Loading...
4B-R-02-23 - 9/12/2002 RESOLUTION NO. 02-23 WHEREAS, the Round Rock Transportation System Development Corporation ("RRTSDC" ) has previously adopted a Transportation Capital Improvement Plan ("Plan" ) , and WHEREAS, the RRTSDC wishes to amend said Plan, Now Therefore BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION, That the amendment to the Transportation Capital Improvement Plan for the Round Rock Transportation System Development Corporation, attached hereto as Exhibit "A" , is hereby approved. The Board of Directors hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 12th day of September, 2002 . ROUND ROCK TRANSPORTAT % l SYSTEM DEVELO''• i T OR' r9 'ON By: �4 rf WELL, President _` ATTEST: /104A- tr 11-614=41, Secretary 0:\wdox\RESOLUTI\rrtsdc\0023.WPD/sc 2001 TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION TWO YEAR ELEMENT • • Fiscal Year Estimated Trans:Corp. • Project Name -Project Limits• Work Description -in.TCIP` •Construction Date Funding • Other Funding., . :- `Total Cost • Arterial A From US 79 to Forest Creek Drive Preliminary engineering to establish 2000 N/A $650,000 $650,000 alignment and ROW requirements. Protective ROW purchase • Forest Creek From Double Creek Drive to 800' 2000 April 1,2001 $2,204,030 $2,204,030 $4,408,060 West of Forest Ridge Subdivision Double Creek Drive From Gattis School Rd to MKT 2000 Summer 2003 $2,500,000 c $2,500,000 ROW A.W.Grimes Blvd From US 79 to Louis Henna Blvd Phase I: Preliminary Engineering; 1999 Fall 2000 $18,100,000 ' $2,500,000 b $20,600,000 (Arterial B) Phase II: Engineering,ROW,& Construction from Louis Henna to 1900'South along CR 170 • (Pflugerville Loop); Phase III: ROW Acquisition-4 Tracts (Hardship Purchase) Arterial C From RM 620 to Sam Bass Rd Acquire ROW for Arterial C and 2000 Summer 2003 $800,000 $800,000 construct bicycle/sidewalk facility to access high school and swimming • pool CR 113 From FM 1460 to CR 122 Design,purchase right-of-way and . 2000 Spring 2003 $4,383,500 $1,116,500 b $5,500,000 construct 4-lane divided arterial FM 1460 From US 79 to 1200'N of US 79 Acquire ROW for highway relocation 2000 Winter 2003 $600,000 $5,300,000 a $5,900,000 Greenlawn Extension From Louis Henna Blvd to IH 35 Construct 4 lane divided arterial 1998 March 1,1999 $3,825,000 $636,556 a $4,461,556 Frontage Road • Greenlawn At IH 35 Construct Greenlawn Interchange 2001 Not Scheduled $5,000,000 $5,000,000 a $10,000,000 Interchange with IH 35 Hagler-Baiily Study 1. SH 130 Toll Study;2. SH 45 Implementation Strategy;3. Railroad 2000 • N/A • $350,000 $350,000 Relocation Feasibility Study;4. Implementation Strategy for 10-Year Roadway Plan LEGEND a=State/Federal Fund • Page 1 of 2 b=Private Amendment#6 c=96 GO Bonds • EXHIBIT Updated 8/22/02 d=Williamson County "An 2001 TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAN ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATIOI\ TWO YEAR ELEMENT ., • Fiscal Year • Estimated Trans.Corp. • , ``Project Name - . Project Limits,-:'.` =: 'Work Description•:„•. In TCIP • .- . Funding • • Other Funding • • Total Cost II-135 Turnarounds FM 1325/Louis Henna Construct frontage road turnarounds 1999 June&Oct 2000 $3,650,000 $3,175,000 a $6,825,000 Nester's Crossing IH 35 Area from Westinghouse Road to FM provide schematics,estimates,and 2002 $100,000 $100,000 Improvements 1431 TIA for various road Improvements Prime Strategies Assist City in interagency 2000 N/A $100,000 $100,000 coordination for SH 45 • RM 620 at Union Pacific Railroad Construct railroad grade separation 2001 Not Scheduled $2,500,000 $4,600,000 a $7,100,000 Regional Mobility SH 45 North,US 183A,and Loop Evaluate advantages& 2002 November 1,2001 $75,000 $75,000 Authority Study 1 disadvantages to RR in establishing an RMA SH 45 Round Rock East City Limits to Acquire ROW for SH 45 2000 FY 2000 $15,000,000 a $53,000,000 Round Rock West City Limits $30,000,000 $8,000,000 d South Mays Street South Mays Street,Dell Way& Realign streets,widen streets, 1999 August 2000&FY $4,580,000 $5,876,000 a $10,456,000 Improvements Gattis School Road Extension extend streets 2001 Traffic Signals Various locations Design and construct traffic signals 2001 2000 $800,000 $800,000 Traffic Modeling Citywide(SH 130) Assist City in assessing impacts of 2000 N/A $75,000 $75,000 SH 130 Traffic Signal FM 1325/Louis Henna McNeil/IH Construct and implement 1998 May 1,2000 $100,000 $100,000 Coordination 35/RM 620 US 79 coordinated traffic signal systems US 79 From CR 195 to CR 110 Reconstruct highway to 4 lane 1999 December-99 $2,550,000 $3,500,000 a $6,350,000 divided highway • • $300,000 (est) d US 79 From FM 1460 to CR 195 Construct 4-lane divided highway 2000 Spring 2004 • $4,160,000 $3,000,000 .a $7,160,000 Transportation Miscellaneous consulting work In 2001 N/A $200,000 $200,000 Consulting • supoort of transportation program • LEGEND a=State/Federal Fund TWONEAR ELEMENT.TOTAL c',•:?. %.'.-:`;:•:;:.$87,302;530 S', ,?S•,i,41I$60;208,086:= ;"C1;M $147,510,616 b=Private Page 2 of 2 c=96 GO Bonds • Amendment#6 d=Williamson County Updated 8/22/02 DATE: September 6,2002 SUBJECT: City Council Meeting—September 12, 2002 ITEM: 13.C.5. Consider a resolution approving the action of the Round Rock Transportation System Development Corporation in amending the Transportation Capital Improvement Plan. Resource: Jim Nuse, Chief of Operations/Assistant City Manager Tom Word,Director of Transportation Services History: The Transportation Capital Improvement Program (TCIP) is a two-year spending plan for improvements to major roads and arterials in the City. Funding for this plan is provided through the %2% sales tax established for the purpose of transportation improvements. The TCIP is being amended to supplement funding for an additional project to provide schematics, estimates and TIA for various road improvements around I-35 from Westinghouse Road to FM 1431. Funding: Cost: $100,000 Source of funds: '/2% sales tax (Round Rock Transportation System Development Corporation) Outside Resources:N/A Impact/Benefit: Increased mobility and traffic safety in Round Rock. Public Comment: A public hearing for these amendments was held by the Round Rock Transportation System Development Corporation August 8, 2002. Sponsor: N/A s� DATE: September 6, 2002 SUBJECT: Transportation System Development Corporation—September 12, 2002 ITEM: 6.A. Consider a resolution approving amendments to the Transportation Capital Improvement Plan(TCIP)to supplement funding for an additional project to provide schematics, estimates and traffic impact analysis for various road improvements in the area around IH-35 from Westinghouse Road to FM 1431. Resource: Tom Word,Director of Transportation Services History: The Transportation Capital Improvement Program(TCIP) is a two-year spending plan for improvements to major roads and arterials in the City. Funding for this plan is provided through the %z% sales tax established for the purpose of transportation improvements. The TCIP is being amended to supplement funding for an additional project to provide schematics, estimates and TIA for various road improvements around I-35 from Westinghouse Road to FM 1431. Funding: Cost: $100,000 Source of funds: %z% sales tax (Round Rock Transportation System Development Corporation) Outside Resources: N/A ImpactBenefit: Increased mobility and traffic safety in Round Rock. Public Comment: A public hearing for these amendments held by the Round Rock Transportation System Development Corporation September 12, 2002. Sponsor: N/A