Loading...
R-01-06-28-12C4 - 6/28/2001 RESOLUTION NO. R-01-06-28-12C4 WHEREAS, §8 . 610 (4) Code of Ordinances (1995 Edition) provides for the reimbursement for the oversizing of water mains, and WHEREAS, Berkshire, Inc . has submitted a reimbursement request for the oversizing of water mains associated with the Lake Forest, Section 1-A development, and WHEREAS, the City Council wishes to approve said reimbursement, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the City Council hereby approves of the reimbursement to Berkshire, Inc . of $6, 749 . 60, which is the cost of oversizing water mains associated with the Lake Forest, Section 1-A development . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act . RESOLVED this the 28th day o une, 001 . ROB A. STLUKA, JR Mayor AT T: City of Round Rock, Texas J E LAND, City Secretary 0:\WPDOCS\RESOLUTI\R10628C4.WPD/sC �1 C-1Z Carter :: Burgess Consultants in Planning, Engineering, Architecture, Construction Management, and Related Services August 3, 2000 City of Round Rock Public Works Department 2008 Enterprise Dr. Round Rock,TX 78664 Attention: Mr. Jim Nuse, P.E. Director of Public Works RE: Proposed Oversizing Reimbursement for Water and Wastewater Improvements for Lake Forest Section 1 C&B No. 99-5091-020 Gentlemen: On behalf of the developer for the above referenced project we are requesting reimbursement for oversizing of the following facilities: the 12- inch wastewater main routed through the project; the 12-inch water main located in Lake Forest and Fernspring Drives, and; the 16-inch water main located in Forest Creek Drive. The size of these mains were determined by the City in the Preliminary Plan phase of the project for the overall service area. The 12-inch wastewater main, Wastewater Line `A' in the approved plans, extends from the offsite connection to the City's existing line in Brushy Creek west of the proposed development to the southern limit of Section 1 in Lake Forest Drive. This is a total of 5,246 linear feet of 12-inch wastewater main. A total of 574 LUES in the proposed development flow to this proposed connection location. Utilizing the City of Austin's flow of 245 gallons per day(gpd) per LUE and an infiltration and inflow rate of 750 gpd per acre to account for wet weather flows results in a conveyance requirement at this connection of 337,190 gpd. This is based upon a contributing area of the proposed development of approximately 262 acres at this point.An 8-inch wastewater main set at a grade of 0.4 percent will convey approximately 500,000 gpd. Therefore,the oversizing is the difference of the 12-inch main installed and the 8-inch main that would be required for the development. The 12-inch water main in the approved plans, Water Line `A', extends from Forest Creek Drive along Lake Forest Drive. It then turns west along Fernspring Drive in Section 2 (by S.D. Kallman Engineers)to connect to the 12-inch line in Via Sonoma Trail at the western limit of the development. This is a total of 4,192 linear feet of 12-inch water main. A total of 467 LUEs in the development are located south of Forest Creek Drive. Using the City of Austin's peak hour demand of 900 gallons per person per day, and assuming 3.5 persons per LUE results in a flow of 1,021 gallons per minute(gpm). This results in the need for a 10-inch water line along Forest Creek and Femspring Drive to keep the flow rate at 5 feet per second or less. Therefore, the oversizing is the difference of the 12-inch main installed and the 10-inch main that would be required for this portion of the development. Carter&Burgess,Inc. Suite 200 Barton Oaks Plazay 901 South MoPac Expressway Austin, Texas 78746 (512)314-3100 Fax (512)314-3135 August 3,2000 City of Round Rock Mr. Jim Nuse, P.E. Page 2 The 16-inch water main in Forest Creek Drive, Water Line `O' in the approved plans, extends from the east property line of the development to its terminus at the creek in Section 1. A portion of this line, in the approved plans, was constructed by others and is not a part of this request. This is a total of 815 linear feet of 16-inch water main.A total of 623 LUEs are projected for the development. Utilizing the previously referenced criterion the peak hour demand for the development is 1,362 gpm. This results in the need for a 12-inch water line along Forest Creek Drive to keep the flow rate at 5 feet per second or less. The oversizing is the difference of the 16- inch main installed and the 12-inch main that would be required for the development. Attached is a spreadsheet that provides the basis for the proposed reimbursement amount. It is based upon the unit prices from the construction contract. The result is a proposed reimbursement amount of$43,355.00. Should you have questions regarding the preceding please contact the undersigned. Very truly yours, b�- O F T�tX CART R&BURGESS, INC. ••"''••.kg�lt ♦..MA.�.............•. EN�D.,1N!DACECI, Steven D. Widacki P.E. ����'• :� P�a..o• 66138 Senior Project Manager �1Z�.c�;sFG/S F�2yG���~� Attachment ��K�F����� Cc: Joel Robuck, Berkshire, Inc. Jim Coulter, P.E., S.D. Kallman Engineers File—Coiresp. }'i 4 Lake Forest Section 1 UTILITY OVERSIZE REIMBURSEMENT Reimbursement Item Description Quantity Unit Unit Price Amount Item Description Unit Price Amount Amount ' WATER IMPROVMENTS W4 16"DIP Cl.250 815 L.F. $48.00 $39,120.00 W3 12"DIP C1350 $35.00 $28,525.00 $10,595.00 W13 16 Inch Butterfly Valve 2 EA. $3,000.00 $6,000.00 W12 12 Inch Gate Valve $1,250.00 $2,500.00 $3,500.00 W3 12"DIP C1350 Z9`t4(�c �:) 4192' L.F. $35.00 $146 720.00 Est. 10 Inch C900 DR14 �t9tsls�..a) � $31.00 $129,952.00 $16,768.00 W12 12 Inch Gate Valve 10 EA. $1,250.00 $12,500.00 Est. 10 Inch Gate Valve $1,050.00 $10,500.00 $2,000.00 WASTEWATER IMPROVEMENTS WW5 12"SDR 35 PVC(0'to 10') 3518 L.F. $35.00 $123,130.00 WWI 8"SDR 35 PVC Pipe(0'to 10') $33.00 $116,094.00 $7,036.00 WW6 12"SDR 35 PVC(10'to IT) 1103 L.F. $37.00 $40,811.00 WW2 8" SDR 35 PVC Pipe(10'to IT) $35.00 $38,605.00 $2,206.00 WW7 12"SDR 35 PVC(12'to 14') 367 L.F. $39.00 $14,313.00 WW3 8"SDR 35 PVC Pipe(12'to 14') $37.00 $13,579.00 $734.00 WW8 12"SDR 35 PVC(14'to 16) 258 L.F. $42.00 $10,836.00 WW4 8"SDR 35 PVC Pipe(14'to 16) $40.00 $10,320.00 $516.00 s,z.4`✓ TOTAL REIMBURSEMENT FOR OVERSIZING AMOUNT: $43 Note:The estimate(Est.)for the items for 10-inch water line are based upon the average of the contract price for 8-inch and 12-inch units. � o �1, 2¢6 1,.F. X 4 gin. overs, Ze X z .6/ S4- ss'fs 101.x- $1 043 Z1 e44- G.F. >< Z ;H . ovg-s,ze X Z.(�o/ - /�v46 (16") $1 S L.F. X ¢ ,'n , o�s,Ze x'�Z, 6C Cit Z , I�zgs 4.F 6v*-rs,z X 2.bo/in. o6kqrr.S, F. 17 �' ST I O ry o�nd Ro LAKE FOREST SECTION ONE Jw -'W 5%.%. SAGRAPHIMCOUNCILAGENDMENGINEERINMLAKE FOREST\SECTION 1.APR 6112/01 SRW DATE: June 22, 2001 SUBJECT: City Council Meeting—June 28, 2001 ITEM: *12.C.4. Consider a resolution approving the reimbursement to Berkshire, Inc. for the cost of oversizing water mains associated with the construction of Lake Forest, Section 1-A. The developer of Lake Forest, Section 1-A (formerly Section 2) installed 1,298 linear feet of 12" water mains along Fernspring Drive and Lake Forest Drive. According to documentation from the developer's engineer, a 10" main would have been sufficient for the needs of the development. The main was oversized to a 12" to provide for future development in the area. The amount of the reimbursement is $6,749.60. Resource: Jim Nuse, Public Works Director Danny Halden, Chief Engineer History: The developer of Lake Forest, Section 1-A (formerly Section 2) installed 1,298 linear feet of 12" water mains along Fernspring Drive and Lake Forest Drive. According to documentation from the developer's engineer, a 10" main would have been sufficient for the needs of the development. The main was oversized to a 12" to provide for future development in the area. Originally, the development associated with this oversize reimbursement request was entitled Lake Forest, Section 2. However, the Lake Forest, Section 2 plat was never recorded. Subsequently, a new plat was submitted to the Planning and Zoning Commission in order to amend the name to Lake Forest, Section 1-A. The Lake Forest, Section 1-A plat is now recorded. Funding: Cost: $6,749.60 Source of funds: Oversize account Outside Resources: Carter Burgess and Berkshire, Inc. Impact: The oversize will help provide reliability of service in the area and reduce the need for future parallel mains. Benefit: This oversize benefits other developments to occur in the area, including public schools that are under construction. Public Comment: N/A Sponsor: N/A