Loading...
4b-r-04-31 - 8/12/2004 RESOLUTION NO. 04-31 WHEREAS, the Round Rock Transportation System Development Corporation ("RRTSDC") has previously adopted a Transportation Capital Improvement Plan ("Plan") , and WHEREAS, the RRTSDC wishes to amend said Plan, Now Therefore BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION, That the amendment to the Transportation Capital Improvement Plan for the Round Rock Transportation System Development Corporation, attached hereto as Exhibit "A" , is hereby approved. The Board of Directors hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 12th day of August, 2004 . ROUND ROCK TRANSPORTATION S DEVELOPMENT CO"ORATI•►. By: - 4047 Presid-• ATTFST: 2,0/2_ W. IATIItPA) Secretary @PFDesktop\.:ODMA/WORLDOX/O:/WDOX/RESOLUTI/RRTSDC/0031.WPD/sc 2003 TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION y. .,;,5 ; x Y" r[ 5,rWoik De lion, ,,.. =.,s COnstrd,,r ,cote:.rEst(itra4ed-Transit. "'Other',,,-,,n Tri(a ,,,, �"PHo Trans: " ;Ad ry t � i �c; va,r ,: .. �.. �. i rJ': P .f.. sg ya �,�„ i./�y ,�,� 9 i �-. � r, .r'., dit(o{lalTratt5: to - ,.x t ` ''' r^ r „a via '1 V Corpundin a �' '� Corpund �� � ,s r � �- ,� ��,. TP H �"saxr rp In9 t'.. Corp Fundln9 ittils.. ProjectNamet /, ',ProjeetUmits� { -s $ '- y 47- ,°?-,4, s.''.`' `" 4 x .:y , (Amend#9) iAmeed) '` lr iFi' r _C iiii y ?z #I Sox x24 t 1: r ,„5 r, x >>5' fl :",z, t y' 'ii.,',„'.;:,---; ::,.., 4..y 3 `s, ., s f, i 3-1: ,F x r' i ' S .1>>y i T > ",r�rc, r a . ,( a.�ks�..-. ..�... . . ��r.. �. .. ,r��, .�,�,. -� _ �� `��°� ��S �:. �r-. �r �' ..fa .��.��,rM,.,,A. Mali ����.r= �,„ y �,,. ,..�` � A<_�;�'°S AAs':: Preliminary engineering to establish alignment and N/A $1,150,000 $1,150,000 $500,000 Arterial A From US 79 to Forest Creek Drive ROW requirements.Protective ROW purchase • From Double Creek Drive to 600'West of Forest Fall 2004 $3,006,179 $1,294,526 b $4,378,310 $54,438 Forest Creek Ridge Subdivision $77,614 e Fall 2004 $2,850,000 $2,850,000 Double Creek Drive From Gattis School Rd to MKT ROW A.W.Grimes Blvd(Arterial B) From US 79 to Louis Henna Blvd Fall 2000 $20,801,354 $1,765,945 b $23,550,000 $765,845 e Acquire ROW for Arterial C and construct Summer 2007 $800,000 $800,000 Arterial C From RM 620 to Sam Bass Rd bicycle/sidewalk facility to access high school and swimming pool Design,purchase right-of-way and construct 4- Fall 2006 $7,367,350 $222,650 b $8,590,000 Kiphen Road(CR 113) From FM 1460 to CR 122 lane divided arterial $1,000,000 d Acquire ROW for highway relocation Fall 2003 $600,000 $8,200,000 a $8,800,000 FM 1460 From US 79 to 1200'N of US 79 Construct 4 lane divided arterial Complete $3,825,000 588,556 b $4,458,695 Greenlawn Extension From Louis Henna Blvd to IH 35 Frontage Road $547,139 e Construct Greenlawn Interchange with IH 35 Not Scheduled $5,000,000 $12,000,000 a $17,000,000 Greenlawn Interchange At IH 35 Construct frontage road tumarounds Completed $3,533,562 $3,175,000 a $7,038,562 IH 35 Turnarounds FM 1325/Louis Henna/Hester's Crossing $328,000 c Relocate ramps,widen frontage road,and Summer 2004 $6,000,000 $6,000,000 IH 35 Area Improvements from Westinghouse Road to FM 1431 construct frontage road turnaround IH 35 Frontage Rd GD and Hester's Crossing Construct Frontage road collector-distributor and Winter 2005 $7,650,000 $7,650,000 Bridge Replacement IH 35(a!Hester's Crossing - replace Hester's Crossing Bridge Alternatives to alleviate congestion 14/A $87,400 $87,400 $87,400 Feasibilitiy Study IH-35&RM 620 and IN 35&US 79 Assist City in interagency coordination for SH 45 N/A $52,326 552,326 -$47,874 Prime Strategies . ' Construct 2-lane divided roadway Fall 2004 $596,706 $596,706 $596,708 Red Bud Lane(CR 122,Phases 1&2) From Gattis School Road to CR 123 PS&E Design services;Construct 5-lane section, $277,383 $0 5277,363 $249,363 $28.000 Red Bud Lane(CR 122,Phase 3) From CR 123 to US 79 Bridge,Railroad crossing $3,375,909 $140,284 $3,518,173 $3,375,909 Construct railroad grade separation Fall 2005 $2,500,000 $8,500,000 a $11,000,000 RM 820 at Union Pacific Railroad Round Rock East City Limits to Round Rock West Acquire ROW for SH 45 FY 2000 $215,200,000 a $272,576,911 SH 45 City Limits $31,376,911 $26,000,000 d (est) South Mays Street,Dell Way&Gattis School Road Realign streets,widen streets,extend streets August 2000&FY $4,980,000 $4,980,000 • South Mays Street Improvements Extension - 2001 Design and construct traffic signals 2000 $1,400,000 $1,400,000 $600,000 Traffic Signals Various locations Construct and Implement coordinated traffic signal Summer 2003 - $100,000 $100,000 Traffic Signal Coordination FM 1325/Louts Henna McNeil/1H 35/RM 820 US 79systems Reconstruct highway to 4 lane divided highway Completed $2,550,000 $3,500,000 a $6,350,000 US 79 I From CR 195 to CR 110 $300,000(est) d Construct 4-lane divided highway Spring 2005 $8,012,745 $3,000,000 a $11,012,745 $2,772,744 US 79 From FM 1460 to CR 195 Miscellaneous consulting work in supoort of N/A $341,961 $341,961 $141,961 Transportation Consulting transportation program 'd' at tr"=s5<r.",3-YEARtELEMENTSTOTALtf~54,55.55.-r.54.5=>ss5 : •Tee rs#-.xv-,,,4285,329,395....',,, .- '-r.'$4114;655161 $3,625,272 $4,733,575 LEGEND a e Stale/Federal Fund EXHIBIT Amendment#10 ' • b e Private Updated 8/12/04 c-1997 CO Transportation d=Williamson County a e-City Utility Fund ti A-r"It