlon of Ealall CII pxumanlaaM Ra:claa wllA RacomronbaOorN
Ln r
A ala CdlacllonaM Ro d10na
b TrmlOanwnO AbUaI Corrtror Anal I.and Tnwl burva
b I T y,JO
pwal IaM Evaluatlanel MelUmeGcl Traro onl al mAira�nMiwa
T Ga Ilal
�P
liana WI Maa rRan
Summa rfun O
t
b P
u.rprALII rs o 11b 31}rob.w
H-rl. )n ;mm )1pw wcp bw sow
IOIN.IN%]R fl)STM1 'a JpOm w mm Wm 31},100.00
IIUBTOTAL
tl!)00.00
D-1 Lml cmUan Unll OmMIIY Arrwnl
llvga0l'wl pis
som
a'Na Mdau4lLCYae Bauch l2Ow uvll
11 tQ IF sow
r
t l r11 P v 1m '
11}Ir cm b tnm
1sn snwl T
u' f0505 Pr Mlu aw fJT1000
nup-TLrAL LABLn co ac 1w ob
tot L' 97r ':TOTAL LUMPA "i" 4m vq.An
SUM EMENTAL•I:E—ILD-TEEa EDULE
iP C PROLPpE.q NAME'PRMIE PTRATEOIEB NC.
CITY OF ROUND ROCK TRANSPORTATION MASTER PLAN UPDATE
TOTAL TOTAL
PoPRINCIP MAO
TAPN TAIIII DFSCPIION PROJECT VOFH PIANMEq CLERICAL�CCTADM- BOR ADO
LALR
NAf,FIWf COPT
Prn.cl M.n..vriml
M
N
) CPwElrutlan.n I ILLI,P.NIcI.I
n f mrvi �
21
ro
C wq.N.w.ml ErNUN!on of EelM f.0 prcrm.N. w
r. tom
Prnw,r itu.unn,mmem.kx xry(w.
D 00
t DN.fdl.cibn NrO Pro :flan.
.)
Gn
5 Twwl O.nund MoeN ConlEer Arul 1 antl Trawl]
M
f [O
D.vN I.b EvtluelbnolMdllwnwt.l Tr.n. mP.
C.INI in o
IAn qml" C+r V �1
.DO
e Tr.ru .na.t u.N.r a.A oMum.nl
p
rin,
Pr
tti ,A In owr 00
IKAIR9 aUP-rOTALa S•
19 a 0LJI..a CO
IOTN.I MpII CDaT6 IS)0000 WON OMI tP191.1 H1 NI T00 000 SO 00 4Z 1.1.9.00
--AL
at uaco
Dlr.cl Co.l r'OPU UNI W.NDy ArrouN
NL,noaal�Ar , 9.e P.m
57(0 IF
10
W on
I Lyypur.MaNr.W DUYtm.Bv,cO sT�
u )ro E
1tr.wrP,
r
to roe ser 9m
unFroiAa olHEcr cpar
)O u9.m.,t..w
T6 A�COBT H .TOTAL LUMP SLIM FEE Fxecu se
eUPREMENt AL at:EJ015R p•FEE eCI1E0ULE
PrCHF I%VIOEH NAME:MLLANI ApAM{eTVpq
CITY OF ROUND ROCK TRANSPORTATION MASTER PIAN UPDATE
VRDAN MIAL ICTAL
TAeN TAeR RFeCPoV11DN PROJECT DEB)WI INIOH LAWP
PRaICpAI 0.AMCR GRAPNN:e IMe. COST
Ro IMan
12 0 tow
3,mom
12
rk
Ih y1
I v Dt
S Lmr011uNun,nA Pugl0 Par11cl I
I) M0 0
IW EnI or ENI CII DxunxNa,ml PWlcla.wllN RKormxnE
a Rwnonmx�, 1I.—
$1,1MM
S.B ro
43
low
oN,LWbW RJ Ro r
Aa
0
6 T-1 O—m dMWal C.111.1 A- I.anO Tra.N eury
low
B O.vN laml Ev uNbn Of MWII�rmOalTnua ,m All.rnNMa
20
som
WIMCQ
0
0 Trani Nlon MUI.rRm Oacunxn
Ifk 0
mrh
3 1I ) 0
R
M
I—R. -TOTALe 216 99 0 0 0 00 6aS {]b OCO 00
1FItN.1 NNStl CD51e Blit/Ur 310)•nm NWro 0p 0p {)SGW 00
9UNtOTAI
1]3 OSO.CO
N'..C-1 Cwnrul �Jt Ouam:lY Muuq
SlxalxJl'u Oa3 nNl
IWUJx.Mu!xula DaCpwa Sua171 3]000 wJl
W Op
Sim
5
u ws p I;x
elmrorAl Rwecr Goer ��
TOTALTCOSTTbTAL tUhIP SilAIfEE -lI{Sec tiB
6UPPLEMENIAL EI:EfUIOR D-I I E—IE DOLE
PNMEPIIDVIDER«AME:ORAMTRAFlI lNIINO Y,C
CITY OF ROUND ROCK TRANSPORTATION MgSTFR PLAN UPDATE
PROJECT TOTAL lOrA
TAfK TALK OEBCRIPIpN 4ANA0 N LABOR LABOR
1 Rc 14,n wnl 1111,1. L..
11 0.
IIQW
P. drtw
�I
1tul=n Lenrtln,llon•nY Ar4lc PaKicl•Ilon
rn
som
1aW�NWauw n
6
D
J C r.A.n.lw lLN.wab Cr,luall oI EN.II I Daum.nl.«wl IR R,con rablle�u
JO m�nl roD.w.,
0
o,l•Cdl.cRnn ane Pro.dim.
, O
D
5 Trawl D.mand Mne.l Cc�rldar Mvl I.•ne Tr.vN lu
a
O.vd• .ne Ev.lutllen olMWll•rmddT,n. 1•oonl d.mbl«nd w.
1 c.Iw M•n,n
�n I
65
I n + Cna«W
0
Tr.n. on Ma.l.r pan llacum.nl
n
IIOVRf lUI4TOTALI 0 n 4 Y.,O.0
D'PCln
Wow
I.-IAfiOR COSTS ,ow J.T — Nw.W
oru
6D.cICnl CCMlacl Ou•Mlly
awY Ib O a DNI mounlm
««a ra.ow.soo�ol i2.W0
s,w IF
DI
d
el
I rarltwP a
D]
IR
N.S 500 J6y ftYl
ERR-OKtt CT COIi fl SlY w
L LAIIUN aaao
TOTAL Cb9T .. TOTAL LIAdPSIkA.. tU eo/m
BUPPEEME—.i:—10R D-I I E KIIE.ULE
P E P DERE:UTLTH
QTY OF ROUND ROCK TRANSPORTATION MATER PLAN UPDATE
TOTAL TOTAL
TARN❑EY:NriION ��ARC11 REBEAHCH 11EBEAPCII
TARN fIgIME0. A.—TE ABf:BTANT LNBOR ODOR
RoMM.
R
10 Rr �
11 lE0
2 Leord1-1.amlPWla r.nlN atlen
0
15
0
ww
E�t
L wP.M.w.ndE alu.l al Eal.11+ I DncwrwnM arM lt+lkl.M
C 7.
�� R nano,,,m�.w,
1 on cMl.Nlen.!a
d WdN C.Mdw Anil I.aMTrawleury
61
Mv.l t.M EvaIYNlOn of Mulll+,octal raan.
0 low
Ca 1 to%.n
� rr II
0 rm
t Tr.na (anon Y,.iN Ran Doc,m.nl
B1 nl fe J.arMOl
nl
n
t m.M rwrrNnmPMn
n
NOIIW BUU.TOTAL6 B B ]M
B tam
Htrn,INutn cnstN ow som m wm Tai m sDm W.W
—TOTAL
wm
Dle.ct Le.l ConlrM Unll INnnttlY Amo,nl
YtagMJPw 045
Igmdv.Maf�aN LFWhsn tMucl+ 11000
MMn rM.
1+Ir Dnv r
sJ� o nou
BUD.TUTA(OYECT COBT
sJ Bo
BOTALjCd87� .TOILALLUMP Sum FEE m
T, ,,I,
! �
!
� |
�t! .
§ �.- -11
H-.;
n-14-
-„ t �,ri - , ,-
CERTIFICATE OF INTERESTED PARTIES FORM 1295
loll
Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY
Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING
1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number:
of business. 2017-193993
HDR Engineering, Inc.
Austin,TX United States Date Filed:
2 Name of governmental entity or state agency that is a party to the contract for which the form is 04/18/2017
being filed.
City of Round Rock Date Acknowledged:
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a
description of the services,goods,or other property to be provided under the contract.
00000
Transportation Master Plan-Professional Engineering Services
4 Nature of interest
Name of Interested Party City,State,Country(place of business) (check applicable)
Controlling I Intermediary
HDR, Inc. Omaha,NE United States X
Little,George A. Omaha,NE United States X
Keen,Eric L. Omaha,NE United States X
Felker, Brent R. Davis,CA United States X
O'Reilly, Charles L. Boston,MA United States X
5 Check only if there is NO Interested Party. ❑
6 AFFIDAVIT I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct.
MICHELLE M BRITTON
NOTARY PUBLIC /
f�a State of Texas
Comm.Exp,06.27-2017 S (nature/if ajithoriz ontracting business entity
AFFIX NOTARY STAMP/SEAL ABOVE
Sworn to and subscribed before me,by the said � �PC1 T� this the day of
20 ,to certify which,witness my hand and seal of office-
I C hill '
Signature of officer administering oath Printed name of officer administering oath Title of officer addWistering oath
Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.883
CERTIFICATE OF INTERESTED PARTIES
FORM 1295
1 of 1
Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY
Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING
1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number:
of business. 2017-193993
HDR Engineering, Inc.
Austin,TX United States Date Filed:
2 Name of governmental entity or state agency that is a party to the contract for which the form is 04/18/2017
being filed.
City of Round Rock Date Acknowledged:
04/25/2017
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a
description of the services,goods,or other property to be provided under the contract.
00000
Transportation Master Plan-Professional Engineering Services
4
Nature of interest
Name of Interested Party City,State,Country(place of business) (check applicable)
Controlling I Intermediary
HDR, Inc. Omaha, NE United States X
Little,George A. Omaha, NE United States X
Keen, Eric L. Omaha, NE United States X
Felker, Brent R. Davis, CA United States X
O'Reilly, Charles L. Boston, MA United States X
5 Check only if there is NO Interested Party. ❑
6 AFFIDAVIT I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct.
Signature of authorized agent of contracting business entity
AFFIX NOTARY STAMP/SEAL ABOVE
Sworn to and subscribed before me,by the said this the day of
20 ,to certify which,witness my hand and seal of office.