R-07-08-23-15E1 - 8/23/2007 RESOLUTION NO. R-07-08-23-15E1 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract" ) with F.T. Woods Construction for the Round Rock Police Facility, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 4 , Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 4 to the Contract with F.T. Woods Construction for the Round Rock Police Facility, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 23rd day of August, 2007 . 0:\wdox\RESOLUTI\R70823E1.WPD/r c NY&E Mayor City f Round Rock, Texas A T ST: CHRISTINE R. MARTINEZ, City Secret y 2 EXHIBIT uAn ROUND ROCK POLICE FACILITY CONSTRUCTION CHANGE ORDER Project: Round Rock Police Facility Change Order No.: 4 Address: 3001 Tellabs Drive Initiation Date: 8/2/2007 Round Rock,Texas Contract For: General Construction To: FT Woods Construction Contract Date: 2/22/2007 1966 South Austin Avenue Georgetown,Texas 78626 (Contractor) The Contract is changed as follows: (#15)Addition of two UPS(Power Sources) Add $ 41 242.97 (#17)Demo drywall&studs @ riser room 399X and 207X Add $ 5,756.67 (#34)Relocate fire system annunciator from room 339 to room 408 Add $ 931.59 Total $ 47,931.23 This Charge Order is not in effect and will not be induded in the Contract Documents until signed by the Owner Ardritect and Contractor. Changes inducted herein are subject to all conditions affecting them under the substitution section Summary The original Contract Sum was:......................................... ............. $ 10,884,000.00 Net change by previous authorized Change Orders:.................................................... .......... $ 50,926.79 The Contract Sum prior to this Change Order was:............................................................ $ 10,934,926.79 The Contract Sum will be increased by this Change Order $ 47,931.23 The new Contract Sum including this Change Order will be:................................................ $ 10,982,858.02 The Contract time will be changed by( 1 )days: The Date of Substantial Completion as of the date of this Change Order therefore is: 12/8/07 Brinkley Sargent FT Woods Construction City of Round Rock 5000_2 gtiuixi">tre, uite 600 1966 South Austin Avenue 221 East Main Street Addti'r3Sst ex Address Address 4. ` J el3allas lexas`752` �,°` Georgetown,Texas 78626 Round Rock,Texas 78664 t" By z-, Ga R S.C. Inman, IV Mayor,Nyle Maxwell 8 01 9 /Z/o-7 Date Date Date P.O.Banc 122 Gemrgebown,TX 78627 M�LJJnc Ph:512-930-2607 r Y Y Construction Lange Request To: Cary Beeman Number: 15 Brinkley Sargeant Date: 5/16/07 5000 Quorum Suite 600 Job: 2007-010-001 Round Rods Police Department Dallas,TX 75240 Phone: (512)238-0930 Ph:972-960-9970 Description: Add UPS systems We are pleased to offer the following specifications and pricing to make the fnGowWV changes: Addition of two(2)15 kVA American Power Conversion(APC)UPS systems. Units are capable of 27 mkxrte ful-load capacity nnrttinhe. Lead time is 2 weeks kvm order time. Revised 05/23/07 for OH&P markup revisions. Revised 06/04/07 to khaease swe of one UPS unit from 15 kVA to 20 kVA. The total amount to provide this work is.................................................................................................. $41,242.97 (Please refer to attached sheet for details.) The schedule is not affected by this change. If you have any questions,please contact me at 512 .2607. Submitted by: SC Inman Approved by FTWOODS Date: Cc: Pa9e 1 of 2 i P.O.Boot 122 Georgeirmi.TX 78627 RWGODS Ph:512-930-2607 Construction Change Request 15 Price Breakdown Continuation Sheet Description: Add UPS systems Description Labor Material Equipment Subcontract Other Price Electrical $34,966.53 =34.966.53 Subtotal $34,966.55 Pm1ct 104anaganerd $60.00 Field Management $180.00 Insurance 535206.53 0.61% $214.76 Bond $35,421.29 0.81% $286.91 Overhead $35,708.20 10.00% $3,570.82 Profit $39,279.02 5.00% $1,963.95 Total: $41,242.97 Page 2 of 2 i 1405(ECEUR ST. ' TAYLOt,TX 70574 OFRCE(512)365493FAx } (512)3S24275AC14 MaOsecMoMMEr i TDLR LKx4uE*19676" i CHANGE ORDER REQUEST E f 1 CHANCoF ORDF R-RRPD-(:O#3 UPS UNITS { r I DATE: MAY 15 2007 NAME.: SC INMAN COMPANY: !iT WOODS CONST. PROVIDE 1-I5KVA AND 1-20KVA UPS SYSTEM PER PROVIDED RF.QUIRFMF.NTS MATERIAL(SEE A'1TACHED SHEir Q $31,700.00 TAX sm MATERIAL TO'T AL $31,700.00 LABOR 0.00 INS-17ALLER HOURS AT 525.00 /HOUR 50.00 0.00 JOURNEYMAN HOURS Af $35.00 /HOUR $0.00 1 1.00 PROJ1:�c;I*MUR.HOURS AT SO.00 /HOUR 565.00 SUBTOTAL I.AROR $65.00 PAYROLL TAXES @ 35% $2-2,75 LABOR TOTAL $87.75 MISCELLANuUUS mpuNSI s EQUIPMENT RI-WrAI. $0.00 PI.3tMTTS $0.00 T=Riwa IT x.00 MISCELLANEOUS TOTAL $0.00 MA'T'ERIAL $31,700.00 MISCELLANWUS 50.00 LABOR 587. 5 SUBTOTAL $31.787.75 OVERHFAD& PROP'TI'(10'Yo) $3,178.78 TOTAL L 534.9".53 RagWaGed by Rte Texas DepwUm t of Umnsin8&RegulaWm P.O.Bax 12157.Amm.TX 78711,1 902,612-463-6699 HIS W*Vt--lxc. ltse m bus/� 1405 COWM ST. �► C) -OSS TAYW04TX7W4 OnwE FAX Fiut(512)3522 52'75 ' ACbLMCKQ69CGL06A..NET TDI.R UCENBE�1987'ts TIN6034M1194 tiac MoM CHANGE ORDER REQUEST i CHANCE ORDER-RRPD-(:0#3 UPS UNITS f i DATE: MAY 15 2007 NAME: SC INMAN COMPANY: FT WOODS CONST. PROVIDE; 1-I5KVA AND l 20KVA UPS SYSTEM PER PROVIDED RI:Qt1IRrMI-NTS i MATERIAL(SEP.A71-1'ACHLD SHEFI) $.31,700.00 i "TAX I� i MATERIAL TO'1 AL $31.700.00 i F LABOR 0.00 INS TALLER HOURS AT 525.00 /HOUR 50.00 0.00 JOURNEYMAN HOURS A'i' $35.00 /HOUR SO-00 j 1.00 PROMCU MOR.HOURS AT 565.00 /HOUR WA) i SUBTOTAL LAROR $65.00 PAYR0I.1.TAXES(a 35% $211-5 j LABOR TOTAL $97.75 MISCBLLANHOUS EXPENSES I EQUIPMENT RhWrAI. $0.00 PERMITS St1_l10 rwwa rr $p pp MISCELI.ANKOUS mul. fi MATERIAL $31.700.00 ? S MISCELLANEOUS 50.00 LABOR7.�5 SUBTOTAL $31.787.75 OVERHI<;AD& PROM'1'(I(We) $3,178-79 TOTA1. S3L966.53 Regulated by the Texas Depamm t of Llo jmV&ReguWjom P.O.Banc 12157.Austin,'TX 78711, 1400-803_3M 512.463.0599 Website: WWKfiC W.StA--bc.us/a0=Wkrts i APC Legendary Reliatality' APC Smart-UPS VT IRVA 208V w/4 Batt Modules, Start-Up 5X8, Internal Maintenance Bypass Part Number. SUVT15KF4B4S Output Output Power Capacity 12 kW/ 15 kVA Max Configurable Power 12 kW/ 15 kVA Nominal Output Voltage 120V,208V,208V 3PH Output Voltage Note Configurable for 208 and 220V-3 Phase Efficiency at Full Load 93% Output Voltage Distortion Less than 5%at full load Output Frequency(sync to 57-63 Hz for 60 Hz nominal mains) Crest Factor Unlimited Waveform Type Sine wave Output Connections (1) Hard Wire 5-wire (3PH + N + G) (1) Screw Terminals Input Bypass Built-in Maintenance Bypass,Built-in Static Bypass Nominal Input Voltage 208V 3PH Input Frequency 40-70 Hz httPJ/www.apcc.com/products/print techspecs.cfm?tab=models&part num=SL VT15KF4... 5/16/2007 Input Connections Hard Wire 5-wire(3PH + N + G) Input voltage range for 160-240V main operations Other Input Voltages 220 Maximum Input Current 40A Input Breaker Capacity 60A Batteries & Runtime Battery Type VRLA Included Battery Modules 4 Typical recharge time 5 hour(s) RBCTm Quantity 4 Typical Backup Time 65.5 minutes (6000 Watts) at Half Load Typical Backup Time 27.0 minutes (12000 Watts) at Full Load - Runtime Chart Smart-UPS VT Extended Run Options APC-Smart-UPS VT 15kVA 208V.w/4 Batt._Modules,_Start-_Up 5X8 Intemal Maintenance Bypass Communications & Management Interface Port(s) DB-9 RS-232,Smart-Slot Pre-Installed SmartSlotTm A_ _P9. 6. 1.9 Cards Control panel Multi-function LCD status and control console Audible Alarm Audible and visible alarms : configurable delays Emergency Power Off Yes (EPO) Physical Maximum Height 59.00 inches (1499 mm) Maximum Width 20.60 inches (523 mm) Maximum depth 36.40 inches (925 mm) httP://www.apcc-com/productstprint—techspecs-cfin?-tab==inodeMpaqnum=SUVT15KF4... 5/16/2007 Print'l-echnlcal Jpecuicatlons:of i Flu•rtr►� Net Weight 1318.00 lbs. (599.09 kg) Shipping Weight 1386.00 lbs. (630.00 kg) Shipping Height 64.70 inches (1643 mm) Shipping Width 25.60 inches (650 mm) Shipping Depth 41.80 inches(1062 mm) Color Black Units per Pallet 1.00 Environmental Operating Environment 32- 104 °F (0-40°C) Operating Relative 0-95% Humidity Operating Elevation 0-3333 feet(0-999.9 meters) Storage Temperature -58- 104 °F (-50-40"C) Storage Relative Humidity 0-95% Storage Elevation 0-50000 feet(0-15000 meters) Audible noise at 1 meter 54 dBA from surface of unit ' Online Thermal 3276.00 BTU/hr Dissipation Protection Class NEMA 1 Conformance Regulatory Approvals cUL Listed,ISO 14001,ISO 9001,UL 1778 Standard Warranty 1 year repair or replace,Start Up Service Protection Class NEMA 1 All rights reserved.All APC trademarks are property of American Power Conversion. Other trademarks are property of their respective owners. Specifications are subject to change without notice. h"://www-aocc.com/nroducts/i)rint techspecs.cfm?tab—models&partnum=SUVT15KF4... 5/16/2007 " r UPS SYSTEM TOTAL UNIT UNIT TOTAL UNIT QUANTITY UNIT COST COST LABOR LABOR 15KVA UPS 2 15,200.00 30,400.00 0.00 0.00 RAW TOTALS 30,400.00 0.00 P.O.Banc 122 GeorgeWwn,TX 78627 MOODS�rOODS Ph:512-930-2607 Construction Change Request To: Gary Beeman Number: 17 Brinldey Sargeant Date: 6/25107 5000 Quorum Suite 600 Job: 2007-010-001 Round Rods Police Department Dallas,TX 75240 Phone: (512)238-0930 Ph:972-960-9970 Desufptlon: Demo drywall and studs at Riser Rooms 399-X&207-X We are pleased to offer the following specifications and pricing to make the following charges: Demo drywap and studs at Riser Room 399-X and 207-X Replace doors.tames&hardware.Reframe walls,new gypsum board, tape,Aoat,texhme and paint. 06/26/07-Agreed to split drywall,tape,float,texture&paint number with Owner(33%Owner&67%FTWOODS). The total amount to provide this work is.................................................................................................. $5,756.67 (Please refer to attached sheet for details.) Please note that FTWOODS Construction Services Inc will require an extra 1 day. If you have any questions,please contact me at 512.930.2607. Submitted by: SC Inman App by- FTWOODS yFTWOODS Dom: Ca Page 1 of 2 1 P.O.BOXY 122 Geugetmn,TX 78627 MOODS Ph:512-930.2607 Construction Change Request 17 Price Breakdown Continuation Sheet Description: Demo drywall and studs at Riser Rooms 399-X&207-X Description Labor Material Equlpment Subcontract other Price Steel Doors&Frames $1,275.00 $1,275.00 Paints&Coatings $346.50 $346.50 Gypsum mrd System $1,887.60 $1,887.60 Demolition $1,225.00 $1,225.00 Subtotal: $4,734.10 Project Management $120.00 Field Management $60.00 Insurance $4,914.10 0.61% $29.98 Bond $4,944.08 0.81% $40.05 Orertread $4,984.13 10.00% $498.41 Profit $5,482.54 5.00% $274.13 Total: $5,756.67 Page 2 of 2 P.O.Box 122 Georgetown,TX 78627 MOODS Ph:512-930-2607 Construction Change Request To: Gary Beeman Number: 34 Brinkley Sargeant Date: 7/12/07 5000 Quorum Suite 600 Job: 2007-010-001 Round Rode Police Department Dallas,TX 75240 Phone: (512)23840930 Ph:972-960-9970 Description: Relocate Annunciator Panel We are pleased to offer the following specifications and pricing to make the following changes: Relocate annunciator panel from Room 339 to Room 408. The total amount to provide this work is............................................................................................ ------ $931.59 (Please refer to attached sheet for details.) The schedule is not affected by this change. If you have any questions,please contact me at 512.930.2607. Submitted by: SC Inman Approved by- FTWOODS Date: Cc: Page 1 of 2 P.O_Bar 122 Georgetown,TX 78627 R WOODS Ph:512-930-2607 Construction Change Request 34 Price Breakdown Continuation Sheet Description: Relocate Annunciator Panel Description tabor Material Equipment Subcontract Other Price Electrical $675.24 $675.24 Subtotal: $675.24 Project Management $60.00 Field Management $60.00 Insurance $79524 0.61% $4.85 Bond $800.09 0.81% $6.48 Overhead $806.57 10.00% $80.66 Profit $88723 5.00% $44.36 Total: $931.59 Page 2 of 2 • � 2'tt� I • cel 3r-f ACM SERVICES LLC. Letter of Transmi tat 3250 FM112 i TAYLOR TX 76574 i PH. 512-365.8393 FAX. 512-365-3989 € i Date:6/7/07 j TO: SC INMAN-FTWOODS ; From: NICK MORRIS-ACM s - - i f S i SC, i ATTACHED IS C.O. #6 FOR ROUND ROCK POLICE FACILITY, RELOCATING ANNUNCIATOR FROM RM 339 TO RM 408. SINCERELY, f i NICK MORRIS i { i f i f j! S f I i ! i i i i i i i 32 112 AL TAYLOR,.TT 7X 76574 OFFICE(512)365-8393 FAX(512)365-3989 TOLR LICEN&--#19678 �ER`�7I�El� i 1 CHANGE ORDER REQUEST CHANGE ORDER ROUND ROCK POLICE FACILITY C.O.#6 1tEWCATE ANNUNCIATOR i DATE: JUNE 7 2007 NAME: SC INMANN COMPANY= FT WOODS CONST. RFLOCATF,ANNUNC:LA1'OR FROM RM 339(SEUL. E)1-0 RM 408(SE(7I'. h) I"CONDUIT/CLAMPS/BOXHS/JETIdNF, MATERIAL(Si:Li ATTACHED SHEI:F) $18.5.88 TAX 50.00 MATERIAL TOTA1. S185.88 LABOR 14,22 INSTAL1,E t Ht)LIKS AT' $25.00 /HOUR S355.50 2,37 JOURWYMAN HOURS AT $35.40 /HOUR 82.95 0.25 f ItOJW J-MGR. HOURS AT $65.00 /HOUR I 5 SUBTOTAL LABOR $454.70 PAYROLL 7 AXES 35% $159.15 LABOR TOTAL $613.85 MISCFI.I.ANIsO(JS EXPENSIsS i IiQ(JIPMFNT $o,00 PERWI'S $0 FREIGHT $0,00 ! i MliFLI.ANF.OUS TOTAL S4,00 ! I MATERIAL. $0.00 i MISCELLANEOUS $0.00 IABOR $613.85 SUBTOTAL $613.85 OVERHEAD& PROFIT'00%) $6139 TOTAL x5,24 ! t t Regulated by the Texas Department of Licensing&Regulation. P.O.Box 12157,Austin,TX 78711, 1-8pp-803-3902,512-463-6599 Websfte: www.license.state.(x.us/complalnts j ROUND ROCK POLICE FACILITY C.O.06 P2 RELOCATE ANNUNCIATOR i 4 TOTAL UNIT UNIT TOTAL UNIT QUANTITY UNIT COST COST LABOR LABOR 1 EMT SS CONN DC 2 0.52 1.04 0.08 0.16 1 EMT CONDUIT 160 0.90 144.00 0.06 9.60 1 EMT SS COUP DC 16 0.70 11.20 0.09 1.44 J-BOX 6X6X4 N-1 1 4.00 4.00 0.35 0.35 BOX 4 11116 1 2.32 2.32 0.25 025 i CVR 4 11/16 BLANK 1 0.64 0.64 0.10 0.10 JETLINE PER FOOT 180 0.006 1.08 0.005 0.90 TEK SCREW 10X314 20 0.04 0.80 0.01 020 I 8-12M-2-4SM 1" 32 0.65 20.80 0.04 1.22 RAW TOTALS 185.88 14.22 r i i i i i s i t t r 1 r t i { f I i t f' i Rsx I f t f n k F b n l� i -rn�^ary JA AT g .G�fgg^ gt,. txrr•ti�+.�gfi��W�pgp}s���'95xk`, ,_ .y Rt mob*ti BAda St @b..du.�..•�$:. Lmd' 48tiA� '3.gg:tm1. 7,m"�YYtGktU rhR,Ms�;x?m },w r r�• � 3 i�• ` t Y. �F ............Yx ' . awl Ims r t 2 3 4 t w- 5, w � , d" L s i x� �2r fit' A � 0 t z l � a r, ry. t T:/ nigneering/Council Baps/Larry/Police Station DATE: August 16, 2007 SUBJECT: City Council Meeting - August 23, 2007 ITEM: * 15E1. Consider a resolution authorizing the Mayor to execute Construction Change Order No. 4 with FT Woods Construction for the Round Rock Police Facility. Department: Engineering and Development Services Staff Person: Tom Word, Chief of Public Works Operations Larry Madsen, Construction Manager Justification: Original construction plans did not provide for uninterruptible power supply (UPS) emergency backup system to provide power due to a power outage. Also included with this change order is installation of sheetrock in the riser rooms, relocating the annunciator panel for the sprinkler system in the dispatch room. Fundina• Cost: $47,931.23 Source of funds: 2002 GO Bonds & General Self Finance Construction Outside Resources: Brinkley Sargent Architects Background Information: One UPS will provide uninterrupted backup power for rapid equipment used for voice communication with Police and Fire units. The other UPS is used to power computer systems for computer-aided dispatch and other systems critical for the dispatch of police and fire units. The cost for the two UPS totals $41,242.97. Walls and sheetrock were to remain in Room 207X & 399X per original plans, which were originally riser rooms for water connections to the building. During remodeling, it was discovered that the sheetrock was deteriorated and metal studs rusted out due to moisture. These repairs will be made at a cost of $5,756.67. The last item is relocating an annunciator panel for sprinkler system from room #339 to the dispatch room #408 as the dispatch room is manned 24 hours per day 7 days a week. The cost for relocation totals $931.59. Public Comment: N/A EXECUTED DOCUMENT FOLLOWS ROUND ROCK POLICE FACILITY CONSTRUCTION CHANGE ORDER Project: Round Rock Police Facility Change Order No.: 4 Address: 3001 Tellabs Drive Initiation Date: 8/2/2007 Round Rock,Texas Contract For: General Construction To: FT Woods Construction Contract Date: 2/22/2007 1966 South Austin Avenue Georgetown,Texas 78626 (Contractor) The Contract is changed as follows: (#15)Addition of two UPS(Power Sources) Add $ 41,242.97 (#17)Demo drywall&studs @ riser room 399X and 207X Add $ 5,756.67 (#34)Relocate fire system annunciator from room 339 to room 408 Add $ 931.59 Total $ 47,931.23 This Change Order is not in effect and will not be included in the Contract Documents until signed by the Owner,Architect and Contractor. Changes included herein are subject to all conditions affecting them under the substitution specification section Summary The original Contract Sum was:..... ................................................. $ 10,884,000.00 Net change by previous authorized Change Orders:............................................................... $ 50,926.79 The Contract Sum prior to this Change Order was:............................................................ $ 10,934,926.79 The Contract Sum will be increased by this Change Order $ 47,931.23 The new Contract Sum including this Change Order will be:................................................ $ 10,982,858.02 The Contract time will be changed by( 1 )days: The Date of Substantial Completion as of the date of this Change Order therefore is: 12/8/07 Brinkley Sargent FT Woods Construction City of Round Rock e uontractor 5000.Qu0ktirxi< ftna,, uhte 600 1966 South Austin Avenue 221 East Main Street Address Address bailas�Texas;-752 �, Georgetown,Texas 78626 Round RoQk,Teos GarypghyS.C. Inman, IV Mayor,Nyle Maxwell Date Date Date P-0#7 SE.I P.O.Box 122 Georgetown,TX 78627 MOODS Ph:512-930-2607 Construction Change Request To: Gary Beeman Number: 15 Brinkley Sargeant Data: 5/16/07 5000 Quorum Suite 600 Job: 2007-010-001 Round Rods Police Department Dallas,TX 75240 Phone: (512)238-0930 Ph:972-960-9970 Description: Add UPS systems We are pleased to offer the following specifications and pricing to make the following changes: Addition of two(2)15 kVA American Power Conversion(APC)UPS systems. Units are capable of 27 minute AA4oad rapacity runtime. Lead time is 2 weeks from order time. Revised 05/23/07 for OH&P markup revisions. Revised 06/04/07 to increase size of one UPS unit from 15 kVA to 20 kVA. Thetotal amount to provide this work is.................................................................................................. $41.242.97 (Please refer to attached sheet for details.) The schedule is not affected by this charge. If you have any Questions,please me at 512.930.2607. Submitted by: SC Inman Approved by: FTWOODS Date: Cc: Pagg 1 of 2 P.O.BOX 122 Georgetown,TX 78627 MOODS Ph:512-930.2607 Construction Change Request 15 Price Breakdown Continuation Sheet Description: Add UPS systems Description Labor Material Equipment Subcontract Other Price Electrical $34,966.53 $34.966.53 Subtotal: $34,966.53 Project Management $60.00 Field Managemerd $180.00 Insurance 535,206.53 0.61% $214.76 Bond $35,421.29 0.81% $286.91 Ovefiead $35,708.20 10.00% $3,570.82 Profit $39,279.02 5.00% $1,963.95 Total: $41,242.97 Page 2 of 2 t L 10 1405 CECaM ST. 2.) TArudt,TX 78574 i OFRcE(512) 3 Pix(512)352-6275 INK 30 R`QZC)3WTDIR t ia6t�411194 TtkE030L5N194 I f i i CHANGE ORDER REQUEST i CHANCE•:ORDER-RRPD-CO#3 UPS UN17:S f DATE: MAY 15 2007 NAME: SC INMAN COMPANY: Yr WOODS CONS'. PROVIDE 1-I5KVA AND 1-20KVA UPS SYSTEM PER PROVIDE?D REQUIRFMFNTS i MATERIAL(SEiE,KITACHED SHEET I) $31,700.00 i TAX MATE RIAL'I'v'I'AL $31.700.00 LABOR 0.00 INS-I'ALL.ER HOURS AT 525.00 /HOUR $0.00 0.00 JOURNEYMAN HOURS AT $35.00. /HOUR $0.00 1.00 PROJECT'MOR.HOURS AT 565.00 /HOUR 565.00 St1M710TAL I AROR $65.00 PAYROLL TAXES L 35% $ LABOR TOTA L $87.75 - I M1SCELL.ANHOUS EXPENSES EQUIPMENT RI-WrAI. $0.00 ); PERMITS $0.00 I'RE:I(1l CC V.00 MISCIiI.I.ANEOUS Taw. $0.00 i MNI'ER1AL $31.700.00 MISCELLANEOUS 50.00 LABOR X7.75 SUBTOTAL $31.787.75 OVERHEAD& I PRO I'TI-(I(YY*) $3,178.78 TOTAL S34-%6A53 Rued by Ute Texas Dep ubmt of Lio!>tts V&ReguMm P.O.Om 12167.AMM,TX 78711.1 802,512-4634M Vvab tNwrklicense sfia6e bc. I J M05 COEUR S7. CZA OI's TAYt,OR,1X 76574 Of (512)366.6993 FAX Fiuc(512)352•x275 ACO-NCV46M LODALWT MLR UmtmE#198Y6 1930 'VX40:0 0 NICK MOM% I 1 E I CHANGE ORDER REQUEST r CHANGE ORDER-RRPD-CO#3 UPS UNITS � } DATE: MAY 15 2007 NAME: SC INMAN COMPANY: FT WOODS CONST. PROVIDE I-I5KVA AND 1 20KVA UPS SYSTEM PER t PROVIDEM REQUIREMENTS i MATERIAL(SEE:A-11-ACHED SHEET') $31,700.00 TAX � MATERIAL TOTAL $31.700.00 F LABOR 0.00 INSTALLER HOURS AT 525.00 /HOUR $0.00 s 0.00 JOURNEYMAN HOURS A'1' $35.00- /HOUR X00 1.00 PRO1H.t;U MOR.HOURS AT 563.00 /HOUR 500) SURIT)TAL LAROR S6S.00 t PAYROI.I.TAXES @ 35% 522.75 j LABOR TOTAL $87.75 MISCELLANWUS EXPENSES EQUIPMENT RENTAL $0,0 PI?RMiTS $0.00 ! FRE.Ka IT _oo i MISCELLANEOUS Tam. $0.00 j ff MA'I`ERIAL $31,700.00 1 MISCELLANEOUS solo LABOR X7.75 SUBTOTAL $31.787.75 k OVERHEAD& PKOf'T1'(I(m) $3.178.78 TOTAL ,$34,966.53 Regtdded by ltle Tars Depa*nw t of Licensing&ReguMm P.O.Banc 12157,Austln,TX 78711.14800-803-3wZ 6'12 WN i Vldebsft vYYYMcRcxtlse. a ocustoomalain� I t AW?C Legendary ReliabAty` APC Smart-UPS VT 15kVA 208V w/4 Batt Modules, Start-Up 5X8, Internal Maintenance Bypass Part Number: SUVT15KF4B4S Output Output Power Capacity 12 kW/ 15 kVA Max Configurable Power 12 kW/ 15 kVA Nominal Output Voltage 120V,208V,208V 3PH Output Voltage Note Configurable for 208 and 220V-3 Phase Efficiency at Full Load 93% Output Voltage Distortion Less than 5%at full load Output Frequency(sync to 57-63 Hz for 60 Hz nominal mains) Crest Factor Unlimited Waveform Type Sine wave Output Connections (1) Hard Wire 5-wire (3PH + N + G) (1)Screw Terminals Input Bypass Built-in Maintenance Bypass,Built4n Static Bypass Nominal Input Voltage 208V 3PH Input Frequency 40-70 Hz http://www.apcc.com/products/print techspecs.cfm?tab=models&part num=SLNt15KF4... 5/16/2007 a,uta• a w.u•.vw. vj.—.................. .—.. ___' ._ _ . Input Connections Hard Wire 5-wire(3PH + N + G) Input voltage range for 160-240V main operations Other Input Voltages 220 Maximum Input Current 40A Input Breaker Capacity 60A Batteries & Runtime Battery Type VRLA Included Battery Modules 4 Typical recharge time 5 hour(s) RBCTm Quantity 4 Typical Backup Time 65.5 minutes (6000 Watts) at Half Load Typical Backup Time 27.0 minutes (12000 Watts) at Full Load - Runtime Chart Smart-UPS VT Extended Run Options APC Smart-UPS VT 15kVA 208V w/4 Batt._Modules,-Start-UD 5X8.Internal Maintenance Bypass Communications & Management Interface Port(s) DB-9 RS-232,Smart-Slot Pre-Installed SmartSlot rm AP9619 Cards Control panel Multi-function LCD status and control console Audible Alarm Audible and visible alarms : configurable delays Emergency Power Off Yes (EPO) Physical Maximum Height 59.00 inches (1499 mm) Maximum Width 20.60 inches (523 mm) Maximum depth 36.40 inches (925 mm) httpJ/www.apcc.com/products/print_techspecs.cfm?tab=models&parLnum=SUVT 15KF4... 5/16/2007 print Technical Jpmincailons: Jl ? 1Jr x,*L"0 Net Weight 1318.00 lbs. (599.09 kg) Shipping Weight 1386.00 lbs. (630.00 kg) Shipping Height 64.70 inches (1643 mm) Shipping Width 25.60 inches (650 mm) Shipping Depth 41.80 inches (1062 mm) Color Black Units per Pallet 1.00 Environmental Operating Environment 32- 104 °F (0-40°C) Operating Relative 0-950/0 Humidity Operating Elevation 0-3333 feet(0-999.9 meters) Storage Temperature -58-104°F(-50-40-C) Storage Relative Humidity 0-950/6 Storage Elevation 0-50000 feet(0-15000 meters) Audible noise at 1 meter 54 dBA from surface of unit Online Thermal 3276.00 BTU/hr Dissipation Protection Class NEMA 1 Conformance Regulatory Approvals cUL Listed,ISO14001,15O 9001,UL 1778 Standard Warranty 1 year repair or replace,Start Up Service Protection Class NEMA 1 All rights reserved.All APC trademarks are property of American Power Conversion. Other trademarks are property of their respective owners. Specifications are subject to change without notice. h":/Avww.ancc.com/nroducts/print techspecs.cfm?tab-nodels&part_num=SUVT15KF4... 5/16/2007 r r UPS SYSTBA TOTAL UNIT UNIT TOTAL UNIT QUANTITY UNIT COST COST LABOR LABOR 15KVA UPS 2 15,200.00 30,400.00 0.00 0.00 RAW TOTALS 30,400.00 0.00 t T P.O.Box 122 MOODS TX 78627 ��/OD I-I DS Ph:512-930-2607 Construction Change Request To: Gary Beeman Number: 17 Brinidey Sargeant Date: 6/25/07 5000 Quorum Suite 600 Job: 2007-010-001 Round Rods Police Department Dallas,TX 75240 Phone: (512)238-0930 Ph:972-960-9970 Description: Demo drywall and studs at Riser Rooms 399-X&207-X We are pleased to offer the following specifications and prkting to make the following charges: Demo drywall and studs at Riser Room 399-X and 207-X. Replace doors,flames&hardware.Reframe walls,new gypsum board, tape.float,texture and paint. 06/26/07-Agreed to split drywall,tape,float,texture&paint number with Owner(33%Owner&67%FTWOODS). The total amount to provide this work is................................................................... $5,756.67 (Please refer to attached sheet for details.) Please note that FTWOODS Construction Services Inc will require an extra 1 day. If you have arry questions,please contact me at 512.930.2607. Submitted by: SC Inman Approved by FTWOODS pate: cc: Page 1 of 2 • 1 P.O.Box 122 Georgetown,TX 78627 RWOODS Ph:512-930-2607 Construction Change Request 17 Price Bfeakdown Continuation Sheet Description: Demo drywall and studs at Riser Rooms 399-X&207-X Description Labor Material Equipment Subcontract Other Price Steel Doors&Frames $1,275.00 $1,275.00 Paints&Coatings $346.50 $346.50 Gypsum board System $1,887.60 $1,887.60 Demolition $1,225.00 $1,225.00 Subtotal: $4,734.10 Project Management $120.00 Field Management $60.00 Insurance $4,914.10 0.61% $29.98 Bond $4,944.08 0.81% $40.05 Overhead $4,984.13 10.00% $498.41 Profit $5,482.54 5.00% $274.13 Total: $~5,756.67 Page 2 of 2 P.O.Boz 122 Georgetown,TX 78627 MOODS r- OODS Ph:512-930-2607 Construction Change Request To: Gary Beeman Number: 34 Brinkley Sargeant Date: 7112107 5000 Quorum Suite 600 Job: 2007-010-001 Round Rods Police Department Dallas,TX 75240 Phone: (512)238-0930 Ph:972-960-9970 Description: Relocate Annunciator Panel We are pleased to offer the following specifications and pricing to make the following changes: Relocate annunciator panel from Roan 339 to Room 408. The total amount to provide this work is.................................................................................................. $931.59 (Please refer to attached sheet for details.) The sdiedule is not affected by this charge. If you have arty questions,please contact me at 512.930.2607. Submitted by: SC Inman Approved by. Ff WOODS pate: Cc: Page 1 of 2 P.O_Boot 122 Georgetown.TX 78627 FtVMDS Ph:512-930-2607 Construction Change Request 34 Price Breakdown Continuation Sheet Description: Relocate Annunciator Panel Description Labor Material Equipment Subcontract Other Price Electrical $675.24 $675.24 Subtotal: $675.24 Project Management $60.00 Field Management $60.00 Insurance $79524 0.61% $4.85 Bond $800.09 0.81% $6.48 Overhead $806.57 10.00% $80.66 Profit $887.23 5.00% $44.36 Total: $931.59 Page 2 of 2 2,'i 10 ACM SERVICES LLC. Letter of Transmi tafft, 3� 3280 FM112 } TAYLOR TX 76574 PH. 512-365.8393 FAX. 512-365-3989 i 4 Date:6/7/07 I I i t To: SC INMAN- FTWOODS ; i From: NICK MORRIS-ACM 1 i t ( t i f SC, r { ATTACHED IS C.O. #6 FOR ROUND ROCK POLICE FACILITY, RELOCATING ANNUNCIATOR FROM RM 339 TO RM 408. i SINCERELY, NICK MORRIS - f . f i 1 4 f t f� i t ! i i i i i ( I i 3280 FM 112 TAYLOR.TX 76574 OFFICE(512)365-8393 FAX(512)365-3989 TOLR UCErSt 1'19676 03M 4VXC:300 i CHANGE ORDER REQUEST I CHANGE ORDER ROUND ROCK POLICE FACILITY C.O.#6 ItM:WCATE ANNUNCIATOR i DATE: JUNE 7 2007 NAME.: SC INMANN COMPANY: FT WOODS CONST. RELOCATE ANNUNCIA COR FROM RM 339(SECT. E)I'D RM 408(S1r E F) I"CONDUIT 1 CLAMPS/BOXES/JIiTI,INF MATERIAL.($I:(a A'I`fACHLI)SHEh l) $185.88 TAX 100 MATERIAL TOTAL $1815.88 LABOR 14.22 INSTALLI-R HOURS A'f $25.00 /HOUR 5355.50 2.37 JOURNFiYMAN HOURS AT 535,00 /HOUR 82.95 0.25 PRo JFk'1'MGK. HOURS AT 565.00 /HOUR 316.25 ? SUB7'O1AL LABOR $454.70 PAYROLL TAXES Oa 35% $159.15 LABOR TO l-AL $613.85 i MISC;I:I,I.ANIiO(IS IiXP1iNSIsS loilPMFwr $0.04 P1?RMrN' $0 FREIGHT P-00 I MI.SCELLANF.OUS TOTAL. $400 I MATERIAL. $0.00 I MI.SCFLLANF.OUS $4.00 f IABOR $613.95 SUBTOTAL $613.85 OVERI LEAD& PROFLT(I0'/o) $6139 z TOTAL S675.2A } i Regulated by the Texas Department of Licensing&Regulation. P.O. Box 12157,Austin,TX 78711, 1-800-803-3902,512-463-6599 I Website: www.license.s%te.tx.us/complaints ; t ROUND ROCK POLICE FACILITY C.O.#6 P2 RELOCATE ANNUNCIATOR i i TOTAL UNIT UNIT TOTAL UNIT QUANTITY UNIT COST COST LABOR LABOR 1 EMT SS CONN DC 2 0.62 1.04 0.08 0.15 1 EMT CONDUIT 160 0.90 144.00 0.06 9.60 1 EMT SS COUP DC 16 0.70 11.20 0.09 1.44 j J-SOX 6X6X4 N-1 1 4.00 4.00 0.35 0.35 BOX 4 11116 1 2.32 2.32 0.25 025 CVR 411/16 BLANK 1 0.64 0.64 0.10 0.10 1 JETLINE PER FOOT 180 0.008 1.08 0.005 0.90 TEK SCREW 10X314 20 0.04 0.80 0.01 0.20 j 6-12M-2-4SM 1' 32 0.65 20.80 0.04 1.22. RAW TOTALS 185.88 14.22 t 1 i f t i S t i E s r R i i I i r I� f- i