Loading...
R-01-01-11-13C1 - 1/11/2001 RESOLUTION NO. R-01-01-11-13C1 WHEREAS, the City of Round Rock desires to retain professional engineering services in connection with the condemnation of the Wilson tract for the Greenlawn Boulevard Extension Project, and WHEREAS, Baker-Aicklen & Associates, Inc . has submitted an Agreement for the Provision of Limited Professional Services to provide said services, and WHEREAS, the City Council desires to enter into said agreement with Baker-Aicklen & Associates, Inc. , Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City an Agreement for the Provision of Limited Professional Services with Baker-Aicklen & Associates, Inc . , for professional engineering services in connection with the condemnation of the Wilson tract for the Greenlawn Boulevard Extension Project, a copy of said agreement being attached hereto and incorporated herein for all purposes . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered K:\WPDOCS\RESOLUTI\R10111C1.WPD/sc and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act . RESOLVED this lith day of Jarmo ry, 001 . LI R A. STLUKA, JR Mayor City of Round Rock, Texas ATTEST: (�" A/r� J E LAND, City Secretary 2 Baker-Aicklen & Associates, Inc. Engineers/Surveyors AN AGREEMENT FOR THE PROVISION OF LIMITED PROFESSIONAL SERVICES Design BAKER-AICKLEN & ASSOC., INC. Client: CITY OF ROUND ROCK Professional 203 E. Main St., Suite 201 221 East Main Street Firm: Round Rock, Texas 78664 Round Rock, TX 78664 Date: December 13 , 2000 Attn: Steve Sheets, City Attorney Contract No.: 00-5190 Project Name/Location: Condemnation Greenlawn Blvd., City of Round Rock, Tx v. Milford Anderson, Jr. Wilber A. Wilson and David W. Leppin. Scope/Intent and Extent of Services: Review Jack Holfords testimonyprovide analysis of the feasibility of his proposed uses and platting based on conditions prior to construction of Greenlawn Blvd. Fee Arrangement: Hourly basis plus reimbursable expenses as outlined on the enclosed Standard Rate Schedule dated September, 2000. Special Conditions: Expert witness and depositions invoiced at 2 times normal rate agreement. Prepared by: The Professional Services Agreement on the reverse side of this form as well as James Stendebach, AICP, Manager Land Dev. the attached rate schedule are a part of (Printed Name/Title) this Agreement. Offered a ed b : IV � Z-i -e� i �ignature) ( j Date (Si ure) Date A. William Waeltz, P.E., Branch Manager �ot3E/2% A, 6 I LUKA , j;/� (Printed Name/Title) (Prin/Ited Name/Title) Baker-Aicklen& Associates, Inc. (2�/ / I V of eOUAJ D /Po C//� U (Name of Design Professional Firm) (Name of Client) ' e STANDARD RATE SCHEDULE (Labor Rate Table 35) Effective September, 2000, the following rates are recommended for work performed on an hourly-charge basis. Rates include company overhead and profit for services accomplished during regular working hours. DIRECT LABOR OFFICE PERSONNEL SERVICES Classification Rates Project Engineer/Surveyor/Planner........................................................................................ $110.00 per hour Staff Engineer/Surveyor/Planner............................... ............$95.00 per hour ............................. . Project Designer/Coordinator ................................................................................................... $85.00 per hour Engineering Assistant/Surveying Assistant/GPS Processor ..................................................... $70.00 per hour Senior Engineering/Surveying CAD Technician ..................................................................... $60.00 per hour Engineering/Surveying CAD Technician/Field Representative ............................................... $55.00 per hour CADDraftsman ........................................................................................................................ $45.00 per hour Secretary ................................................................................................................................... $45.00 per hour Expert Witness/Testimony/Deposition Services ................................................................... Two Times Rates Principal (as appropriate) ....................................................................................................... $120.00 per hour FIELD PARTY SERVICES Rates 1-Man Field Party ..................................................................................................................... $70.00 per hour 2-Man Field Party ..................................................................................................................... $95.00 per hour 3-Man Field Party ................................................................................................................... $120.00 per hour 4-Man Field Party ................................................................................................................... $145.00 per hour GPS Field Unit with Operator(Note 5)................................................................................... $100.00 per hour GPS Field Unit without Operator(Note 5)................................................................................ $60.00 per hour DIRECT EXPENSES Transportation: By Firm's Passenger Vehicles(Note 1) ................................................................................ $ 0.35 per mile By Firm's Survey Trucks (Notes 1, 2, 3 &4) ....................................................................... $ 0.35 per mile Subsistence of out-of-city work ............................................................................................... $100.00 per day Reproduction&Printing by Firm, ........................................................................................... Prevailing Com- Survey Stakes, Lathes, Iron Rods ....................................................................................... mercial Rates Or andother Direct Expense...................................................................................................... Cost,Plus 10% Notes: 1. A mileage charge will be billed for projects exceeding a 50-mile radius of the base office only. 2. Field Party rates include conventional equipment, supplies and survey vehicles. Abnormal use of stakes, lathes,etc.,used such as during the construction phase of a project will be charged as indicated. 3. A minimum of two (2) hours field party time charge will be made for show-up time and return to office, resulting from inclement weather conditions,etc. 4. Field Party stand-by time will be charged for at the above-shown appropriate rates. 5. Rates apply to actual time GPS units are in use. All other time will be charged as appropriate normal field party rates. 6. The firm's professional liability is limited to the total amount of compensation associated with a specific project up to a maximum of$50,000. I , Baker-Alcklen & Associates, Inc. Engineers/Surveyors DATE: January 3, 2001 SUBJECT: City Council Meeting—January 11, 2001 ITEM: 13.C.1. Consider a resolution authorizing the Mayor to execute an Agreement for the Provision of Limited Professional Services with Baker Aicklen &Associates, Inc. in connection with the condemnation of the Wilson tract for the Greenlawn Boulevard Extension Project. Resource: Steve Sheets History: Condemnation of"Wilson"tract for the Greenlawn Extension Project. Funding: Cost: Estimates $2,000 - $5,000 Source of funds: Transportation System Development Corporation Outside Resources: Baker-Aicklen&Associates, Inc. Impact: Expert testimony needed for trial of condemnation proceedings. Benefit: Extension of Greenlawn Boulevard Public Comment: N/A Sponsor: N/A