4B-R-04-29 - 1/22/2004 RESOLUTION NO. 04-29
WHEREAS, the Round Rock Transportation System Development
Corporation ("RRTSDC") has previously adopted a Transportation Capital
Improvement Plan ("Plan") , and
WHEREAS, the RRTSDC wishes to amend said Plan, Now Therefore
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE ROUND ROCK
TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION,
That the amendment to the Transportation Capital Improvement Plan
for the Round Rock Transportation System Development Corporation,
attached hereto as Exhibit "A" , is hereby approved.
The Board of Directors hereby finds and declares that written
notice of the date, hour, place and subject of the meeting at which
this Resolution was adopted was posted and that such meeting was open
to the public as required by law at all times during which this
Resolution and the subject matter hereof were discussed, considered and
formally acted upon, all as required by the Open Meetings Act, Chapter
551, Texas Government Code, as amended.
RESOLVED this 22nd day of January, 2004 .
ROUND ROCK TRANSPORTATIO►
DEVELOPMEN- Ce' 'O'
By:
SWELL,
/NY President
ATTEST: lizcotat...._
4a, # 4? 1).1 Secretary
@PEDesktop\::ODMA/WORLDOX/O':/WDOX/RESOLUTI/RRTSDC/0029.WPD/SC - •
2003 TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM
ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION
Vi '' $ ' a ,, r,, Additional Trans;
`i�r
y z � V 3 r prior "Corp Funding
k,
Estimated Trans ,, 1 i. s1 Funding(Amend.: (this'
° ProjeeCName ,>5 ,_0� �Project""Limits',+.-mow 1��� .,#.t'. .��Work:Descdption , �=;r�W",:.GonstmcNonDate ' <Corp:Funding-C .�,.-;.,, Otfie`r`Funding��v.;. =:.TotaLCoSf" °'" '� 't..vNo.B),i:� °' Amendment)
Arterial A From US 79 to Forest Creek Drive Preliminary engineering to establish N/A $650,000 $650,000
alignment and ROW requirements.
Protective ROW purchase
Forest Creek From Double Creek Drive to 800'West Summer 2003 $2,951,741 $1,170,640 b $4,200,000
of Forest Ridge Subdivision $209,000
$77,619 e
CR 122(Red Bud) From CR 123 to US 79 PS&E Design Services $249,363 $0 $249,363 $249,363
Construct 5-lane section,Bridge,R R X-ing $3,375,909 $0 $3,375,909
$3,375,909
Double Creek Drive From Gattis School Rd to MKT ROW Fall 2003 $2,850,000 $2,850,000
A.W.Grimes Blvd(Arterial From US 79 to Louis Henna Blvd Fall 2000 $20,801,354 $1,982,701 b
B) $23,550,000
$765,945 e
Arterial C From RM 620 to Sam Bass Rd Acquire ROW for Arterial C and construct Summer 2004 $800,000 $800,000 -
bicycle/sidewalk facility to access high
school and swimming pool
Kiphen Road(CR 113) From FM 1460 to CR 122 Design,purchase right-of-way and construct Fall 2003 $7,367,350 $222,650 b $8,590,000
4-lane divided arterial
$1,000,000 d
FM 1460 From US 79 to 1200'N of US 79 Acquire ROW for highway relocation Fall 2003 $600,000 $8,200,000 a $8,800,000
Greenlawn Extension From Louis Henna Blvd to IH 35 Construct 4 lane divided arterial Complete $3,825,000 $86,556 b $4,458,695
Frontage Road
$547,139 e
Greenlawn Interchange At IH 35 Construct Greenlawn Interchange with IH 35 Not Scheduled $5,000,000 $12,000,000 a $17,000,000
IH 35 Turnarounds FM 1325/Louis Henna Construct frontage road tumarounds Complete $3,533,562 $3,175,000 a $7,036,562 ($116,430)
$328,000 c
IH 35 Area Improvements from Westinghouse Road to FM 1431 Relocate ramps,widen frontage road,and Summer 2004 $6,000,000 $6,000,000
construct frontage road turnaround $1,000,000
IH 35 Frontage Rd C-D and IH 35 @ Hester's Crossing Construct Frontage road collector-distributor Fall 2003 $7,650,000 $7,650,000
Hester's Crossing Bridge and replace Hester's Crossing Bridge
Replacement $1,150,000
Prime Strategies Assist City in interagency coordination for N/A $100,000 $100,000
SH 45
RM 620 at Union Pacific Railroad Construct railroad grade separation Fall 2005 $2,500,000 $8,500,000 a $11,000,000
SH 45 Round Rock East City Limits to Round Acquire ROW for SH 45 FY 2000 $215,200,000 a $272,576,911
Rock West City Limits $31,376,911 $26,000,000 d
(est)
South Mays Street South Mays Street,Dell Way&Gattis Realign streets,widen streets,extend August 2000&FY $4,980,000 $4,980,000
Improvements School Road Extension streets 2001
Traffic Signals Various locations Design and construct traffic signals 2000 $800,000 $800,000
Traffic Signal Coordination FM 1325/Louis Henna McNeil/IH Construct and implement coordinated traffic Summer 2003 $100,000 $100,000
35/RM 620 US 79 signal systems
US 79 From CR 195 to CR 110 Reconstruct highway to 4 lane divided December-99 $2,550,000 $3,500,000 a $6,350,000
highway
$300,000 (est)
d
US 79 From FM 1460 to CR 195 Construct 4-lane divided highway Fall 2003 $5,240,000 $3,000,000 a $8,240,000
Transportation Consulting Miscellaneous consulting work in supoort of N/A $200,000 $200,000
transportation program
,'" ' • -.@,YEAR'ELEMENT.TOTAL. ,n -..""$113,501,190,= ' 4s4$286,056,250- k v $399,557,440-', x`$2,242,570,.,""' ;:$3,625,272; .
LEGEND Page 1 of 1
a=State/Federal Fund '. EXHIBIT Amendment No.9
b=Private
Updated 01/05/04
c-1997 CO Transportation A )' 1
d=Williamson County 3 (� 1
e-City Utility Fund