Loading...
4B-R-04-29 - 1/22/2004 RESOLUTION NO. 04-29 WHEREAS, the Round Rock Transportation System Development Corporation ("RRTSDC") has previously adopted a Transportation Capital Improvement Plan ("Plan") , and WHEREAS, the RRTSDC wishes to amend said Plan, Now Therefore BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION, That the amendment to the Transportation Capital Improvement Plan for the Round Rock Transportation System Development Corporation, attached hereto as Exhibit "A" , is hereby approved. The Board of Directors hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 22nd day of January, 2004 . ROUND ROCK TRANSPORTATIO► DEVELOPMEN- Ce' 'O' By: SWELL, /NY President ATTEST: lizcotat...._ 4a, # 4? 1).1 Secretary @PEDesktop\::ODMA/WORLDOX/O':/WDOX/RESOLUTI/RRTSDC/0029.WPD/SC - • 2003 TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION Vi '' $ ' a ,, r,, Additional Trans; `i�r y z � V 3 r prior "Corp Funding k, Estimated Trans ,, 1 i. s1 Funding(Amend.: (this' ° ProjeeCName ,>5 ,_0� �Project""Limits',+.-mow 1��� .,#.t'. .��Work:Descdption , �=;r�W",:.GonstmcNonDate ' <Corp:Funding-C .�,.-;.,, Otfie`r`Funding��v.;. =:.TotaLCoSf" °'" '� 't..vNo.B),i:� °' Amendment) Arterial A From US 79 to Forest Creek Drive Preliminary engineering to establish N/A $650,000 $650,000 alignment and ROW requirements. Protective ROW purchase Forest Creek From Double Creek Drive to 800'West Summer 2003 $2,951,741 $1,170,640 b $4,200,000 of Forest Ridge Subdivision $209,000 $77,619 e CR 122(Red Bud) From CR 123 to US 79 PS&E Design Services $249,363 $0 $249,363 $249,363 Construct 5-lane section,Bridge,R R X-ing $3,375,909 $0 $3,375,909 $3,375,909 Double Creek Drive From Gattis School Rd to MKT ROW Fall 2003 $2,850,000 $2,850,000 A.W.Grimes Blvd(Arterial From US 79 to Louis Henna Blvd Fall 2000 $20,801,354 $1,982,701 b B) $23,550,000 $765,945 e Arterial C From RM 620 to Sam Bass Rd Acquire ROW for Arterial C and construct Summer 2004 $800,000 $800,000 - bicycle/sidewalk facility to access high school and swimming pool Kiphen Road(CR 113) From FM 1460 to CR 122 Design,purchase right-of-way and construct Fall 2003 $7,367,350 $222,650 b $8,590,000 4-lane divided arterial $1,000,000 d FM 1460 From US 79 to 1200'N of US 79 Acquire ROW for highway relocation Fall 2003 $600,000 $8,200,000 a $8,800,000 Greenlawn Extension From Louis Henna Blvd to IH 35 Construct 4 lane divided arterial Complete $3,825,000 $86,556 b $4,458,695 Frontage Road $547,139 e Greenlawn Interchange At IH 35 Construct Greenlawn Interchange with IH 35 Not Scheduled $5,000,000 $12,000,000 a $17,000,000 IH 35 Turnarounds FM 1325/Louis Henna Construct frontage road tumarounds Complete $3,533,562 $3,175,000 a $7,036,562 ($116,430) $328,000 c IH 35 Area Improvements from Westinghouse Road to FM 1431 Relocate ramps,widen frontage road,and Summer 2004 $6,000,000 $6,000,000 construct frontage road turnaround $1,000,000 IH 35 Frontage Rd C-D and IH 35 @ Hester's Crossing Construct Frontage road collector-distributor Fall 2003 $7,650,000 $7,650,000 Hester's Crossing Bridge and replace Hester's Crossing Bridge Replacement $1,150,000 Prime Strategies Assist City in interagency coordination for N/A $100,000 $100,000 SH 45 RM 620 at Union Pacific Railroad Construct railroad grade separation Fall 2005 $2,500,000 $8,500,000 a $11,000,000 SH 45 Round Rock East City Limits to Round Acquire ROW for SH 45 FY 2000 $215,200,000 a $272,576,911 Rock West City Limits $31,376,911 $26,000,000 d (est) South Mays Street South Mays Street,Dell Way&Gattis Realign streets,widen streets,extend August 2000&FY $4,980,000 $4,980,000 Improvements School Road Extension streets 2001 Traffic Signals Various locations Design and construct traffic signals 2000 $800,000 $800,000 Traffic Signal Coordination FM 1325/Louis Henna McNeil/IH Construct and implement coordinated traffic Summer 2003 $100,000 $100,000 35/RM 620 US 79 signal systems US 79 From CR 195 to CR 110 Reconstruct highway to 4 lane divided December-99 $2,550,000 $3,500,000 a $6,350,000 highway $300,000 (est) d US 79 From FM 1460 to CR 195 Construct 4-lane divided highway Fall 2003 $5,240,000 $3,000,000 a $8,240,000 Transportation Consulting Miscellaneous consulting work in supoort of N/A $200,000 $200,000 transportation program ,'" ' • -.@,YEAR'ELEMENT.TOTAL. ,n -..""$113,501,190,= ' 4s4$286,056,250- k v $399,557,440-', x`$2,242,570,.,""' ;:$3,625,272; . LEGEND Page 1 of 1 a=State/Federal Fund '. EXHIBIT Amendment No.9 b=Private Updated 01/05/04 c-1997 CO Transportation A )' 1 d=Williamson County 3 (� 1 e-City Utility Fund