Loading...
4B-R-01-12 - 4/12/2001 RESOLUTION NO. 01-12 WHEREAS, the Round Rock Transportation System Development Corporation ("RRTSDC") has previously adopted a Transportation Capital Improvement Plan ("Plan") , and WHEREAS, the RRTSDC wishes to amend said Plan, Now Therefore BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION, That the amendment to the Transportation Capital Improvement Plan for the Round Rock Transportation System Development Corporation, attached hereto as Exhibit "A" , is hereby approved. The Board of Directors hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act . RESOLVED this 12th day of April, 2001 . ROUND ROCK TRANSPORTATION SYSTEM DEVELO'P - ORPORA r I ON By: I A 6/)— ROBERT A. STLUKA, JR. , President ATTEST: , Secretary 0:\WPDOCS\RESOLUTI\RRTSDC\0012.WPD/sc 2001 TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION TWO YEAR ELEMENT Project Name Project Limits Work Description Fiscal Projected Estimated Other Total Cost Year in Contract Award Trans.Corp. Funding TCIP Funding Arterial A From US 79 to Forest Creek Preliminary engineering to establish alignment and 2000 N/A $650,000 $650,000 Drive ROW requirements. Protective ROW purchase Forest Creek From Double Creek Drive to 2000 April 1,2001 $2,204,030 $2,204,030 $4,408,060 800'West of Forest Ridge Subdivision Double Creek From Gattis School Rd to 2000 April 1,2001 $2,500,000 c $2,500,000 Drive MKT ROW A.W.Grimes Blvd From US 79 to Louis Henna Phase I:Construction from Louis Henna to North of 1999 Fall 2000 $18,100,000 $2,500,000 b $20,600,000 (Arterial B) Blvd Lakecreek Phase II:Construction from North of Lakecreek to US 79 Arterial C From RM 620 to Sam Bass Acquire ROW for Arterial C and construct 2000 FY 2001 $800,000 $800,000 Rd bicycle/sidewalk facility to access high school and swimming pool CR 113 From FM 1460 to CR 122 Design,purchase right-of-way and construct 4-lane 2000 Summer 2001 $4,383,500 $1,116,500 b $5,500,000 divided arterial FM 1460 From US 79 to 1200'N of US Acquire ROW for highway relocation 2000 FY 2000 $360,000 $5,300,000 a $5,660,000 79 Greenlawn From Louis Henna Blvd to IH Construct 4 lane divided arterial 1998 March 1,1999 $3,825,000 $636,556 b $4,461,556 Extension 35 Frontage Road Greenlawn At IH 35 Construct Greenlawn Interchange with IH 35 2001 June 1,1999 $5,000,000 $5,000,000 a $10,000,000 Interchange LEGEND la=State/Federal Fund — _--- __ _ __ _ _—.— — b=Private — — -- — --- — c=96 GO Bonds Id=Williamson County . Project Name Project Limits Work Description Fiscal Projected Estimated Other. Total Cost . Year in Contract Award Trans.Corp. Funding TCIP Funding • Hagler-Bailly Study 1. SH 130 Toll Study;2. SH 45 Implementation 2000 N/A $350,000 $350,000 Strategy;3. Railroad Relocation Feasibility Study; 4. Implementation Strategy for 10-Year Roadway Plan • IH 35 Tumarounds FM 1325/Louis Henna Construct frontage road turnarounds 1999 June&Oct 2000 $3,650,000 $3,175,000 a $6,825,000 Hester's Crossing Prime Strategies Assist City in interagency coordination for SH 45 2000 FY 2000 $100,000 $100,000 RM 620 at Union Pacific Railroad Construct railroad grade separation 2001 FY 2001 $2,500,000 $4,600,000 a $7,100,000 SH 45 Round Rock East City Limits Acquire ROW for SH 45 2000 FY 2000 $15,000,000. a $44,530,00_0 to Round Rock West City $21,530,000 $8,000,000. d South Mays Street South Mays Street,Dell Way Realign streets,widen streets,extend streets 1999 August 2000&FY $4,580,000 $5,876,000 a $10,456,000 Improvements &Gattis School Road 2001 Extension Traffic Signals Various locations Design and construct traffic signals 2001 2000 $800,000 $800,000 Traffic Modeling Citywide(SH 130) Assist City in assessing impacts of SH 130 2000 N/A $75,000 $75,000 Traffic Signal FM 1325/Louis Henna Construct and implement coordinated traffic signal 1998 May 1,2000 $100,000 $100,000 Coordination McNeil/IH 35/RM 620 US 79 systems US 79 From CR 195 to CR 110 Reconstruct highway to 4 lane divided highway 1999 December-99 — $2,550,000 $3,500,000. a $6,350,000 $300,000: (est)d US 79 From FM 1460 to CR 195 Construct 4-lane divided highway 2000 FY 2001 $4,400,000 $3,000,000: a $7,400,000 Transportation Miscellaneous consulting work in support of 2001 N/A $200,000 $200,000 Consulting transportation program TWO YEAR ELEMENT $78,657,530 $60,208,086' $138,865,616 LEGEND a=State/Federal Fund —___— _ — b=Private --- • — • • — _ c=96 GO Bonds -- -- — --- -- — d=Williamson County i LION CAPITAL IMPROVEMENTS PROGRAM TATION SYSTEM DEVELOPMENT CORPORATION _ _ TWO YEAR ELEMENT - iption Fiscal Projected Estimated Other Total Cost Year in Contract Award Trans. Corp. Funding TCIP Funding iablish alignment and 2. 000 N/A - $650,000 $650,000 re ROW purchase 2000 April 1, 2001 $2,204,030 $2,204,030 $4,408,060 • 2000 April 1,2001 $2,500,000 c $2,500,000 .uis Henna to North of 1999 Fall 2000 $18,100,000 $2,500,000 b $20,600,000 :tion from North of ' Id construct 2000 FY 2001 $800,000 $800,000 ess high school and and construct 4-lane 2000 Summer 2001 $4,383,500 $1,116,500, b $5,500,000 >cation 2000 FY 2000 $360,000 $5,300,000; a. $5,660,000 ial 1998 March 1, 1999 $3,825,000 $636,556, b $4,461,556 Inge with IH 35 2001 June 1, 1999 $5,000,000 $5,000,000; a $10,000,000 • I • ription Fiscal Projected . Estimated Other. ' Total Cost Year in Contract Award Trans. Corp. Funding TCIP Funding 45 Implementation • 2000 N/A $350,000 $350,000 tion Feasibility Study; or 10-Year Roadway • :rounds 1999 June&Oct 2000 $3,650,000 $3,175,000 a $6,825,000 )rdination for SH 45 2000 FY 2000 $100,000 $100,000 ration 2001 FY 2001 $2,500,000 $4,600,000: a $7,100,000 2000 FY 2000 - $15,000,000 a $44,530,000 $21,530,000 $8,000,000, d • 3, extend streets 1999 August 2000&FY $4,580,000 $5,876,000 a $10,456,000 2001 ignals 2001 2000 $800,000 i $800,000 cts of SH 130 2000 N/A $75,000 } $75,000 ►rdinated traffic signal 1998 May 1,2000 $100,000 , I $100,000 e divided highway 1999 December-99 $2,550,000 $3,500,000 a $6,350,000 $300,000 (est)d sway 2000 FY 2001 $4,400,000 $3,000,000; a $7,400,000 •k in support of 2001 N/A $200,000 $200,000 TWO YEAR ELEMENT `•. $78,657,530 $60,208;086":' $138,865,616 {