R-01-01-25-10C4 - 1/25/2001 RESOLUTION NO. R-01-01-25-10C4 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract" ) with Payton Construction, Inc. for the Raw Water Pump Station Expansion Project, and WHEREAS, the Council has determined that it is necessary to make changes to the plans or specifications of the Contract due to unforeseen circumstances, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 2 , and WHEREAS, the Council has determined that this Change Order No. 2 will not result in an increase of the original contract price by more than 25 percent, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 2 to the Contract with Payton Construction, Inc . for the Raw Water Pump Station Expansion Project . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted K:\WPDOCS\RESOLUTI\R10125C4.WPD/sc upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act . RESOLVED this 25th day of January, 2001 . 4RRT A. STLUKA, Mayor City of Round Rock, Texas A ST: ya AA AA j7 J E LAND, City Secretary 2 CITY OF ROUND ROCK Date: Sheet 1 of 1 CONTRACT CHANGE ORDER NO.2 Contract: Raw Water Pump Station Expansion Owner: City of Round Rock,221 East Main Street,Round Rock Texas 78664 To: Payton Construction,Inc.,P.O.Box 1734,Wimberly,Texas 78676 (Contractor) ou are hereby requested to comply with the following changes from the Contract Plans and Specifications: ADDED TIME DAYS Description of Changes Decrease Increase Supplemental Plans and Specifications Attached) 1.0 Change Out Bolts on 30"Flange $610.00 0 2.0 Concrete Encase Conduit Below Bldg. $338.00 0 3.0 Concrete Encase Flex Couplings @ Meter Vault $371.00 0 .0 Existing Elect.Bldg.Termination Cabinet $1,723.00 0 5.0 New Fence Installation/Old Fence Removal $8,300.00 0 6.0 Relocate HVAC Unit $1,875.00 0 7.0 Valve Supports,Valve Cover Apron,Gable Vents $2,620.00 0 8.0 Paint Existing Vaults $6,800.00 0 9.0 Brush Clearing $340.00 0 10.0 Bury Armored Cable $3,900.001 0 JUSTIFICATION: Modifications to improve pump station operations and reliability. ORIGINAL CONTRACT AMT: Dollars:[$ 2,356,000.00 CONTRACT AMMENDMENT(C.A)AMT: Dollars:[$ 105,500.00 HIS CHANGE ORDER(C.O.)AMT: Dollars:[$ 26,877.00 PREVIOUS CHANGE ORDER AMT: Dollars:l$ 12,360.001 CHANGE ORDERS TO DATE AMT: Dollars:[$ 39,237.00 ORIGINAL CONTRACT PLUS C..O.s AND C.A.: 2,500,737.00 TOTAL PERCENT CHANGE: PERCENT%: 6.14 his document will become a supplement to the contract and all provisions will apply hereto: CDM ,' 1 Eng' er Date: W [on C structi In Contrac r Date: and Rock Owner Date: Change Order No.2.xls LA KE GERGPL, W 'Raw to UMP Stati 29 Raw Water Pump Stations I've 0 1 Jan 04 01 05: 07p CDM (5123346—_8669 p. 1 CDMCamp Dresser&McKee Inc. consuming Oakpointe Office Building engineering 9111 Jollyville Road,Suite 105 construction Austin,Texas 78759 ° r�`0ns Tel:512 346-1100 Fax 512 345-1483 January 4,2001 Mr. David Stephens Project Manager Payton Construction P.O. Box 1734 Wimberley,Texas 78676 Re: City of Round Rock Raw Water Pump Station Expansion Change Order No.2 Dear Mr.Stephens: This letter transmits three copies of Change Order No. 2 for the Raw Water Pump Station Expansion Project. The HVAC relocation cost shall include at a minimum the HVAC unit relocation,concrete pad,grading work and reworking the ductwork including weatherproofing and duct supports. The buried armored cable cost shall include at a mir- mum the moving of the armored cable to the City cut ditch,placing the armored cable in the ditch,covering the armored cable in the ditch,provide moisture proof caps for the ends of the armored cable and support the ends of the armored cable off of the ground in a terminal box. Please review,sign and return the three-signed copies of Change Order No. 2 to Mr.Don Rundell at the City by Monday,January 8,2001. In addition,as indicated in the letter from me to you dated October 6,2000,a credit is due to the Owner for allowing the deposition of spoils. If you have any questions or comments,please let me know. Sincerely, Camp Dresser&McKee Inc. Greg T.Swoboda,P.E. Principal xc: Don Rundell,CORR FACorrespondenoe\City of Round Rock\Raw Water Purnp station Exp\td-01.doc 01/04/2001 THU 17:57 [TX/RX NO 52381 0 001 DATE: January 19, 2001 SUBJECT: City Council Meeting—January 25, 2001 ITEM: 10.C.4. Consider a resolution authorizing the Mayor to execute Change Order No. 2 to the contract for the Raw Water Pump Station Expansion Project with Payton Construction, Inc.for changes to the plans or specifications of the Contract due to unforeseen circumstances. This will require and additional cost of$26,877.00 bringing the contract total to $2,500,737.00 for a total increase to the original contract amount of 6.14%. This project to upgrade the Raw Water Pump Station was necessary to deliver raw water to the Water Treatment Plant in an amount equal to the new plant capacity created with the Phase IV Water Treatment Plant expansion. In addition to adding the three 6-mgd pumps with controls and equipment building this project added a generator and other appurtenances to ensure the reliable delivery of potable water to the citizens of Round Rock. Resource: Jim Nuse, Public Works Director Don Rundell, Senior Engineer History: This project to upgrade the Raw Water Pump Station was necessary to deliver raw water to the Water Treatment Plant in an amount equal to the new plant capacity created with the Phase IV Water Treatment Plant expansion. In addition to adding the three 6-mgd pumps with controls and equipment building this project added a generator and other appurtenances to ensure the reliable delivery of potable water to the citizens of Round Rock. Funding: Cost: $26,877.00 Source of funds: Transfers from Fund 24-LCRA Outside Resources: Payton Construction, Inc. Impact: Is to maintain the integrity and reliability of our Raw Water Pump Station to deliver raw water to our Water Treatment Plant. Benefit: Is to minimize the potential of system failure, which could result in critical water shortages to our customers. Public Comment: N/A Sponsor: N/A