4B-R-01-12 - 4/12/2001 RESOLUTION NO. 01-12
WHEREAS, the Round Rock Transportation System Development
Corporation ("RRTSDC") has previously adopted a Transportation Capital
Improvement Plan ("Plan") , and
WHEREAS, the RRTSDC wishes to amend said Plan, Now Therefore
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE ROUND ROCK
TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION,
That the amendment to the Transportation Capital Improvement Plan
for the Round Rock Transportation System Development Corporation,
attached hereto as Exhibit "A" , is hereby approved.
The Board of Directors hereby finds and declares that written
notice of the date, hour, place and subject of the meeting at which
this Resolution was adopted was posted and that such meeting was open
to the public as required by law at all times during which this
Resolution and the subject matter hereof were discussed, considered and
formally acted upon, all as required by the Open Meetings Act, Chapter
551, Texas Government Code, as amended, and the Act .
RESOLVED this 12th day of April, 2001 .
ROUND ROCK TRANSPORTATION SYSTEM
DEVELO'P - ORPORA r I ON
By: I A
6/)—
ROBERT A. STLUKA, JR. , President
ATTEST:
, Secretary
0:\WPDOCS\RESOLUTI\RRTSDC\0012.WPD/sc
2001 TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM
ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION
TWO YEAR ELEMENT
Project Name Project Limits Work Description Fiscal Projected Estimated Other Total Cost
Year in Contract Award Trans.Corp. Funding
TCIP Funding
Arterial A From US 79 to Forest Creek Preliminary engineering to establish alignment and 2000 N/A $650,000 $650,000
Drive ROW requirements. Protective ROW purchase
Forest Creek From Double Creek Drive to 2000 April 1,2001 $2,204,030 $2,204,030 $4,408,060
800'West of Forest Ridge
Subdivision
Double Creek From Gattis School Rd to 2000 April 1,2001 $2,500,000 c $2,500,000
Drive MKT ROW
A.W.Grimes Blvd From US 79 to Louis Henna Phase I:Construction from Louis Henna to North of 1999 Fall 2000 $18,100,000 $2,500,000 b $20,600,000
(Arterial B) Blvd Lakecreek Phase II:Construction from North of
Lakecreek to US 79
Arterial C From RM 620 to Sam Bass Acquire ROW for Arterial C and construct 2000 FY 2001 $800,000 $800,000
Rd bicycle/sidewalk facility to access high school and
swimming pool
CR 113 From FM 1460 to CR 122 Design,purchase right-of-way and construct 4-lane 2000 Summer 2001 $4,383,500 $1,116,500 b $5,500,000
divided arterial
FM 1460 From US 79 to 1200'N of US Acquire ROW for highway relocation 2000 FY 2000 $360,000 $5,300,000 a $5,660,000
79
Greenlawn From Louis Henna Blvd to IH Construct 4 lane divided arterial 1998 March 1,1999 $3,825,000 $636,556 b $4,461,556
Extension 35 Frontage Road
Greenlawn At IH 35 Construct Greenlawn Interchange with IH 35 2001 June 1,1999 $5,000,000 $5,000,000 a $10,000,000
Interchange
LEGEND la=State/Federal Fund — _--- __ _ __ _ _—.— —
b=Private — — -- — --- —
c=96 GO Bonds
Id=Williamson County
.
Project Name Project Limits Work Description Fiscal Projected Estimated Other. Total Cost
. Year in Contract Award Trans.Corp. Funding
TCIP Funding
•
Hagler-Bailly Study 1. SH 130 Toll Study;2. SH 45 Implementation 2000 N/A $350,000 $350,000
Strategy;3. Railroad Relocation Feasibility Study;
4. Implementation Strategy for 10-Year Roadway
Plan •
IH 35 Tumarounds FM 1325/Louis Henna Construct frontage road turnarounds 1999 June&Oct 2000 $3,650,000 $3,175,000 a $6,825,000
Hester's Crossing
Prime Strategies Assist City in interagency coordination for SH 45 2000 FY 2000 $100,000 $100,000
RM 620 at Union Pacific Railroad Construct railroad grade separation 2001 FY 2001 $2,500,000 $4,600,000 a $7,100,000
SH 45 Round Rock East City Limits Acquire ROW for SH 45 2000 FY 2000 $15,000,000. a $44,530,00_0
to Round Rock West City $21,530,000 $8,000,000. d
South Mays Street South Mays Street,Dell Way Realign streets,widen streets,extend streets 1999 August 2000&FY $4,580,000 $5,876,000 a $10,456,000
Improvements &Gattis School Road 2001
Extension
Traffic Signals Various locations Design and construct traffic signals 2001 2000 $800,000 $800,000
Traffic Modeling Citywide(SH 130) Assist City in assessing impacts of SH 130 2000 N/A $75,000 $75,000
Traffic Signal FM 1325/Louis Henna Construct and implement coordinated traffic signal 1998 May 1,2000 $100,000 $100,000
Coordination McNeil/IH 35/RM 620 US 79 systems
US 79 From CR 195 to CR 110 Reconstruct highway to 4 lane divided highway 1999 December-99 — $2,550,000 $3,500,000. a $6,350,000
$300,000: (est)d
US 79 From FM 1460 to CR 195 Construct 4-lane divided highway 2000 FY 2001 $4,400,000 $3,000,000: a $7,400,000
Transportation Miscellaneous consulting work in support of 2001 N/A $200,000 $200,000
Consulting transportation program
TWO YEAR ELEMENT $78,657,530 $60,208,086' $138,865,616
LEGEND a=State/Federal Fund —___—
_ — b=Private --- • — •
•
—
_ c=96 GO Bonds -- -- — --- -- —
d=Williamson County
i
LION CAPITAL IMPROVEMENTS PROGRAM
TATION SYSTEM DEVELOPMENT CORPORATION _ _
TWO YEAR ELEMENT -
iption Fiscal Projected Estimated Other Total Cost
Year in Contract Award Trans. Corp. Funding
TCIP Funding
iablish alignment and 2. 000 N/A - $650,000 $650,000
re ROW purchase
2000 April 1, 2001 $2,204,030 $2,204,030 $4,408,060
•
2000 April 1,2001 $2,500,000 c $2,500,000
.uis Henna to North of 1999 Fall 2000 $18,100,000 $2,500,000 b $20,600,000
:tion from North of '
Id construct 2000 FY 2001 $800,000 $800,000
ess high school and
and construct 4-lane 2000 Summer 2001 $4,383,500 $1,116,500, b $5,500,000
>cation 2000 FY 2000 $360,000 $5,300,000; a. $5,660,000
ial 1998 March 1, 1999 $3,825,000 $636,556, b $4,461,556
Inge with IH 35 2001 June 1, 1999 $5,000,000 $5,000,000; a $10,000,000
•
I
•
ription Fiscal Projected . Estimated Other. ' Total Cost
Year in Contract Award Trans. Corp. Funding
TCIP Funding
45 Implementation • 2000 N/A $350,000 $350,000
tion Feasibility Study;
or 10-Year Roadway •
:rounds 1999 June&Oct 2000 $3,650,000 $3,175,000 a $6,825,000
)rdination for SH 45 2000 FY 2000 $100,000 $100,000
ration 2001 FY 2001 $2,500,000 $4,600,000: a $7,100,000
2000 FY 2000 - $15,000,000 a $44,530,000
$21,530,000 $8,000,000, d
• 3, extend streets 1999 August 2000&FY $4,580,000 $5,876,000 a $10,456,000
2001
ignals 2001 2000 $800,000 i $800,000
cts of SH 130 2000 N/A $75,000 } $75,000
►rdinated traffic signal 1998 May 1,2000 $100,000 , I $100,000
e divided highway 1999 December-99 $2,550,000 $3,500,000 a $6,350,000
$300,000 (est)d
sway 2000 FY 2001 $4,400,000 $3,000,000; a $7,400,000
•k in support of 2001 N/A $200,000 $200,000
TWO YEAR ELEMENT `•. $78,657,530 $60,208;086":' $138,865,616
{