R-07-09-27-15B1 - 9/27/2007 RESOLUTION NO. R-07-09-27-15131 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract" ) with Cutler Repaving, Inc . for the 2006 Street Maintenance Program Phase 2/In-Place Pavement Recycling, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 1 to the Contract with Cutler Repaving, Inc . for the 2006 Street Maintenance Program Phase 2/In-Place Pavement Recycling, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 27th day of September, 2007 . 0:\wdox\RESOLUTI\R70927B1.WPD/rmc )//Zg N �yof WELL, ayor iRound Rock, Texas ANT: CHRISTINE R. MARTINEZ, City Sec etary 2 CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER PAGE 1 OF 1 DEPARTMENT: Transportation Services DATE: 9/6/2007 PROJECT: Street Maintenance Program-Phase 2! CHANGE ORDER NO: 1 In-Place Pavement Recyling-2006 JUSTIFICATION: ORIGINAL CONTRACT PRICE: $1,669,482.50 Quantity Adjustments PREVIOUS CHANGE ORDERS: $0.00 THIS CHANGE ORDER: $238,756.94 CHANGE ORDER TO DATE: $0.00 CHANGE DATA ADDED DAYS DESCRIPTION OF UNIT CALENDAR/ ITEM CHANGES UNIT QTY. PRICE AMOUNT WORKING 1 Heating,Scaril}ung and Repa _5,445 00} L95 (. 4U,6I r.%_5) 0 2 Pavement Repair i on 2,755,87 135.80 S374,247.15 15 3 I"HV1AC Overlay "You (1,033.27) -36T25 (S 64,32I.06) 0 4 Recycling Agent Gal (7,003,00) 5 Edge Milling, SY (2,384.00) '3.90 (59,297.60) 0 6 Gtility.Llanhole Adjust FA (6.00) S62077 (_,3,720.00) 1 7 Ivtilit —Valve can riser Adjust EA 1.00 225.00 S22.5.00 0 8 R&R Concrete Sidewalk 5F 363.00 SZ,359,50 1 9 R&R Concrete Pedestrian ramp EA (8.00) 2,IOO.E)0 (7S16,80().00i I Ill R&R Concrete Curb and Gutter LF 147.00 T41.00 `6,027.00 0 11 Thermoplastic Pavement rruZrking (7,198.00} 50.50 (53,599.00) 0 12 Sairiltiug,Add 5°1,)Portland Cement (.'Y 74.001 57.00 ' 4,218.0:) 2 13 Portland Cement Barrel 327.00 ,44.50 514,551.50 0 14 Tragic Control L,S 0.00 .:.33.000.00 .;0).00 . 0 ii Retlectorized Pavement l,Iarkers EA 673.00 .:4.00 1 7'_,61)2.(10.) () TOTAL: $238,756.94 ! 2a PREPARED BY:TODD KELTGEN 9/612007 PERCENT OF ORIGINAL CONTRACT PRICE Public Works Operations Manager DATE THIS CHANGE ORDER: 14.30% Cutler Repaving Inc. PREVIOUS CHANGE ORDER 0 coat ctqr TOTAL%CHANGE: 14.30 BY: L.I C^�-�.i.a-y�¢--, ORiGiNAL CONTRACT PRICE PLUS TITLE: Q '` 1 y CHANGE ORDERS: $1,908,239.44 APPROVED: CITY OF ROUND ROCK constco2lorms6ilk EXHIBIT s ►►A►► US 79 n f N N G7 M V7 N m D � GATTIS SCHOO RD SN 45 Z LO Gattis School Road Pavement Repair, Curb & Gutter Repair, Sidewalk and Pedestrian Ramp Repair, Heating, Scaryifying, and Repaving j Gattis School Road 1 i i N 04f F U GATTIS SCHOOL RD OG O <2 �JO 6 �GO 00 <<O R S/-/45 I High Country Blvd Pavement Repair Heating, Scarifying, and Repaving High Country Blvd GATTIS SCHOOL RD 0 7 Y �z W U W j rQ Q Double Creek Drive SN 45 Pavement Repair, Heating, Scarifying, & Repaving Double Creek Drive DATE: September 20, 2007 SUBJECT: City Council Meeting - September 27, 2007 ITEM: 15B1. Consider a resolution authorizing the Mayor to execute Change Order No. 1 for the Street Maintenance Program Phase 2/In- Place Pavement Recycling - 2006 to Cutler Re-Paving Inc. Department: Transportation Services Staff Person: Thomas G. Martin, P. E., Director of Transportation Services Justification: Change order #1 encompasses the final quantity adjustment required to complete the project. Funding: Cost: $238,756.94 Source of funds: General Fund Outside Resources: Cutler Re-Paving Inc. Background Information: This contract encompasses the re-surfacing of Gattis School Rd., High Country Blvd. and Double Creek Blvd. south of Gattis School Rd. This project will include pavement repairs, concrete re-pairs and resurfacing. Public Comment: N/A EXECUTED DOCUMENT FOLLOWS CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER PAGE 1 OF 1 DEPARTMENT: Transportation Services DATE: 9/6/2007 PROJECT: Street Maintenance Program-Phase 21 CHANGE ORDER NO: 1 In-Place Pavement Recyling-2006 JUSTIFICATION: ORIGINAL CONTRACT PRICE: $1,669,482.50 Quantity Adjustments PREVIOUS CHANGE ORDERS: $0.00 THIS CHANGE ORDER: $238,756.94 CHANGE ORDER TO DATE: $0.00 CHANGE DATA ......................................................................... ADDED DAYS DESCRIPTION OF UNIT CALENDAR/ ITEM CHANGES UNIT QTY. PRICE AMOUNT WORKING 1Heatin g,Scarifying and Repave SY (25,445.00) 1.95 ( 49,617.75) 0 2 Pavement Repair Ton 2,755.87 135.80 374,247.15 15 3 1"HMAC Overlay Ton (1,033.27) 62.25 ($64,321.06)- 0 4 Recycling Agent Gal (7,003.00) 2.60 ( 18,207.80) 0 5 Edge Milling SY (2,384.00) 3.90 ($9,2977.6-0) 0 6 Utility Manhole Adjust EA (6.00) 620.00 ($3,720.00). 1 7 Utility Valve can riser Adjust EA 1.00 225.00 $225.00 0 8 R&R Concrete Sidewalk SF 363.00 $6.50 $2,359.50 1 9 R&R Concrete Pedestrian ramp EA (8.00) $2,100.00 ( 16,800.00) 1 10 R&R Concrete Curb and Gutter LF 147.00 $41.00 6,027.00 0 11 Thermoplastic Pavement marking LF (7,198.00) 0.50 ($3,599.067) 0 12 Scarifying,Add 5%Portland Cement CY 74.00 57.00 $4,218.00 2 13 Portland Cement Barrel 327.00 44.50 14,551.50 0 14 Traffic Control LS 0.00 T38,000.00 0.00 0 15 eflectorized Pavement Markers EA 673.00 $4.00 $2,692.00 0 0 TOTAL: $238,756.94 20 PREPARED BY: TODD KELTGEN 9/6/2007 PERCENT OF ORIGINAL CONTRACT PRICE Public Works Operations Manager DATE THIS CHANGE ORDER: 14.30% Cutler Repaving Inc. PREVIOUS CHANGE ORDER 0 C traacc-t/9r TOTAL%CHANGE: 14.30% 'rA BY: ' lc.C�� r (C ORIGINAL CONTRACT PRICE PLUS TITLE: CHANGE ORDERS: $1,908,239.44 APPROVED: I OF ROUND ROCK constco2/forms&lk /66/