Loading...
R-01-06-28-12C3 - 6/28/2001 RESOLUTION NO. R-01-06-28-12C3 WHEREAS, the City of Round Rock has duly advertised for bids for the South 81 Standpipe Demolition and Elevated Water Storage Tank Construction Project, and WHEREAS, CB&I Constructors, Inc . has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of CB&I Constructors, Inc . , Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the bid of CB&I Constructors, Inc. is hereby accepted as the lowest responsible bid and subject to the negotiation and final approval by the City Manager and City Attorney of a contract document, the Mayor is hereby authorized and directed to execute a contract with CB&I Constructors, Inc . for the South 81 Standpipe Demolition and Elevated Water Storage Tank Construction Project . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act . 0:\WPDOCS\RESOLUTI\R10628C3.WPD/sc RESOLVED this 28th day of June, 01 . ROBE "STLUKk,. Mayor City of Round Rock, Texas ATTEST: I-a.al *uad� 02 J E LAND, City Secretary 2 June 11, 2001 Mr. Don Rundell, P.E. City of Round Rock 2008 Enterprise Round Rock, TX 78664 Re: City of Round Rock Water System Improvements Contract 6 - 81 South Standpipe Demolition and Elevated Water Storage Tank Construction Recommendation to Award Contract Dear Mr. Rundell: On June 5, 2001, HDR Engineering assisted the City of Round Rock in opening bids for the above referenced project. Two bid proposals were received with total base bid prices of $1,767,000 and $1,840,000. A tabulation of the bids received is attached. The apparent low bidder was CB&I Constructors, Inc. from Houston, Texas. HDR has reviewed the bid proposal submitted by CB&I Constructors and contacted several of their references. Based upon this information, we recommend that the City of Round Rock accept the base bid of CB&I Constructors, Inc. in the amount of$1,767,000. We have prepared the attached NOTICE OF AWARD letter and other contract documents to be forwarded to CB&I Constructors if the City of Round Rock concurs with this recommendation. Please call me if you have any questions. Sincerely, HDR Engineering, Inc. Neil Graff, P.E. Project Manager enc HDR Engineering, Inc. 2211 South IH 35 Telephone Suite 300 512 912-5100 Austin,Texas Fax Employee Owned 78741 512 912-5158 Bid Tabulation j� City of Round Rock Water System Improvements Contract # 6 - 81 South Standpipe Demolition and Elevated Water Storage Tank Bids Opened June 5, 2001, 2:00 PM Bidder: CB&I Constructors Landmark Structures Bid Bond Y Y Bidder's Questionnaire Y Y Tank Sketches/ Foundation Design Y Y Bid item # Description Total Price Total Price Base Bid Items 1 Mobilization $ 30,000.00 $ 75,000.00 2 Demolition $ 32,000.00 $ 25,000.00 3 1.25 MG Elevated Tank Construction $ 1,432,500.00 $ 1,490,000.00 4 16-Inch Water Line $ 270,000.00 $ 248,000.00 5 Trench/Excavation Safety Systems $ 2,500.00 $ 2,000.00 Total Base Bid Amount, (Sum of Items 1-5): $ 1,767,000.00 $ 1,840,000.00 Alternate Bid Items Al Calendar days to Substantial Completion 365 540 A2 Calendar days to Final Completion 425 600 A3 Mobilization $ 30,000.00 $ 75,000.00 A4 Demolition $ 32,000.00 $ 25,000.00 A5 1.25 MG Elevated Tank Construction $ 1,418,500.00 $ 1,390,000.00 A6 16-Inch Water Line $ 270,000.00 $ 248,000.00 A7 Trench/ Excavation Safety Systems $ 2,500.00 $ 2,000.00 Total Alternate Bid Amount, (Sum of Items Al-A7): $ 1,753,000.00 $ 1,740,000.00 i � R �c S. 81 Elevated Tank 0 04 ON a ® LL N dIR?0�� South 81 Elevated Tank Pa, GAS SAGRAPHICS=UNCIL AGENDA ITEMSIENGINEERING181 S.ELEVATED TANK DATE: June 22, 2001 SUBJECT: City Council Meeting—June 28, 2001 ITEM: 12.C.3. Consider a resolution authorizing the Mayor to execute a Contract with CB&I Constructors, Inc.for the South 81 Standpipe Demolition and Elevated Water Storage Tank Construction Project. HDR reviewed the bid proposal that CB&I Constructors, Inc. submitted. They also contacted several of CB&I's references. Based on HDR's recommendation staff recommends acceptance of this contract in the amount of $1,767,000.00. Resource: Jim Nuse, Public Works Director Don Rundell, Senior Engineer History: This project is the final portion (Contract #6) of the Water System Improvements 1998-1999. This project is to upgrade the southeast side of our water system, which is necessary to provide adequate water pressure and sustained fire flows to the southern portion of our water system. On June 5"' we received bids of$1,840,000.00 from Landmark Structure, Inc., and $1,767,000.00 from CB & I Constructors, Inc. This project has a construction time of 365 calendar days. Funding: Cost: $1,767,000.00 Source of funds: Self-Financed Utility Construction Outside Resources: CB &I Constructors, Inc. Impact: To maintain the integrity and reliability of our water system's ability to meet fire flow demand during peak summer demands. Benefit: To maintain the reliability of our water system's ability to meet the increasing demands related to our current growth. Public Comment: N/A Sponsor: N/A