R-01-06-28-12C2 - 6/28/2001
RESOLUTION NO. R-01-06-28-12C2 WHEREAS, the City of Round Rock has previously entered into a contract for engineering services ("Contract" ) with Carter & Burgess, Inc . for the preparation of plans, specifications, and estimates for 1 . 5 miles of US 79 from CR 195 to FM 1460, and WHEREAS, Carter & Burgess, Inc . has submitted Supplemental Agreement No. 1 to the Contract for a change in the scope of services and to extend the contract date, and WHEREAS, the City Council desires to enter into said Supplemental Agreement No. 1 to the Contract with Carter & Burgess, Inc . , Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 1 to the Contract with Carter & Burgess, Inc . for a change in the scope of services and to extend the contract date, a copy of said supplemental agreement being attached hereto and incorporated herein for all purposes . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas 0:\WPDOCS\RESOLUTI\R10628C2.WPD/SC Government Code, as amended, and the Act . RESOLVED this 28th day of June, 2001 . r A. STLUKA, JR. , ayor City of Round Rock, Texas ATTEST: A A A4,djZA4tz& J E LAND, City Secretary 2 STATE OF TEXAS § Contract No. COUNTY OF WILLIAMSON § SUPPLEMENTAL AGREEMENT NO. 1 CONTRACT FOR ENGINEERING SERVICES THIS SUPPLEMENTAL AGREEMENT to contract for engineering services is made by and between the City of Round Rock, hereinafter called the "City", and Carter-Burgess, Inc., hereinafter called the "Engineer", and becomes effective when fully executed by both parties. WITNESSETH WHEREAS, the City and the Engineer executed a contract on the 23`d day of March 2000 concerning the design of a four-lane divided section on US 79 from FM 1460 to CR 195 to include bridge design at Arterial A; and, WHEREAS, Article 3, Contract Period, requires work to be completed on or before close of business on August 31, 2001; and, WHEREAS, Article 4. Compensation, limits the maximum amount payable for the contract to $398,182; and, WHEREAS,it has become necessary to amend the contract; AGREEMENT NOW THEREFORE, premises considered, the City and the Engineer agree that said contract is amended as follows: I. The Engineer will be performing additional work concerning the extension of project limits 1400 feet west of FM1460, as shown in Exhibit B. II. The Contract termination date is extended to December 31, 2002. III. The maximum amount payable of the contract is increased by$158,118.00, as shown in Exhibit D, to $556,300.00. 1 of 2 ALL OTHER PROVISIONS ARE UNCHANGED AND REMAIN IN FULL FORCE AND EFFECT. IN WITNESS WHEREOF, the City and the Engineer have executed this supplemental agreement in duplicate. THE CITY THE ENGINEER By: By: (�(•L%� Signature A. Henry earson, P. E. Vice resident -C� Y-ol 45-7-01 Date Date LIST OF EXHIBITS: Exhibit B—Additional Services to be Provided by the Engineer Exhibit C—Work Schedule Exhibit D—Fee Schedule 2 of 2 CONTRACT NO. EXHIBIT "B" ADDITIONAL SERVICES TO BE PROVIDED BY THE ENGINEER PROJECT: US 791H 35 LIMITS: From West of FM 1460 to CR 195 LENGTH: 1.77 Miles CONTROL: 0204-01-OXX COUNTY: Williamson Project limits were extended to 1400 feet west of FM 1460. As a result, Carter & Burgess, Inc., herein after called the ENGINEER, shall provide the following additional services: The extension required establishment of horizontal control and the addition of a benchmark for the new section. Additional Right-of Way will be surveyed and staked and adjacent parcels will have to be researched. Utility location in the new section will be determined. Additional Right-of-Way sheets will be prepared. Horizontal and vertical alignments through the intersection will be designed with the typical section changed to a curb and gutter section. Drainage design through the area will also change to a curb and gutter section. Additional bore holes will be required. Signing and striping and traffic control plans will be determined. An intersection traffic signal system will be designed. A tie-in to the future extension of Double Creek will be added. Additional pull boxes and conduit are necessary for the openings at the Double Creek and Arterial A connections. An additional bridge will be designed and quantified at Arterial B. Additional bore holes will be required. A detailed drainage study is required. The existing 3-6'x6' culvert was added as well as 2- 6'x6' boxes. The downstream channel will be analyzed to determine if it can convey the additional flow. The downstream channel will be surveyed to provide required information for analysis. The design of a culvert for the offsite area east of FM 1460 and north of US 79 is necessary. Coordination with adjacent landowners will increase, including provision of plots and other requested information. PROJECT SCHEDULE US 79 - FROM FM 1460 TO CR 195 Act Early Early ID Description 2000 2001 2002 2003 1000 Project Management 037 00 07PR02 ,Project Management 1030 Prepare Schematic(Final) 01JUN00 29JUN01 Prepare Schematic(Final) 1060 Draft Environmental Assessment 25AUG00 29JUN01 Draft Environmental Assessment 1070 Submit Draft Environmental Assessment 29JUN01 Submit Draft Environmental Assessment 1080 Agency Review 02JUL01 20AUG01 L r"L�Agency Review 1090 Respond to Reviewing Agency Comments 21AUG01 03SEP01 Respond to Reviewing Agency Comments 1095 Agency Review 04SEP01 040CT01 Z Agency Review 1100 Reviewing Agency Approval for Further 040CT01_ 40 Advertise iewing Agency Heapp g val for Further Processing i 1110 Advertise Public Hearin 050CT01 --- _ 1120 Hold One(1)Public Hearing 15NOV01 L-►<,,>Hold One(1) Public Hearing 1130 Prepare Transcript,Summary,and Analysis 15NOV01 14DEC01 Prepare Transcript,Summary,and Analysis 1140 Submit Public Hearing Report 20DEC01 21 DECO Submit Public Hearing Report 1150 Agency Review 24DEC01 15JAN02 Agency Review 1160 Notice of Approved Environmental Assessment 15JAN02 E;�j>Notice of Approved Environmental Assessme 1170 Field Surveys(DTM&Property) 10MAY00 01JUN01 ,Field Surveys(DTM&Property) 1180 ROW Plans and Procurement 04JUN01 01APR02 /_ ,ROW Plans and Procurement', 1190 Adjust Utilities 04JUN01 01APR02 ► ,Adjust Utilities 1200 Geotechnical Design 04JUN01 01AUG01 ,Geotechnical Design 1210 Roadway Design(include TCP) 04JUN01 01 OCT01 /_ Roadway Design(include TCP) 1220 Hydraulic Design 02JUL01 260CT01Hydraulic Design 1230 Structural Design 02JUL01 260CT01 Structural Design 1240 18' Water Relocation Design 02JUL01 03SEP01 rmwl"8'�'Water Relocation Design ' 1260 Landscape Design(Conceptual) 01AUG01 03SEP01 Landscape Design(Conceptual) /ham 1270 Plans,Specifications,and Estimates 04JUN01 04DEC01 �_ ®y�Plans,Specifications, and Estimates 1280 Submit PS&E(District Review) 26NOV01 ► Submit PS&E(District Review) 1285 PS&E District Review 27NOV01 14DEC01 + PS&E District Review, 1286 Address District Comments 17DEC01 02JAN02 Z,Address District Comments 1287 Submit PS&E(Division) 03JAN02 ►< Submit PS&E(Division) 1288 PS&E Review(Division) 04JAN02 01APR02 zPS&E Review(Division) 1290 Proposed Letting Date 02APR02 _ �-��Proposed Letting Date Start date 03APR00 Finish date 02APRo2 Early start point Data date 03APR00 Early finish point Run date 07JUN01 lllllllllllllllt Early bar Page number 1A O Start milestone point ©Primavera Systems,Inc. Finish milestone point SUPPLEMENTAL ENGINEERING FEE ESTIMATE US 79 i WILLIAMSON COUNTY t CARTER&BURGESS-SURVEY FROM:1700'FM 1460 MAY 31,2001 TO:CR 195 (US79GAP) 4-LANE BLVD.SECTION LENGTH=1.6 MILE SHEET 1 OF 4 ESTIMATED MANHOURS OF EACH WORK TASK TASK AND DESCRIPTION PROJ.MGR. R.P.L.S. FIELD TECH./ 3-MAN CLERICAL TOTAL SUPERVISOR CADD SURV CREW MANHOURS I.PROJECT MANAGEMENT(F.C.110) A.Coordination and Review 0 B.Contract Administration 0 C.Quality Assurance/Quality Control 0 SUBTOTALS: 0 0 0 0 0 0 0 II.ROUTE AND DESIGN STUDIES(F.C.120) A.Schematic Design 1.Data Collection 0 2.Initial Field Reconnaissance 0 3.Identify Property Ownership 0 4.Develop Three(3)Alter.Designs 0 5.Typical Sections 0 6.Right of Way Requirements 0 0 0 B.Design Concept Conference 0 C.Preliminary Cost Estimate 0 0 SUBTOTALS: 0 0 0 0 0 0 0 III.SOCIAL ECONOMIC&ENVIRONMENTAL STUDIES(F.C.120) A.Environmental Assessment 1.Agency Coordination 0 2.Purpose and Need for Action 0 3.Alternatives 0 4.Socioeconomic Data 0 5.Field Investigation 0 6.Land Use 0 7.Geology and Groundwater 0 8.Noise and Vibration 0 9.Surface Water Hydrology 0 10.Air Quality 0 11.Cultural Resources 0 12.Ecological Resources 0 13.Wetlands 0 14.Endangered Species 0 15.Relocation 0 16.Prime Farm Land 0 B.Review and Process 0 SUBTOTALS: 0 0 0 0 0 0 0 SUPPLEMENTAL ENGINEERING FEE ESTIMATE US 79 WILLIAMSON COUNTY CARTER&BURGESS-SURVEY FROM:1700'FM 1460 MAY 31,2001 TO:CR 195 (US79GAP) 4-LANE BLVD.SECTION LENGTH=1.6 MILE SHEET 2 OF 4 ESTIMATED MANHOURS OF EACH WORK TASK TASK AND DESCRIPTION PROJ.MGR. R.P.L.S. FIELD TECH./ 3-MAN CLERICAL TOTAL SUPERVISOR CADD SURV CREW MANHOURS IV.PUBLIC INVOLVEMENT(F.C.120) A.Public Meeting 1.Prepare Meeting Exhibits 0 2.Assist with Meeting 0 3.Prepare Draft Summary and Analysis 0 A.Public Hearing 1.Prepare Notice for Public Hearing 0 2.Assist with Hearing 0 3.Prepare Final Summary and Analysis 0 SUBTOTALS: 0 0 0 0 0 0 0 V.RIGHT OF WAY PLANS(F.C.134) A.Ownership Data 0 B.Utility Locations 0 C.Right of Way Plans 1.Prepare Right of Way Plans 3 2 26 31 2.Calculate Right of Way Req. 1 0 4 5 3.Calculate Parcel Areas 1 0 4 5 D.Prepare Feld Notes&Parcel Plats 2 6 23 9 40 E.Research and Tract Analysis 2 13 15 F.Notify Utility Owners/Locate Utility 2 2 1 0 5 SUBTOTALS: 11 10 0 71 9 0 101 VI.FIELD SURVEYS(F.C.154) A.Establish Horizontal Control 1 1 2 6 10 B.Vert.Control& BM's @(2000')Interivals 1 1 12 14 C.Stake Centerline 0 D.Existing Cross Sections and Ties 1.Project and Channel Topo 1 2 22 20 45 2.Connecting Roads 0 3.Drainage Channels 0 4.Existing Bridges and Culverts 0 5.Connections to CR 195&FM 1460 0 6. Railroad Survey 1 2 4 7 E.Survey and Stake Right-Of-Way 1 1 10 12 F. Data Coordination/CADD Delivery 2 4 6 SUBTOTALS: 0 6 4 32 52 0 94 SUPPLEMENTAL ENGINEERING FEE ESTIMATE US 79 WILLIAMSON COUNTY CARTER&BURGESS-SURVEY FROM:1700'FM 1460 MAY 31,2001 TO:CR 195 (US79GAP) 4-LANE BLVD.SECTION LENGTH=1.6 MILE SHEET 3 OF 4 ESTIMATED MANHOURS OF EACH WORK TASK TASK AND DESCRIPTION PROJ.MGR, R.P.L.S. FIELD TECHJ 3-MAN CLERICAL TOTAL SUPERVISOR CADD SURV CREW MANHOURS I.PROJECT MANAGEMENT(F.C.110) TOTAL HOURS: 0 0 0 0 0 0 0 SALARY RATES: $68.25 $117.55 $75.01 $65.00 $113.16 DIRECT SALARY COST: $0 $0 $0 $0 $0 $0 OVERHEAD MULTIPLIER: 0 $0 $0 $0 $0 $0 $0 PROFIT: 0.00% $0 $0 $0 $0 $0 $0 TOTAL: $0 $0 $0 $0 $0 $0 $0 II.ROUTE AND DESIGN STUDIES(F.C.110) TOTAL HOURS: 0 0 0 0 0 0 0 SALARY RATES: $68.25 $117.55 $75.01 $65.00 $113.16 $0.00 DIRECT SALARY COST: $0 $0 $0 $0 $0 $0 OVERHEAD MULTIPLIER: 0 $0 $0 $0 $0 $0 $0 PROFIT: 0.00% $0 $0 $0 $0 $0 $0 TOTAL: $0 $0 $0 $0 $0 $0 $0 III.SOCIAL ECONOMIC&ENVIRONMENTAL STUDIES(F.C.120) TOTAL HOURS: 0 0 0 0 0 0 0 SALARY RATES: $68.25 $117.55 $75.01 $65.00 $113.16 $0.00 DIRECT SALARY COST: $0 $0 $0 $0 $0 $0 OVERHEAD MULTIPLIER: 0 $0 $0 $0 $0 $0 $0 PROFIT: 0.00% $0 $0 $0 $0 $0 $0 TOTAL: $0 $0 $0 $0 $0 $0 $0 IV.PUBLIC INVOLVEMENT(F.C.120) TOTAL HOURS: 0 0 0 0 0 0 0 SALARY RATES: $68.25 $117.55 $75.01 $65.00 $113.16 $0.00 DIRECT SALARY COST: $0 $0 $0 $0 $0 $0 OVERHEAD MULTIPLIER: 0 $0 $0 $0 $0 $0 $0 PROFIT: 0.00% $0 $0 $0 $0 $0 $0 TOTAL: $0 $0 $0 $0 $0 $0 $0 V.RIGHT OF WAY PLANS(F.C.134) TOTAL HOURS: 11 10 0 71 9 0 101 SALARY RATES: $68.25 $117.55 $75.01 $65.00 $113.16 $0.00 DIRECT SALARY COST: $751 $1,117 $0 $4,615 $1,018 $0 OVERHEAD MULTIPLIER: 0 $0 $0 $0 $0 $0 $0 PROFIT: 0.000% $0 $0 $0 $0 $0 $0 TOTAL: $751 $1,117 $0 $4,615 $1,018 $0 $7,501 VI.FIELD SURVEYS(F.C.154) TOTAL HOURS: 0 6 4 32 52 0 94 SALARY RATES: $68.25 $117.55 $75.01 $65.00 $113.16 $0.00 DIRECT SALARY COST: $0 $705 $263 $2,080 $5,884 $0 OVERHEAD MULTIPLIER: 0 $0 $0 $0 $0 $0 $0 PROFIT: 0.00% $0 $0 $0 $0 $0 $0 TOTAL: $0 $705 $263 $2,080 $5,884 $0 $8,932 SUPPLEMENTAL ENGINEERING FEE ESTIMATE US 79 WILLIAMSON COUNTY r CARTER&BURGESS-SURVEY FROM:1700'FM 1460 MAY 31,2001 TO:CR 195 (US79GAP) 4-LANE BLVD.SECTION LENGTH=1.6 MILE SHEET 4 OF 4 ESTIMATED MANHOURS OF EACH WORK TASK TASK AND DESCRIPTION PROJ.MGR. R.P.L.S. FIELD TECH./ 3-MAN CLERICAL TOTAL SUPERVISOR CADD SURV CREW MANHOURS VII.ROADWAY DESIGN(F.C.160) TOTAL HOURS: 0 0 0 0 0 0 0 SALARY RATES: $68.25 $117.55 $75.01 $65.00 $113.16 $0.00 DIRECT SALARY COST: $0 $0 $0 $0 $0 $0 OVERHEAD MULTIPLIER: 0 $0 $0 $0 $0 $0 $0 PROFIT: 0.00% $0 $0 $0 $0 $0 $0 TOTAL: $0 $0 $0 $0 $0 $0 $0 VIII.PREPARATION OF CONSTRUCTION PLANS TOTAL HOURS: 0 0 0 0 0 0 0 SALARY RATES: $68.25 $117.55 $75.01 $65.00 $113.16 $0.00 DIRECT SALARY COST: $0 $0 $0 $0 $0 $0 OVERHEAD MULTIPLIER: 0 $0 $0 $0 $0 $0 $0 PROFIT: 0.00% $0 $0 $0 $0 $0 $0 TOTAL: $0 $0 $0 $0 $0 $0 $0 TOTAL CARTER&BURGESS-SURVEY TOTAL HOURS: 11 15.5 3.5 103 61 0 194 SALARY RATES: $68.25 $117.55 $75.01 $65.00 $113.16 $0.00 DIRECT SALARY COST: $751 $1,822 $263 $6,695 $6,903 $0 $16,433 OVERHEAD MULTIPLIER: 0 $0 $0 $0 $0 $0 $0 $0 PROFIT: 0.00% $0 $0 $0 $0 $0 $0 $0 TOTAL: $751 $1,822 $263 $6,695 $6,903 $0 $16,433 PERCENT OF CARTER&BURGESS 4.57% 11.09% 1.60% 40.74% 42.01% 0.00% 100.00% SURVEY COST DIRECT COST-CARTER&BURGESS-SURVEY: Mylar Plots Square Feet at $3.50 /Square Foot $0 Blueline Reproductions or Printing Square Feet at $0.25 /Square Foot $0 Survey Materials and Supplies $200 Express Deliveries Deliveries at $20.00 /Delivery $0 Auto Mileage Miles at $0.315 /Mile $0 Air Travel Filghts at $250.00 /Round Trip $0 Lodging Nights at $85.00 Might $0 Per Diem Days at $35.00 /Day $0 Auto Rental Days at $60.00 /day $0 Telephone&Communications TOTAL DIRECT COST-CARTER&BURGESS-SURVEY $200 SUMMARY-CARTER&BURGESS-SURVEY Labor+Overhead+Profit $16,433 Direct Cost $200 TOTAL CONTRACT COST-CARTER&BURGESS-SURVEY $16,633 SUPPLEMENTAL ENGINEERING FEE ESTIMATE US 79 WILLIAMSON COUNTY CARTER&BURGESS,INC. FROM:1700'FM 1460 MAY 31,2001 4-LANE BLVD.SECTION TO:CR 195 (US79GAP) LENGTH=1.6 MILE SHEET 1 OF 6 ESTIMATED MANHOURS OF EACH WORK TASK TASK AND DESCRIPTION PROJECT DESIGN ASST.DESIGN. SR.ENVR. CADD CLERICAL TOTAL I.PROJECT MANAGEMENT(F.C.110) MANAGER ENGINEER ENGINEER SCIENTIST DRAFTER MANHOURS A.Coordination and Review 40 40 0 0 80 B.Contract Administration 8 8 20 36 C.Quality Assurance/Quality Control 24 24 SUBTOTALS: 72 48 0 0 0 20 140 II.ROUTE AND DESIGN STUDIES(F.C.110) A.Schematic Design 1.Data Collection 4 4 8 2.Initial Field Reconnaissance 4 4 3.Identify Property Ownership 0 4.Develop Designs 16 16 20 52 5.Typical Sections 8 2 4 14 6.Right of Way Requirements 8 4 4 16 0 0 B.Design Concept Conference 0 2 0 0 0 2 C.Preliminary Cost Estimate 0 8 2 10 0 0 SUBTOTALS: 0 50 28 0 28 0 106 III.SOCIAL ECONOMIC&ENVIRONMENTAL STUDIES(F.C.120) A.Environmental Assessment 1.Agency Coordination 2 0 0 2 2.Purpose and Need for Action 1 1 3.Alternatives 0 1 0 0 1 4.Socioeconomic Data 2 2 5.Field Investigation 4 4 6.Land Use 0 0 7.Geology and Groundwater 2 2 8.Noise and Vibration 4 4 9.Surface Water Hydrology 2 2 10.Air Quality 6 6 11.Cultural Resources 4 4 12.Ecological Resources 2 2 13.Wetlands 1 1 14.Endangered Species 1 1 15.Relocation 0 0 16.Prime Farm Land 2 2 0 B.Assemble,Review and Process 0 0 6 0 0 6 SUBTOTALS: 0 0 0 40 0 0 40 ' SUPPLEMENTAL ENGINEERING FEE ESTIMATE US 79 WILLIAMSON COUNTY CARTER&BURGESS,INC. FROM:1700'FM 1460 MAY 31,2001 4-LANE BLVD.SECTION TO:CR 195 (US79GAP) LENGTH=1.6 MILE SHEET 2 OF 6 ESTIMATED MANHOURS OF EACH WORK TASK TASK AND DESCRIPTION PROJECT DESIGN ASST.DESIGN. SR.ENVR. CADD CLERICAL TOTAL MANAGER ENGINEER ENGINEER SCIENTIST DRAFTER MANHOURS IV.PUBLIC INVOLVEMENT(F.C.120) A.Public Meeting 1.Prepare Meeting Notice and Exhibits 0 0 0 0 0 0 2.Assist with Meeting 0 0 0 0 0 0 3.Prepare Draft Summary and Analysis 0 0 0 0 0 A.Public Hearing 1.Prepare Notice&Exhibits 0 0 0 0 0 0 0 2.Assist with Hearing 0 0 0 0 0 0 3.Prepare Final Summary and Analysis 0 0 0 0 0 SUBTOTALS: 0 0 0 0 0 0 0 V.UTILITY/R.O.W.COORD.(F.C.130) A.Ownership Data 0 B.Utility Locations 0 C.Right of Way Plans 1.Prepare Right of Way Plans 2 4 6 2.Calculate Right of Way Req. 0 3.Calculate Parcel Areas 0 D.Prepare Field Notes 6 6 E.Research and Tract Analysis 0 F.Notify/Meeting w/Utility Owners 6 20 16 20 3 65 SUBTOTALS: 8 24 16 0 20 9 77 VI.FIELD SURVEYS(F.C.150) A.Establish Horizontal and Vertical Control 0 B.Establish Benchmarks at(2000')Interivals 0 C.Stake Centerline 0 D.Existing Cross Sections and Ties 1.Proposed Roadway Centerline 1 1 2.Connecting Roads 1 1 3.Drainage Channels 2 2 4.Existing Bridges and Culverts 2 2 5.Connections to CR 195&FM 1460 0 0 0 E.Survey and Stake Right-Of-Way 1 1 0 F.Stake Core Test Holes 1 1 SUBTOTALS: 0 0 8 0 0 0 8 SUPPLEMENTAL ENGINEERING FEE ESTIMATE US 79 WILLIAMSON COUNTY CARTER&BURGESS,INC. FROM:1700'FM 1460 MAY 31,2001 4-LANE BLVD.SECTION TO:CR 195 (US79GAP) LENGTH=1.6 MILE SHEET 3 OF 6 ESTIMATED MANHOURS OF EACH WORK TASK TASK AND DESCRIPTION PROJECT DESIGN ASST.DESIGN. SR.ENVR. CADD CLERICAL TOTAL MANAGER ENGINEER ENGINEER SCIENTIST DRAFTER MANHOURS VII.ROADWAY DESIGN(F.C.160) A.Geometric Design 1.Horizontal Alignment 0 4 2 4 10 2.Vertical Alignment 0 2 2 2 6 3.Right-Of-Way Requirements 1 2 2 4 g 4.Typical Sections 1 2 2 2 7 0 0 0 SUBTOTALS: 2 10 8 0 12 0 32 SHEET TOTALS NO,OF PROJ. MGR. DESIGN ENGR. ASST./ENG. SR.ENV.SCI. CADD DRAFTER CLERICAL TOTAL HOURS SHEETS HOUR; HRS./ HOURS HRS./ HOURS HRS./ HOURS HRS./ HOURS HRS./ HOURS HRS./ HOURS PER SHEET —SHEET SHEET SHEET SHEET SHEET SHEET VIII.PREPARATION OF CONSTRUCTION PLANS (F.C.165) A.ROADWAY DESIGN 1.Title Sheet&Index 0 1 0 2 0 8 0 0 a 0 0 0 0 2.Project Layout 0 1 0 1 0 2 0 0 8 0 0 0 0 3.Typical Sections 1 0 0 2 2 2 2 0 4 4 0 8 8 4.Plan and Profile/Intersection Sheets 2 1 2 4 8 4 8 0 8 16 0 34 17 5.Horiz.Allig.&Cross Slope 0 1 0 1 0 1 0 0 2 0 0 0 0 6.Roadway Summaries 0 1 0 2 0 4 0 0 8 0 0 0 0 7.General Notes and Spec.Data 0 1 0 8 0 4 0 0 2 0 8 8 0 8.Estimate and Quantities 0 1 0 2 0 4 0 0 10 0 0 0 0 9.Utility Layouts 0 1 0 4 0 6 0 0 8 0 0 0 0 SUBTOTAL: 3 2 10 10 0 20 8 50 17 B.DRAINAGE 1.Drainage Area Maps 2 1 2 8 16 10 20 0 10 20 0 58 29 2.Hydraulic Data 0 1 0 8 0 10 0 0 10 0 0 0 0 3.Drainage Sheet 2 0 0 4 8 6 12 0 8 16 0 36 18 4.Culvert Cross Sec.&Details 2 1 2 8 16 10 20 0 10 20 0 58 29 5.Drainage Details 1 1 1 4 4 6 6 0 8 8 0 19 19 6.Storm Water Pol.Prev.Plan/Eros 2 0 0 2 4 4 8 0 4 8 0 20 10 7.Drainage Summary 0 1 0 2 0 4 0 0 8 0 0 0 0 SUBTOTAL: 9 5 48 66 0 72 0 191 21 SUPPLEMENTAL ENGINEERING FEE ESTIMATE US 79 WILLIAMSON COUNTY CARTER&BURGESS,INC. FROM:1700'FM 1460 MAY 31,2001 4-LANE BLVD.SECTION TO:CR 195 (US79GAP) LENGTH=1.6 MILE SHEET 4 OF 6 VIII.PREPARATION OF CONSTRUCTION PLANS F.C.165 CONTINUED SHEET TOTALS NO.OF PROJ.MGR. DESIGN ENGR. ASST)ENGR. SR.ENV.SCI. CADD DRAFTER CLERICAL TOTAL HOURS SHEETS HOURS HRS./ HOURS HRS./ HOURS HRS./ HOURS HRS./ HOURS HRS./ HOURS HRS./ HOURS PER SHEET SHEET SHEET SHEET SHEET SHEET SHEET C.SIGNING AND MARKINGS 1.Sign.,Strip.,and Del.Plan 1 1 1 4 4 8 8 0 8 8 0 21 21 2.Summary of Small Signs 0 1 0 2 0 4 0 0 10 0 0 0 0 3.Sign Details 0 1 0 4 0 9 0 0 12 0 0 0 0 SUBTOTAL: 1 1 4 8 0 8 0 21 21 D.MISCELLANEOUS ROADWAY 1.Traffic Control Plan,Detour 3 1 3 4 12 8 24 0 10 30 0 69 23 Sequence of Construction 2.Signalization(FM 1460) 5 1 5 4 20 8 40 0 8 40 0 105 21 3.Pull Boxes and Conduit(2-Intersections) 2 0 0 4 8 4 8 9 16 32 16 4.Construction Time Estimates # 0 1 0 4 0 a 0 0 0 0 0 0 0 5.Landscaping(Conceptual Only) 0 2 0 4 0 16 0 0 16 0 0 0 0 SUBTOTAL: 10 8 40 72 0 86 0 206 21 E.BRIDGE DESIGN 1.Bridge Layout 1 1 1 12 12 6 6 0 9 9 0 28 28 2.Bridge Layout-Boring Logs 1 1 1 6 6 5 5 0 3 3 0 15 15 3.Estimated Quantities&Bearing Seat EL. 1 1 1 12 12 9 9 0 6 6 0 28 28 4.2 Abutments 2 1 2 6 12 12 24 0 12 24 0 62 31 5.2 Interior Bents 2 1 2 15 30 12 24 0 12 24 0 80 40 6.P/S Conc I-Beam Slab Details 1 1 1 12 12 6 6 0 9 9 0 28 28 7.Miscellaneous Slab Details 1 1 1 10 10 10 10 0 10 10 0 31 31 8.Beam Design 1 1 1 32 32 18 18 0 6 6 0 57 57 9.TxDOT Bridge Standards 15 0 1 15 0 0 1 15 0 30 2 SUBTOTAL: 25 10 141 102 0 106 0 359 14 0 0 0 0 0 0 0 0 0 0 0 0 0 SUBTOTAL: 0 0 0 0 0 0 0 0 0 TOTALS(Prep.of Const.Plans) DESIGN TOTALS: 48 26 243 258 0 292 8 827 17 PERCENT OF TOTAL HOURS: 3.14% 29.38% 31.20% 0.00% 35.31% 0.97% 100.00% SUPPLEMENTAL ENGINEERING FEE ESTIMATE US 79 WILLIAMSON COUNTY CARTER&BURGESS,INC. FROM:1700'FM 1460 MAY 31,2001 4-LANE BLVD.SECTION TO:CR 195 (US79GAP) LENGTH=1.6 MILE SHEET 5 OF 6 ESTIMATED COST OF EACH WORK TASK TASK AND DESCRIPTION PROJECT DESIGN ASST.DESIGN. SR.ENVR. CADD CLERICAL TOTAL I.PROJECT MANAGEMENT(F.C.110) MANAGER ENGINEER ENGINEER SCIENTIST DRAFTER MANHOURS TOTAL HOURS: 72 48 0 0 0 20 140 SALARY RATES: $58.00 $38.00 $33.00 $28.00 $27.00 $18.00 DIRECT SALARY COST: $4,176 $1,824 $0 $0 $0 $360 OVERHEAD MULTIPLIER: 1.7473 $7,297 $3,187 $0 $0 $0 $629 PROFIT: 15.00% $1,721 $752 $0 $0 $0 $148 TOTAL: $13,194 $5,763 $0 $0 $0 $1,137 $20,094 Ii.ROUTE AND DESIGN STUDIES(F.C.110) TOTAL HOURS: 0 50 28 0 28 0 106 SALARY RATES: $58.00 $38.00 $33.00 $28.00 $27.00 $18.00 DIRECT SALARY COST: $0 $1,900 $924 $0 $756 $0 OVERHEAD MULTIPLIER: 1.7473 $0 $3,320 $1,615 $0 $1,321 $0 PROFIT: 15.00% $0 $783 $381 $0 $312 $0 TOTAL: $0 $6,003 $2,919 $0 $2,389 $0 $11,311 IIi.SOCIAL ECONOMIC&ENVIRONMENTAL STUDIES(F.C.120) TOTAL HOURS: 0 0 0 40 0 0 40 SALARY RATES: $58.00 $38.00 $33.00 $28.00 $27.00 $18.00 DIRECT SALARY COST: $0 $0 $0 $1,120 $0 $0 OVERHEAD MULTIPLIER: 1.7473 $0 $0 $0 $1,957 $0 $0 PROFIT: 15.00% $0 $0 $0 $462 $0 $0 TOTAL: $0 $0 $0 $3,539 $0 $0 $3,539 IV.PUBLIC INVOLVEMENT(F.C.120) TOTAL HOURS: 0 0 0 0 0 0 0 SALARY RATES: $58.00 $38.00 $33.00 $28.00 $27.00 $18.00 DIRECT SALARY COST: $0 $0 $0 $0 $0 $0 OVERHEAD MULTIPLIER: 1.7473 $0 $0 $0 $0 $0 $0 PROFIT: 15.00% $0 $0 $0 $0 $0 $0 TOTAL: $0 $0 $0 $0 $0 $0 $0 V.UTILITY/R.0.W.COORD.(F.C.130) TOTAL HOURS: 8 24 16 0 20 9 77 SALARY RATES: $58.00 $38.00 $33.00 $28.00 $27.00 $18.00 DIRECT SALARY COST: $464 $912 $528 $0 $540 $162 OVERHEAD MULTIPLIER: 1.7473 $811 $1,594 $923 $0 $944 $283 PROFIT: 15.00% $191 $376 $218 $0 $223 $67 TOTAL: $1,466 $2,881 $1,668 $0 $1,706 $512 $8,233 Vi.FIELD SURVEYS(F.C.150) TOTAL HOURS: 0 0 7.7 0 0 0 8 SALARY RATES: $58.00 $38.00 $33.00 $28.00 $27.00 $18.00 DIRECT SALARY COST: $0 $0 $254 $0 $0 $0 OVERHEAD MULTIPLIER: 1.7473 $0 $0 $444 $0 $0 $0 PROFIT: 15.00% $0 $0 $105 $0 $0 $0 TOTAL: $0 $0 $803 $0 $0 $0 $803 SUPPLEMENTAL ENGINEERING FEE ESTIMATE US 79 I WILLIAMSON COUNTY s CARTER&BURGESS,INC. FROM:1700'FM 1460 MAY 31,2001 4-LANE BLVD.SECTION TO:CR 195 (US79GAP) LENGTH=1.6 MILE SHEET 6 OF 6 ESTIMATED COST OF EACH WORK TASK TASK AND DESCRIPTION PROJECT DESIGN ASST.DESIGN. SR.ENVR. CADD CLERICAL TOTAL ` MANAGER ENGINEER ENGINEER SCIENTIST DRAFTER MANHOURS VII.ROADWAY DESIGN(F.C.160) TOTAL HOURS: 2 10 8 0 12 0 32 SALARY RATES: $58.00 $38.00 $33.00 $28.00 $27.00 $18.00 DIRECT SALARY COST: $116 $380 $264 $0 $324 $0 OVERHEAD MULTIPLIER: 1.7473 $203 $664 $461 $0 $566 $0 PROFIT: 15.00% $48 $157 $109 $0 $134 $0 TOTAL: $366 $1,201 $834 $0 $1,024 $0 $3,425 VIII.PREPARATION OF CONSTRUCTION PLANS (F.C.165) TOTAL HOURS: 26 243 258 0 292 8 827 SALARY RATES: $58.00 $38.00 $33.00 $28.00 $27.00 $18.00 DIRECT SALARY COST: $1,508 $9,234 $8,514 $0 $7,884 $144 OVERHEAD MULTIPLIER: 1.7473 $2,635 $16,135 $14,877 $0 $13,776 $252 PROFIT: 15.00% $621 $3,8051 $3,509 $0 $3,249 $59 TOTAL: $4,764 $29,174 $26,899 $0 $24,909 $455 $86,201 TOTAL CARTER&BURGESS,INC.: TOTAL HOURS: 108 375 318 40 352 37 1,230 SALARY RATES: $58.00 $38.00 $33.00 $28.00 $27.00 $18.00 DIRECT SALARY COST: $6,264 $14,250 $10,484 $1,120 $9,504 $666 $42,288 OVERHEAD MULTIPLIER: 1.7473 $10,945 $24,899 $18,319 $1,957 $16,606 $1,164 $73,890 PROFIT: 15.00% $2,581 $5,872 $4,320 $4621 $3,917 $274 $17,427 TOTAL: $19,790 $45,021 $33,123 $3,539 $30,027 $2,104 $133,605 PERCENT OF CARTER&BURGESS COST: 14.81% 33.70% 24.79% 2.65% 22.47% 1.57% 100.00% DIRECT COST-CARTER&BURGESS,INC.: Mylar Plots 82 Square Feet at $3.50 /Square Foot $287 Blueline Reproductions or Printing 815 Square Feet at $0.36 /Square Foot $293 Survey Materials and Supplies $0 Express Deliveries 0 Deliveries at $20.00 /Delivery $0 Auto Mileage(Incl.18"Waterline Oversight) 0 Miles at $0.315 /Mile $0 Air Travel 0 Filghts at $250.00 /Round Trip $0 Lodging 0 Nights at $85.00 /Night $0 Per Diem 0 Days at $35.00 /Day $0 Auto Rental 0 Days at $60.00 /day $0 Telephone,Communications and Advertisements $0 Court Recorder&Transcriber $0 Geotechnical/Pavement&Foundation Design-Raba-Kistner-Brytest $7,300 Carter&Burgess Survey $16,633 (TOTAL DIRECT COST-CARTER&BURGESS,INC. $24,513 SUMMARY-CARTER&BURGESS,INC. Labor+Overhead+Profit $133,605 Direct Cost $24,513 TOTAL CONTRACT COST-CARTER&BURGESS,INC. $158,118 I I� � 1 • I , i CR 1951S US - I I I J , I . �'iII lr MIMI1 1� rl -tet I N 4oa ad U.S 79 from 1400ft West of FM 1460 to CR 195 S Pu Crl`� .+w DATE: June 22, 2001 SUBJECT: City Council Meeting—June 28, 2001 ITEM: 12.C.2. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. Ito the Contract for Engineering Services with Carter& Burgess, Inc.for the preparation of plans, specifications, and estimates for 1.5 miles of US 79 from CR 195 to FM 1460. The original contract was approved on March 23, 2000, for the preparation of plans, specifications, and estimates for 1.5 miles of US 79 from County Road 195 to FM 1460. This Supplemental Agreement No. 1 will extend the contract to December 31, 2002 and modify the Scope of Work to extend the project limits to 1,400 feet west of FM 1460. At a cost of $158,118 which will bring the total cost of the contract to $556,300. Resource: Jim Nuse, Public Works Director Tom Word, Traffic Engineer History: The original contract was approved on March 23, 2000, by council by resolution no. R-00-03-23-15A4 for preparation of plans, specifications, and estimates for 1.5 miles of US 79 from County Road 195 to FM 1460. Supplemental Agreement No. 1 will extend the contract to December 31, 2002 and modify the Scope of Work to extend the project limits to 1400 feet west of FM 1460. Supplemental Agreement No. 1 is in the amount of$158,118 which will bring the total cost of the contract to $556,300. Funding: Cost: $158,118 Source of funds: '/2 cent sales tax revenue Outside Resources: Carter-Burgess, Inc Impact/Benefit: This project will improve safety and mobility for this road. Public Comment: N/A Sponsor: N/A